Job related skills / software:Managing project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
Category:Site / Construction
Sub Category:Project Engineer / Manager
Years of Experience:>20 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:Diploma
Major / Specialization:Civil
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Resume  :
Santaji S Ghorpade
E-Mail  : santoshgh_77 AT yahoo.co.in , viruindra07 AT gmail.com

To build career with a professionally managed organization and to reflect high standards of performance in any given assignments, thereby ensuring organizational and personal growth

Profile Snapshot  :
** Over 23 years of experience in Construction Industry -fields like Road structures, OIL n GAS, Industrial buildings, power plant and Water Supply- sewerage
** Presently working as Sr. Superintendent in GALFAR ENGINEERING & CONTRACTING CO SAOG at Muscat , Sultanat of Oman for Road & Bridge project of Transport & Communication Ministry
** Expertise in swiftly ramping up projects with competent cross-functional skills and on time execution
** Experience in executing construction projects with a flair for adopting modern construction methodologies in compliance with quality management system and contractual requirements
** Distinction of managing a Industrial project for Shapoorji Pallonji & Co Ltd at Ranjangaon Pune and 1100mw ccpp at Surat
** An effective communicator with strong analytical, problem solving & organizational abilities.

Areas of Expertise  :
Project Planning & Control  :
** Preparing schedules for all given sites including resource schedules, execution methodologies, milestones and budgets
** Managing project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.

Construction Management  :
** Supervising all construction activities include providing technical inputs for methodologies of construction & coordinating with Site Management; working in execution, maintaining records and making of contractors bills
** Preparing and reviewing Method Statements, Work Specific Quality Control Plans as per specifications of contract document; resolving teething problems in site execution such as material supply, drawing queries(working drawings), payments and extra items etc.

Work Experience  :
** June 2021 to Till Site Incharge ( Cold storage and Constructio for agree farmhouse) Gayatri Constructions , Sangola solapur
** May’ 2015 to March 2021 Galfar Engineering & Contracting co. SAOG, Sultanat Of Oman.

Accomplishments  :
** Road n Bridges- Resource planning and execution for structures like Minor Bridges, Over bridges, CD works – Box Culverts, Animal Crossings, Underpass, Retaining wall and protection/relocation of underground utilities. Rehabilitation, finishing painting of bridge, waterproofing deck by “Pitchmastic UK”. Road side and median Guard railing work, Interlocks in roundabout and footpaths. Curbstones in roundabouts.
** Studying, preparing working drawings, BBS, quality controlling, execution as per specification and contractor billing for project
** “Dualization of Taqah- Mirbat Road in Salalah, Sultanat of Oman ( may 2015 to July 2017), Consultant AL Manrah LLc
** Al Batinah Expressway (BEW 3) , Khaburah , Sultaunate of Oman , Consultanat PARSONS international & Company LLC ( Since July 2017 to Oct 2018)
** Additional Third and Fourth Lanes in the existing RUSAYEL-NIZWA dual road( From Muscat Expressway Interchange to AlSharkiya Expressway Interchange-part1 ) From Sta 8+325 to 35+500 (Since June 2020 to March 2021)
** Oil and Gas Project- Total resource planning and execution for construction of civil works of
** DUQM Refinary , substation building works under “Petrofac- Samsung JV”( August 2019 June2020)- All Construction RCC substation buildings till seller slab and Control buildings start from excavation to handing over other dept.

RCC buildings- 7 Nos  :
** Construction Precast buildings includes column, wall panels, Beams (Transverse and parapet) and hollow core slabs.
** Supervising all activities involved in execution like erection of elements, alignment , Grouting elements, Welding joints and finishing.

No of Buildings – 12  :
** Equipments used are Cranes of 100 to 200 T capacity and Man lifts
** Manpower used – Erectors, Riggers, Mason, Welders and Flagman’s /helpers

SALALAH LPG project of OGC under PETORFAC( Oct2018 to August 2019)  :
** Execution civil work involved in CMIE . Following work supervised and monitored starts from excavation to finishing for CMIE
** Excavation, Bedding , prepadding, post padding and backfilling GRE pipe line around 3.5 km . Also Closed drain lines, open drain lines(GRE)
** Construction of RCC drain . Sanitary lines and its Manholes. AOC Manholes. Storm water pipeline with its Manholes. Conducting Leak Test for Manholes.
** Construction Electrical Telecom and Instrumentation trenches include excavation, prepadding, post padding and backfilling with selected materials.
** Precasting of Manholes, Light pole foundations, pipe supports , Fencing pole foundations and miscellaneous EIT foundations.

Jan’2011 to May 2015 WIND WORLD ( INDIA) LTD, Formerly ENERCON Gmbh  :
Accomplishments  :
** Pivotal in managing 2 teams including 6-7 people each
** Scheduling the day to day progress of the project and monitoring.
** Surveying as per micrositting drawings on field, demarcation of location points, and preparation of Lsections / cross-sections of road with quantity calculations.
** Estimation of building work as per Architectural drawings with market rates
** Collecting quotations, rate analysis and finalization of vendors for road and building works.


