Welcome Guest

Site / Construction >> QA QC Engineer / Executive / Manager 
MEP Manager Resume Sample, Experience : 13 years

Sponsored Links:
    

Biodata

Name of the Candidate:Md.Muniruzzaman
Name of the Post Applied:MEP Manager
Job related skills / software:Plumbing System, Fire Fighting System, HVAC System, Preparation of QA/QC procedures and test plans
Category:Site / Construction
Sub Category:QA QC Engineer / Executive / Manager
Years of Experience:13 years
State:Bihar
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:monir.zaman839 AT gmail.com
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

MD.Muniruzzaman
E-Mail  :- monir.zaman839 AT gmail.com

Career Objective  :
Intend to build a career with leading corporate of hi-tech environment with comment & dedicated people, with will help me to explore myself fully and realize my true potential. Willing to work as key in challenging and creative environment. Result oriented professional mechanical engineer seeking growth in area of Plumbing, Fire Fighting and Heat Ventilation and Air Conditioning.

Education Qualification  :
Bachelor of Engineering in Mechanical Engineering with 68.58% marks with 1st class in 2007. From R.P.S. Institute of Technology, Patna under Magadh University Bodh Gaya. Approved by A.I.C.T.E. New Delhi.

Experience Profile  :
I have Total Experience of 13 Years. 8 Years+ in India and 5 Years+ in Saudi.

Present Experince  :
Company  : Potential Project Managers PVT.LTD. Working on behalf of M/s. GMR Airport Developers Limited
Position  : Assistant Manager MEP.
Duration  : 19th Nov.2018 to 13th Jun.2020
Project  : 1) Revamp of Delhi Duty Free Services Stores at IGI Airport, New Delhi. Delhi Duty Free project involves renovation of their existing stores at Arrivals, Departures in running airport at Terminal - 3 of IGI Airport, New Delhi

2) Cafeteria Up gradation at New Udaan Bhawan Opp, Terminal -3.
3) DDFS Warehouse at Indira Gandhi International Airport, New Delhi

Project Owner  : GMR Group.
Duties & Responsibilities  :-
** Track & Updated- Master Project Plan
** Review &Comment for Changes, if any –on the daily work schedule for the vendors.
** Track , Prepare ,Updated &Reports- Daily & Weekly Progress .Over See regular inspection of works for supervision & Quality Control per specs
** Check for compliance of site work per permit & Scheduler
** Vendor follow up on deliveries for equipment and material
** Coordinate with Vendor for equipment receipt, unloading at site.
** Check & Clear all Delivery Chillan’s.
** Visual inspection for material delivery per BOQ /Agreed Specs.
** Check &Provide clearances for equipment receipt at site towards installation.
** Initiate, chair weekly site mitting for coordination between various vendors and stake –holder.
** Issues agendas & Minutes of meting
** Review & Certification of Payments per PO terms
** Review Inspect & Certify final measurement sheet for vendor final bill.
** Prepare & Generate –Project Closure Reports.

Gulf Experince  :
Company  : Nabil A. Abue Nhaya & Partner Co.
Position  : Sr.MEP Engineer (Plumbing, Fire Fighting &HVAC System)
Duration  : 17th January 2015 to 5th March 2018
Project title  : Yanbu South Terminal, Rehabilitation of Onshore & Offshore Facility.
Project Owner  : Saudi Aramco.

Duties & Responsibilities  :-
** Conduct & Initiate inspection as per approval design drawing (IFC).ITP & QCP procedure.
** Receiving inspection of material and equipment deliveries, if complies from approved quality Control procedure, inspection test plan and project specifications.
** Read and familiarized with the approved quality control procedures and inspection test plan.
** Any deviation from drawing, plan and standard coordinate to sub- contractor to raised technical queries for clarification and approval.
** Inspect work and review checklist as per RFI submitted by contractor.
** Ensure that all work is inspected as per the requirements of approved quality and inspection test plan.
** Witness, verity and conduct inspection with Contractor, Vender & Client at Manufacturers plant following ITP during stage of material delivery, assembly & testing of AHU/ACCU units & prepare necessary punch –list to be completed prior to site delivery.
** Conduct internal inspection with subcontractor engineer prior to scheduling.
** Prepare daily inspection schedules as per submitted RFI.
** Conduct daily site inspection and prepare daily inspection reports.
** Conduct lighting testing of Installed duct as per approved procedure.
** Study of piping layout of Fire- Fighting System.
** Study of piping layout of plumbing System.
** Witness and verification as per design requirement of Mechanical Testing such as hydro, pneumatic and vacuum testing of pipes, T.A.B, functional testing of equipment conduct by vendor.
** Responsible for assuring and controlling the work quality as per the approval specification and drawing.
** Responsible for the overall quality control of all the contractor activities at site.
** Responsible for liaising, coordinating, advice and instructing the Managerial staff and all matters relative to Quality Control at site.
** Prepare detailed record and reports for all INSPECTION (S) conducted at the SITE, and maintain the QUALITY CONTROL documentation.
** Responsible for assuring and controlling the quality as per the Specification and drawing.
** Assure all technical documents relative to site quality control are current status.
** Prepare detailed record and reports at all inspections conducted at the site and maintain the quality control documentation.
** Establish and conduct regular quality control meeting with the subcontractor correlate, prepare and issue the weekly field inspection.
** Day to Day planning and co-ordinate of QA/QC activities.
** Preparation of QA/QC procedures and test plans.
** Material inspection
** Site inspection and respective documentation and control
** Test package identification, review and verification.

