Welcome Guest

Piping / PDS / PDMS >> PDMS Design Engineer / PDMS Designer / Modeller 
PDMS Piping Engineer Resume Sample, Experience : >20 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:PDMS Piping Engineer
Job related skills / software:Piping Skid & Packages Structure. Pipeline Vessels Hydro testing. Storage tanks Well pad construction Material inspection. Internal fixing Precomissoning Final handover
Category:Piping / PDS / PDMS
Sub Category:PDMS Design Engineer / PDMS Designer / Modeller
Years of Experience:>20 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

K.Gandhi
Current Location/Address. City or Town : Gujarat
Country  :India
Permanent Location/Address. City or Town  :Thiruvallur
Languages : English, Tamil, Hindi Read, write and speak
Nationality  : Indian

Highest Qualifications :
** Bachelor degree in Mechanical Engineering Madras 1993
** M/Degree Master of Business Administration Chennai 2007

Other Qualifications :
Memberships, Certifications. ASNT level II

Computer Skills and Software Used :
** AutoCAD
** PDMS (for model review)
** Windows Microsoft Office

Area of Expertise :
Piping Skid & Packages Structure. Pipeline Vessels Hydro testing. Storage tanks Well pad construction Material inspection. Internal fixing Precomissoning Final handover

Additional Information  :
Father name  : P. Kanniyappan Marital status : Married
Date of Birth  : 02/08/1969 Passport Detail : J6631031
Permanent address  : New no 43/176 3rd street Valid up to : 05/07/2021
Devi meenashi nagar Total experience.  : 20 Years
Thiruvallur Mob  :+91 9965586111
Tamilnadu – India. +91 7043347957
Pin 602 001

Professional Experience  :
** Reliance industries ltd. (Refinery oil and Gas) J3 project C2 complex
** General Manager-lead construction December 2014 to till date
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting weekly progress review
** Entire piping works scope 120000 IM for UG and 450000 IM for AG .Maximum pipe size 96 inch for cooling water line

Leighton India ltd. (EPC oil and Gas) :
Manager-piping September 2013 to November 2014.

Project  :
Power distribution for expansion project. Cairn India ltd-Rajasthan

Responsibilities
** Looking after site contractor fabrication, construction, and hookup work activities.
** Provide the interface between the Project and operation team
** Ensuring good communications and relations with the sub- contractors
** Arranging on-site safety awareness, safety performance with contractor and Project Team.
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting with client for weekly progress review
** Entire piping works scope 65000 inch dia with 424 test loops. Maximum pipe size 24 inch dia for steam line
** Codes& Standards followed  : ASME/AWS/API

Ramsis Engineering WLL Co., Kingdom of Bahrain.(EPC oil and Gas Company) :
Construction Superintendent February 2012 to May 2013

Project  :Tatweer Petroleum & EWA Ministry Water storage tanks

Responsibilities  :
** Looking after site contractor fabrication, construction, and hookup work activities during Execution Phase
** Provide the interface between the work face and the Construction Site Manager or Construction Site Lead
** Ensuring good communications and relations with the contractors
** Arranging Champion on-site safety awareness and safety performance with contractor and among Project Team members
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** To Serve as day-to-day interface with contractor and craft labour during the Construction Phase, providing a focus on safety, quality, cost, and schedule
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting with client for weekly progress review
** Entire pipeline from Well manifold to BAPCO refinery
** Providing on-site support to the Construction Site Manager as required
** Codes& Standards followed  : ASME/AWS/API 5L

Cairn Energy India Ltd, Rajasthan.(Onshore oil and Gas Company) :
Consultant-Sr Construction Engineer July2010 to January2012
Project  : Rajasthan Northern Area Development Project
Mangala Processing Terminal for Oil
Raageshwari Gas Terminal for Gas Phase I and II

Responsibilities :
** Co-ordination with Design and Engineering departments to resolve the site issues and technical queries.
** Coordinating with the contractors for efficient Quality, Safety and Progress of job.
** Conducting meeting like planning and progress with sub-ordinates and contractors
** Looking after Fabrication and Erection of piping, pressure vessels, tanks, site activities & supervision, inspection, quality control and Pre- commissioning.
** Static equipment erection, hook up and piping up to box up stage.
** Internal fixing for vessels to increasing production.
** Exercise control over manpower and material resources to execute jobs within schedule and budget, meeting all HSE requirements
** Professional in GA Drawings, P&ID’s and Isometrics.
** Test package preparation, punch list preparation, pressure test inspection, re-instatement, preparation of final dossier
** Co-ordination with QA/QC for clearing entire Piping system including Mechanical Clearance, Hydro testing, Box-Up and Leak Testing of Piping System.
** Entire Piping works in Mangala Process Terminal in the areas like Oil Train area, Pig launcher and Receiver area, Settling Tank area.
** 8 oil Well pads in MPT and 4 Gas well pads in RGT for Phase I and II

Codes& Standards followed  : ASME/AWS/API

Offshore Engineering Services (Deputed to Cairn Energy India Ltd) Onshore oil and Gas Company :
Sr Mechanical Engineer August 2007 to July 2010

Project  : Rajasthan Northern Area Development Project

Responsibilities  :
** Construction supervision & Monitoring
** Tank ages
** Structural’ s
** Process Piping
** Engineering packages –Static equipment
** Involving varies
** Construction meeting
** Technical review/construction review/status
** Co-ordination with QC& sub contracts
** Engg & Technical issues
** Co-ordination with NDT team & follow- up
** Reporting to construction manager

Codes& Standards followed  : ASME/AWS/API

Catskill infra-structure pvt ltd, Mumbai.


(Oil and Gas EPC Company)
:
Mechanical Engineer January 2002 to July 2007

Responsibilities  :
** Fabrication and Erection of piping, Testing, Hook up, Punch list liquidation and commissioning.
** Exercise control over manpower and material resources to execute jobs within schedule and budget, meeting all HSE requirements and co-coordinating with other departments

CR Micro touch Engineers, Ranipet (ISO9001 – implemented) :
Sr. Engineer – Inspection Nov 1998 to Dec 2001

L&R Holding SDN BHD, Malaysia :
Fabrication Engineer August 1996 to Oct1998

D.V.M. Engineering Works BHEL, Ranipet :
Engineer May 1993 to July 1996

Responsibilities :
** Plan and Execut :e routine repairs and maintenance of the machines, Minimize downtime to control spares inventory levels.
** To administer Day to day operations of the workshop including people management
** Handling plant maintenance
** New plant expansion which includes Fabrication and Erection of structure columns, bracings and trusses
** Fabrication of Ducts Columns, Handrails, Platforms, ladders.
** Fabrication & Installation of Screw Conveyors, Industrials Fans, Chutes, Ventilators.
** Maintenance & Overhauling of strapping Machines, Welding Machines, Drilling Machines, Hand Trolleys , Forklifts.
** Welding and reconditioning of Heavy duty equipment
** Supervision of fabrication & job execution at site and Material Planning.
** Preparing BOM, Cutting plan, production planning and production re
** Preparing and maintenance of WPS / PQR
** Raw material/Bought out components inspection
** Production stage wise (in process) inspection of welding
** Cleaning & Painting inspection
** Maintaining all quality and inspection documents as per QAP / ISO procedures

Date :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.