Profile :
A strong team player with excellent interpersonal skills, Able to work independently with proactive attitude, Committed and adaptable, A quick learner, Able to communicate/Coordinate with international customers as well as strong analytical and problem solving skills, Good communication skills both verbal and written.
Experience :- 9 Yrs
Period Company Designation/Role
Jul 2007-Till Date Dubai Electricity And Water Authority
Dubai Senior power station operator
(Control room Engineer)
Oct2002-Jul 2007 TCP Ltd, Power division (1*63.5MW)
Gummidipoondi, Chennai Engineer (Operation & Maintenance)
Educational Qualifications :
M.B.A. in Power Management, Pursing
University 0f Petroleum & Energy studies
B.S. in Engineering Technology, 8.1(CGPA) With FIRSTCLASS
Birla institute of tech & Science, India
Post Diploma in Thermal Power Plant Engineering 80% With DISTINCTION
National Power Training Institute-Neyveli, India
Diploma in Mechanical Engineering, 85% with HONOURS
Elumalai Polytechnic-Vilupuram, India
Diploma in industrial safety Engineering. 64% with FIRSTCLASS
Annamalai University, India.
COMPUTER SKILLS :
AUTOCAD 2002, Microsoft Excel, Word, Power Point
Special Skills :
** Commissioning of SIEMENS V94.3A WET COMPRESSION SYSTEM
** Combined Cycle (GT :3 X 250 MW, ST: 2 X150 MW) and Desalination Plant (1 X 5 each with capacity of 13.33MIGD,MSF desalination plant) Operation & Maintenance of Thermal Power Station (63.75 MW), and high voltage system up to 230 KV.
** Excellent in Technical Services for continual improvement of Plant Operation / Process.
** Startup and Shutdown procedure s of the units.
Strong communication skills, good budget and annual operational planning skills (Identify, Plan & Implement cost saving activities)
Professional Qualifications
Dubai Electricity and Water Authority, Dubai
Power plant consists of total installed capacity of 8000 MW including ongoing projects. I am responsible for the Plant of 1050 MW
Gas turbine : 3 x 250 MW SIEMENS V94.3A with TELEPERM XP control System..
Steam Turbine : 2 x 150 MW SIEMENS (BPST)
Desalination Plant : 1 x 5 MSF Desal. Plant by FISIA ITALY, each with 13.33 MIGD capacity.
Boiler : 1 x 3 HRSG (75 bar, 530 c , 483 TPH )
: 1 x 2 Auxilary Boiler ( 19 Bar, 250 c, 363 TPH )
Designation : control room engineer
Period : July 2007–Till date
Reporting to Manager (Operation)
** Responsible for startup and shutdown of Gas Turbines, Steam Turbines and Desalination plant. Co-ordinating with Load Dispatch centre (LDC), starting and shutdown of the units accordingly.
** Operation of water treatment plant, Emergency DG, Natural gas Pressure Reducing station, Sea water Pump House, Chlorination Plant, Blending Plant and Sub Station Equipments.
** Monitoring the efficiency and performance of the plant.
Preparation of Plant status. Loss of generation & Unusual occurrence (outage) reports.
** Training the newly joined operators. Prepare the training programs and reports.
** Responsible for Isolation (Lockout/Tagout) of High Voltage (132 KV) and preparation of Permit to Work through MAXIMO.
** Responsible for preparing monthly and annual reports
** Good working knowledge of TELEPERM-XP, DCS control systems with Unit startup and shutdown procedures, monitoring parameters, testing, isolation and de-isolation procedures and safety work permit systems.
Tamilnadu Chemical Products Ltd, Gummidipoondi, Chennai
Which is a 63.75 MW Pulverized Coal based Thermal Power Plant.
Steam Turbine : 1 x 63.75 MW by FRANCO TOSI
Boiler : 1 x ( 275TPH 95 Bar 550 C ) by CE Boiler
Designation : Engineer (Operation & Maintenance)
Period : Oct 2002 to Jul 2007
Reporting to Works/Manager
** Responsible for the Operation of Boiler, Turbine and Generator and Accessories like Water treatment plant,Fuel handling plant(Coal & Oil), Ash handling Plant and 110 KV Switchyard.
** Responsible for startup&shutdown of units. Co-ordinating in testing and recommissioning the plant equipments while the units under shutdown for annual and capital overhauling, Follow up with maintenance department for making the availability of standby equipments.
** Monitoring the efficiency and performance of the equipment. Co-coordinating with load dispatch center (LDC). Estimation of unit generation cost and heat rate of the turbine cycle
Thermal Training Details :
Post Diploma in Thermal Power Plant Engineering AT National Power Training Institute (NPTI), Southern Region, Neyveli, Tamilnadu. ( Under Ministryof Power, Govt. of India)
This 52 weeks training included
** Scheme Tracing
** On-Job Training on O&M programs at Thermal Station-II of the Neyveli Lignite Corporation Ltd., NLC ( A Lignite fired 7X210MW plant having both 230KV and 400KV Switchyards)
** Two weeks intensive training on a 210MW fossil fired Power Plant real time simulator at NPTI (WR), Nagpur
** Two Weeks Training on DCS Operation of Thermal Power Plant.
** Two Weeks Training on 440KV Switch Yard (outdoor).
** Authorized Diploma holder to operate or undertake maintenance of any part or whole of a Generating Station of capacity of 100MW & above together with the associated sub-station under IER rule3 (2-A), 1956 amended in 1981.
Declaration :
I hereby declare that the information furnished above is true, correct and complete to the best of my knowledge.
SAKTHIVEL.K