Welcome Guest

Piping / PDS / PDMS >> Piping Design Engineer / Designer/ Supervisor 
Piping Supervisor Resume Sample, Experience : 20 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Piping Supervisor
Job related skills / software:Ensure sub-contractors execute their works accurately in accordance to the approved shop-drawings, technical submissions and checklists.
Category:Piping / PDS / PDMS
Sub Category:Piping Design Engineer / Designer/ Supervisor
Years of Experience:20 years
State:Uttar Pradesh
Gender:Male
Salary Expected per Month(Rs):50,000 to 60,000
Highest Qualification attained:Diploma
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

RESUME:
MUMTAZ ALI

E-mail- mumtazali9719 AT gmail.com

WORK EXPERIENCE :
18 years Experience in Construction & EPC Engineering Company.  

PROFESSIONAL EXPERIENCE :
Supervision and inspection including planning for Fabrication, erection ,Hydro Testing, and construction activity of (AG & UG) CS, SS, AS &IBR Firefighting, piping. Making of Hydro test package, checking of all line with ISO and P&ID. Pre-hydro punch making and killing. Certification of measurements and progress Report carry out by contractor.

TECHNICAL/FUNCTIONAL RESPONSIBILITIES :
** Manage and the day-to-day construction activities and progress including coordinating with project team, client and sub-contractor to ensure that the work is being done safely and correctly.
** Ensure sub-contractors execute their works accurately in accordance to the approved shop-drawings, technical submissions and checklists.
** Attend site meeting and resolve technical issue with main contractor or consultant.
** Implement works safety, environmental requirements / procedure.
** Implementation of Cost and Quality on site, and to ensure minimum wastage and re-works
** Assist in preparation of working and as-built drawings.
** Ensure procedures, standards and guidelines are followed, maintained and implement corrective / preventive actions.
** Detail of Project - From 2002 to onwards

January 2020 to till date  :
As a piping supervisor in Samsung engineering CFP Project ADNOC refinery Ruwais Abu Dhabi.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support fabrication and installation, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

December 2018 to Feb. 2019
As a piping engineer, Doosan Babcock Company, Turn Around Shutdown in Borouge Project Ruwais Abu Dhabi.

Jun 2016 to Nov. 2017 :
As a piping Supervisor, Samsung Engineering Saudi Arabia, RCTF refinery (In Plant) Aramco project Riyadh K.S.A.

August 2014 to Jun 2016 :
As a piping Supervisor, Samsung Engineering Saudi Arabia GOSP-2 / GOSP4 , Aramco project Shaybah K.S.A.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support fabrication and installation, Preparation of shutdown schedule, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

September 2012 to August 2014 :
As a piping engineer, Linde Engineering India Pvt. Ltd. (Vadodra), I.S.P.R.L.Project Padur Site Karnataka.

Job and responsibility :
Fabrication and erection of firefighting, OWS CRWS line, pipe support fabrication and installation, preparation of pre hydro punch list , hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

May 2011 to August 2012 :
As a piping engineer, Samsung engineering in DFCU & AU Project SEZ Dahej, Gujarat.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support fabrication and installation, preparation of pre hydro punch list, hydro test of line and reinstatement.


Preparation of daily progress report and submit to management.

July 2010 to May 2011  :
Piping Engineer in SGS India Pvt. Ltd. Cross-Country pipe line O.N.G.C. At Kalol CTF and Nawagam CTF, Site- Ahmadabad.

Job and responsibility :
Laying of pipe line, hydro test of line. Preparation of daily progress report and submit to management.

Oct. 2009 To January 2010 :
Piping engineer in Toyo Engineering India Ltd. Naphtha Cracker Project Shutdown and expansion in HPCL Haldia W.B.

Jan 2008 to sep 2009 :
Piping engineer in Toyo Engineering India Ltd. Naphtha cracker project IOCL Panipat Haryana.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support installation, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

Jan 2007 To Dec 2007 :
Worked with Shroff & Associates (Engrs.) Pvt. Ltd.

Jan. 2007 to May 2007 :
Worked as a Piping engineer Epoxy Plant Atul Ltd. Valsad Site Gujarat

June 2007 to Dec 2007 :
Worked as A piping Engineer their Pilot Plant in Sequents Scientific Ltd. Mangalore site Karnataka.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support installation, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

Jan. 2006To Dec. 2006  :
Worked with Dodsal Pvt. Ltd. (Mumbai), Worked as a piping Engineer their 220X2MW Nuclear Power Project RAPP Rajasthan.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support installation, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

Feb 2005 To Dec 2005  :
Worked with Satnam Engg. & Feb. Pvt. Ltd. (Delhi) Worked as A Piping engineer their Fiber Plant (RIL Project Hazira Surat Gujarat).

Jan 2003To Jan 2005  :
Worked with Onshore Construction Com. Pvt. Ltd Mumbai.

July 2004 to Jan. 2005  : Worked as Piping engineer their MEG Plant
India Glycol Ltd. Kashipur Uttranchal.

Oct. 2003 to June 2004  : Worked as a Piping engineer their Fatty Alcohol
Plant VVF ltd. MIDC Taloja Mumbai.

Jan. 2003 to Sep. 20003  : Worked as a Piping engineer their Catalyst Plant
Johnson Matthy Ltd. MIDC Taloja Mumbai.

Job and responsibility :
Fabrication and erection of process and utility piping, pipe support installation, preparation of pre hydro punch list, hydro test of line and reinstatement. Preparation of daily progress report and submit to management.

Oct. 2001To Dec 2002  : Worked with Nine-X Auto Pvt. Ltd. Noida
Maintenance Engr. In Automobile Workshop.

PERSONAL DETAILS:
Fathers Name  : Late Ashraf Ali
Date of birth  : 15/02/1974
Qualification  : Diploma in Mechanical Engineering from  Technical Board Lucknow in 2001

DATE:
PLACE:

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.