Making Pos in SAP.
** Executed Office Buildings(500sqft to 2000sqft) for operation team and customer, Hilly roads (Survey as per MSD and Road work in cutting /filling with min gradient 1  :18)
** WBM roads Procuring, spreading, watering and compacting 40-60 mm metals with murum as blindage material in two layers for smooth motorability on hilly terrains
** Preparation of weekly / monthly reports in required formats, Vendor billing and coordination with corporate team.
** Carrying quality control tests for earthwork, foundation and concrete work
** Lisioning with Land team and PRI team
** Developments of yards /lands( Identify right locations nearby or convenient to ridge for material storage of installation team and develop the same yards with respect to technicality )
** CD works(Identifying the points for cross drains and laying HPC of required sizes). Drawing/design estimation of all types of cross drainage and execution
** Excavation/pcc/RCC foundations for wind turbine..(concrete qty-197cum per foundation).
** Resource planning according to work , Reconciliation of materials, Handing over documents to Operation and mentainance team.(HOTO)

The Projects Handled  :
** Andra Lake Windfarm project of 110MW, Pune
** KDK2 Windfarm project of 55MW, Ahmednagar
** Oct’08 to Dec’10 Indu Projects Ltd, Hyderabad

Accomplishments  :
** Pivotal in Execution-M S Pipeline of 1800mm dia 10mm thick twin line
** Survey, excavation, pipe laying, gunniting , inlining and hydrotesting
** Successfully managed the U.T. testing and Hydro testing activities of laid pipeline

The Project Handled  :
Direct pipeline from Pawana dam to sector 23 , nigdi, for PCMC, Consultant-Unity Consultants Pvt Ltd

Feb’06 to Sept’08 Shapoorji Pallonji & Co. Ltd. Mumbai  :
Accomplishments  :
** Execution of RCC structures in ‘ Engine Shop ,Technical Gallery’and paint shop buildings
** In Technical Gallery activities were Raft (700thk) , Wall ( 500- 1200thk and done with special truss support shuttering) and slab (550thk) . The size was 216m in length , 6.0m in depth and 12.50 in width, total concrete qty is AT 7000m3
** In paint shop building, I have delivered my best to complete total booth trenches ( 200 rmt, 3.0m-1.5m wide and 6.0m in depth), VD floor and Chimney foundation (of size 10.2x10.2x1.0 bottom raft, 4.0 nos column of 1x1and intermediate diaphragm wall of 300thk) in M30 grade concrete. Total depth of Chimney foundation is 8.5m from GL
** In Combined Cycle Power Plant at Surat I was responsible for execution of foundations for Switch Yards 400Kva and 220Kva. Turbine / Boiler foundations, condensate pit, Boiler Drain pit foundation and full RCC encasing for pipeline of 1800mm dia twin line to Cooling Towers

The Projects Handled
** Fiat Automobiles India Pvt Ltd, Consultant-Tata Consulting Engineering (May’07 to Sept’08)
** Construction of Power Generation Plant for TORRENT at Surat in Gujarat state. (SUGEN 1100MW), Client –SIEMENS (Feb’06 to April’07)

June’1998 to Feb’06 Ivrcl Infrastructures & projects Ltd.  :
Accomplishments
** Preparing monthly Reports, RA Bills, WIP, Reconciliation of materials, preparing Daily progress Reports, coordination with clients & dept personals for GWSSB. Execution / monitoring all types pipelines, WTP , UG Sumps and ESR of capacity 6.0lac to 10.0lac.
** Responsible for construction of Bridges, CD works & Retaining wall. Studying, preparing working drawings, BBS, layout markings, quality controlling, execution as per specification, billing client & contractor for NH5 , AP2 project.
** Execution of pipe line work of 20km. Activities included like excavation, laying, jointing & Hydrotestig and execution of RCC Thrust Blocks/ Anchor blocks/Delivery chamber. Preparation of work schedule as per tasks. Billing of subcontractors. Co ordination with client regarding work & RA bills for MKVDC Lift irrigation project

The Project Handled  :
** Design Build & Operate contract for Distribution network for Ahemadabad dist.
** Package SSW A1, Consultant- CEIL (Aug’04 to Feb’06)
** Widening of Existing 2 lines to 4/6 lines from ch. 97 to 171 , Srikakulam to Palasa for NH5 in the state of AP , Consultant-CES-RITES-BECA(JV) (July’01 to July’04)
** Construction of Rising Main of MS 2.5m OD –4 line & 2.20 OD -2 line for T.L.I.P under MKVDC at Mahuli (Vita-Sangli dist,Maharashtra) including 2nos Delivery chambers , RCC Thrust Blocks/ Anchor Blocks. (June’98 to June’01)

Jun’97 to May’98  : Commenced career with Kulkarni Engineers & Contractors, Vita(Sangli) as Site Engineer- Residential and Commercial Buildings

Education  :
1994-1997 Diploma in CIVIL Engineering , Walchand College Of Engineering , Sangli. Maharashtra

Computer Skills  :
MS Office , AutoCAD

Trainings Attended  :
Work shop on Quality of Concrete and Design parameters at Goa Engineering College

Personal Details  :
Date of Birth  : 24-06-1977
Marital Status  : Married
Languages Known  : English , Hindi , Marathi ,Telugu , Gujarati and Arabic
Present CTC  : Rs. 16.30 Lac pa (in Oman)
Notice Period  : Immediate Available

Declaration  :
I the undersigned declare that, the details given above are absolutely true.

Date  :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.