Company  : Nabil A. Abue Nhaya & Partner Co.
Position  : MEP Engineer (Plumbing, Fire Fighting, HVAC)
Duration  : From 12th Sep 2013 to 16th January 2015
Project type  : Water Closets Restoration /Renovation of Toilets & Utilities Phase -2
Project Owner  : King Fahd University of Petroleum and Mineral (KFUPM).

Duties & Responsibilities  :-
** Preparation of B.O.Q , MOM (Minutes of Meetings)
** Get approval HVAC shop drawing, MEP Coordination drawings, work method statement and project specification from Clint.
** Ensure the HVAC Ducts, Fittings, accessories are available and approved by inspection department period of inspection.
** Ensure sufficient hand tools, power tools ladder scaffolding are available for inspection.
** Coordinate with other discipline and ensure site clearance is available to start the HVAC , Fire Fighting And Plumbing work Activates
** Arrange the sufficient manpower such as Supervisor, Forman, Duct fitter, pipe fitter, Plumber etc and ensure that all of them attended safety orientation.
** Provide approved HVAC shop drawing, MEP and Fire Fighting Co-ordination drawing to site supervisor or Foreman and inform them to shift the requires all approved material from warehouse to site and arrange required material to avoid progress delay.
** Closely monitor site activities to ensure quality of work is incompliance with approved shop drawing specification and get daily progress report from site supervisor or foreman and update to Project Manager.
** Preparing the relevant document to conduct inspection for completed inspection activities and raise RFI to QC Inspector. (To ensure that any activity offered for inspection has an attached of IFC drawing, ITP (Inspection &Test Plane).
** Preparing the relevant documents to conduct testing inspection such as Duct lighting resting for duct and Hydro test for above and underground child water piping, plumbing piping system
** Active involvement in weekly meeting with project management &QC Manager to resolve the site related issues.
** Assist the Commissioning team on testing, adjusting and Balancing.
** Assist the commissioning team of Chiller Plant, CHW Pumps, CNDW Pumps, Fire sprinkler system, fire hydrant system, fire pumps, Cooling Tower, AHU, FCU, etc
** Checking of Bills raised by various contractors/agencies.
** Inspection of all RA bill of vendor as per terms of payment in work order
** Coordination with bill processing team and Accounts
** Planning, execution, monitoring of project within cost, time and quality standards.
** Responsible for checking the drawing given by project executor at site & the execution of work as per the drawing.
** Supervise all these  :- All plumbing internal & external Drainage, Seaware, water supply pipe line, CPVC, PPR, C.


I. hanging & Down take pipe line HDPE/WC pipe line,. Fire sprinkler system, fire hydrant system fire pump room installation testing & commissioning.
** Worked on Studying Plumbing Drawings.
** Implementing the drawings as per company standards.
** Co-coordinating with architects, consultants, contractors, sub-contractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances.
** Coordinating with Clients & other counterparts like Civil, Electrical and Interiors etc.
** Execute the installation of plumbing services .Familiar with Potable Water Supply, hot water systems, Water Heaters, Pumps and all kind of materials.

Experience At India  :
Company  : VIJAY SABRE SAFETY PVT LTD
Position  : Project Engineer (MEP)
Duration  : 12th Sep.2011 to 1st Sep 2013
Project title  : Power Plant, Delhi Metro, Malls.
Project Owner  : M/S Bajaj Energy Pvt Ltd ; Larsen & Tourbo Ltd; M/S Haldiram Snacks Pvt Ltd.

