CAREEER OBJECTIVE :
I am a Diploma holder in Electrical Engineering with 10 years of experience in related area. I use my dedication and talent to achieve the professionalism, which serves as an advantage to the organization I work, and to fulfill my career goals.
PROFESSIONAL EXPERIENCE :
1.Company : Cyber Micro solution Technologies. Qatar {SASCO Group}
Designation :Project Co-ordinator Electrical & Telecommunication
Duration :1st February2009 to till Date
Product :project: Electrical &IT Infrastructure Development Company.
Responsibilities :
** Now Handling NDIA CP-51Passenger Terminal project under SIXCO MIDMAC (New Doha InternationalAirport)
** HandledNDIA CP-11Cargo terminal under Lodige systeminternational(New Doha International Airport)
** Design, Detailed Engineering, Installation and Supervision of Structured cabling/ fiber optic cabling, UTP cabling.
** Installation of acces points, installation of CCTVcabling,
** Structured cabling systeminsupreme educationalcouncil Schools in Doha
** Handled QATALUM Project. (QATAR ALUMINIUM LIMITED)Under SNC Lavalin International
** Design, Detailed Engineering, Installation and Supervision of Structured cabling/ fiber optic cabling, UTP cabling.
** Splicing and OTDR Testing
** Power meter testing with fluke meter
** Design, Detailed Engineering, Installation and Supervision ofElectrical Distribution system. High voltage and low voltage system.
** Controllingof works according to the specification of contract
** Progress monitoring in line with agreedtime scheduling
** Measurement sheet preparationas per the progress of work for invoicing
** Lighting Protection and Earthing system
** LT and HT cablelayingplanning and scheduling , monitoring
** Cable termination
** Responsible forsite safety
** QA/ QCmonitoringfor site work
** Co-ordination with consultant,EPC contractor, client
** Preparation of estimate
** Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
** Testing and commissioning of the above Installations.
2.Company : Ashapura Mine chem Limited.
{Ashapura Group of Industries}
Designation : Engineer -Electrical.
Duration :28th April 2008 3rd January 2009
Product : Kaolin. (same as cement industry)
Responsibilities :
** Design , Detailed Engineering, Installation and Supervision of2 Nos1600 KVATransformer and its interlocking system.
** Design , Detailed Engineering, Installation and Supervision of2 Nos600 KVADG Set and its interlocking system.
** Lighting & Power distribution system
** Lighting Protection and Earthing system
** HT & LT cable laying
** Erection of Transformer,VCB panel PCC and MCC’s
** Cable termination
** Preparation of estimate
** Panel board erection andIndustrial wiring
** Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
** Testing and commissioning of the above Installations.
** Operation and maintenance of the Electrical Installation and related man power requirements in the Factory works related with Machine erection.
** Operation and maintenance of compressor.
3.Company : Rubek Balloons Pvt Ltd [Ajoint venture of Kerala State Co- Operative Rubber Marketing Federation Ltd. and Strategic Products SDN.BHD. Malaysia.] Irapuram, Rubber Park, Perumbavoor.
Designation : In Charge -Electrical.
Duration :16thMarch 200522ndApril 2008
Product : Premium Quality Balloons.
Responsibilities :
Design , Detailed Engineering, Installation and Supervision of315 KVA Dry type Unitized Sub