Duties & Responsibilities  :-
** Installation of Fire System according to NFPA-10, NFPA -13.NFPA-15, NFPA-20.
** Installation of Fire detection and suppuration system
** Installation of Fire Hydrant System and Automatic Sprinkler System to provide protection from Fire.
** Installation of Clean Gas flooding fire suppuration system.
** Installation of Carbon dioxide (CO2) based internal gas suppuration system.
** Installation of Potable fire aid fire extinguisher like CO2, ABC, DCP.
** Installation of Dry Chemical Powder (DCP) System in storage area.
** Installations of Medium Velocity Water spray System (MVW) And High velocity water spray system (HVW) and Foam System.
** Installation of Fire pump, Booster pump Jockey pump.
** Installation of Air Condition System. (Critical Room such as Station control room, Ticket office, UPS &Battery Telecom &Signaling equipment room.
** Installation of Ventilation System ( Various areas in station such as Pump room, Auxiliary substation ,Electrical switch room, Clean Gas Cylinder room .
** Monitoring daily site activities pertaining to HVAC ducting layout, Installation of chilled water AHU & FCU.Direct Expansion split type Air Handling units & Fan Coil units.
** Installation of Duct and Insulation.
** Installation of Plumbing system,(Domestic water, West water, Rain water etc )
** Checking Installation as per the approval drawing.
** After Installation Testing, Commissioning to Plumbing & fire Fighting System Plumbing System.
** Clear punch list given by operation and Maintenance department.
** Check plans, drawings and quantities for accuracy of calculations.
** Ensure that all materials used and work performed is in accordance with the specifications.
** Oversee the selection and requisition of materials.
** Manage, monitor and interpret the contract design documents supplied by the client or architect
** Maintain regular communication and attend meetings with clients and their representatives to inform them of progress on the project.
** Communicate with any consultants, subcontractors, supervisors, planners and others involved in the project
** Promote and maintain health and safety, including site inspections to ensure safety rules.
** Prepare reports as required
** Resolve any unexpected technical difficulties and other problems.

Company  : Larsen & Toubro Ltd (E & C Division)
Position  : Project Engineer (MEP).
Duration  : 28th March 2009 to 31st Jan 2011
Project title  : 238.8 MW Captive Power Plant for IOCL Naphtha Cracker Project.
Project Owner  : IOCL Panipath (Haryana).
Company  : KAYPEE MECHANICAL INDIAN PVT.LTD
Position  : Project Engineer (PIPING)
Duration  : 6th Aug 2007to 20th March 2009
Project title  : Jamnagar Export Refinery Project.
Project Owner  : Reliance Petroleum limited (Gujarat).

Duties & Responsibilities  :-
** Installation of Fire System according to NFPA-10, NFPA-11, NFPA -13.NFPA-14, NFPA-15, NFPA 16, NFPA-20.
** Study of piping layout of Fire- Fighting System.
** Installation of Fire detection and suppuration system
** Installation of Medium Velocity Water sprays System (MVW) And High velocity water spray system (HVW) to provide protection of Fire.
** Installation of Stand Pipe Hose System.
** Installation of main hydrant pipe, External ring, Wet risers, Main header for sprinkler and branch pipe of sprinkler Fittings of sprinkler.
** Installation of Foam System in oil tank
** Installation of Clean Gas flooding fire suppuration system.
** Installation of Carbon dioxide (CO2) based internal gas suppuration system.
** Installation of Potable fire aid fire extinguisher like CO2, ABC, DCP.
** Installation of Dry Chemical Powder (DCP) System in storage area.
** Installations Installation of Drainage System.
** Installation of Row water and Sweat water system.
** Installation, Testing and Commissioning of all plumbing external & internal Drainage, Sewer, Water supply pipe line, CPVC PPR, C.I Hanging & down take pipe line DHPE/CW Pipe line.
** Execute the installation of plumbing services .Familiar with potable water supply, hot and cold water.
** Act as the main technical adviser on a construction site for subcontractors, craftspeople and operatives
** Check plans, drawings and quantities for accuracy of calculations
** Ensure that all materials used and work performed are in accordance with the specifications
** Over see the selection and requisition of materials
** Manage, monitor and interpret the contract design documents supplied by the client.
** Liaise with any consultants, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project
** Liaise with the local authority (where appropriate to the project) to ensure compliance with local construction regulations and by-laws
** Communicate with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress
** Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
** Plan the work and efficiently organize the plant and site facilities in order to meet agreed deadlines.
** Oversee quality control and health and safety matters on site.
** prepare reports as required.
** Resolve any unexpected technical difficulties and other problems that may arise.
** Knowledge of drawing in accordance with schedule.
** Marks construction drawings for site changes.
** Checking Installation of ducting, piping & Equipment as per the approval drawing.
** Checking the installation of insulation & cladding.
** Clear punch list given by QA/QC department.
** Witnessing Pre- Commissioning &Start up testing & balancing of the HVAC Equipment.
** Prepares detailed list and schedule of drawing.
** Check the drawing for correction at site and communication to planning for corrections.
** Gate the drawings approved from the consultant /Clint.
** Manage subcontractor relationships during pre - constructions.
** Manage and handle inspector relationships throughout all construction period.

Computor Skills  :
** Proficient with Internet Application
** MS Office (Excel ,Word ,Power Point)
** Operating System  :Windows XP/7/8

Strengths  :
** Effective Communication
** Team Motivational Skills
** Good Analytical and Decision making Ability
** Hard Working

Personal Information  :
Date of Birth  : 1st March, 1980
Father’s Name  : Mohd .Sharfuzzaman
Marital Status  : Married
Nationality : Indian
Language Known : Hindi, English, Urdu
Village : Chucknooruddin

Declaration:
I hereby declare that all the above information given is true, completed and correct to best of my knowledge and believe.

Date:
Place:

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.