Diploma in Mechanical Engineering with 6 Year 9 Month Experience in BOILER PRESSURE PARTS AND STRUCTURE PREASSAMBLY & ERECTION, TG , BUNKER BUILDING, RACK PIPING STRUCTURE FABRICATION AND ERECTION OF POWER PLANT AND PETROCHEMICAL.
OBJECTIVE :
Looking for a challenging position in a MECHANICAL industry right from the entry level that demands technical skill and innovative development
QUALIFICATIONS PROFILE :
** Working effectively independently or as part of a team. Good team player.
** Quick learner with strong trouble shooting capability, problem solving and analytical skills.
** Strong Leadership, communication and interpersonal skills.
EDUCATIONAL QUALIFICATIONS :
** Diploma in Mechanical engineering from Govt. Polytechnic College, Takhatpur under Swami Vivekananda Technical University with 63.94% in the year 2008.
** HSC from CGBSE (C.G.) in the year 2003 by 51.3%.
** HSSC from CGBSE (C.G.) in the year 2005 by 42.4%.
WORKING EXPERIENCE :
Presently Working in RELIANCE INDUSTRIES LIMITED JAMNAGAR, GUJRAT (RIL) (J-3 project, a part of the world’s largest refinery)
1. M/s. RELIANCE INDUSTRIES LIMITEDas a MANAGER in Erection & Fabrication of structure of rack piping of Refinery From Sep. 2013 to till date.
** Maintain record of DRGS in scope, upcoming & release to contractors & also maintain the DPR, BOM.
** Make work distribution for CNC machine for cutting drilling and plate cutting for Plasma etc.
** Planning & reviewing of drawing, Co-ordination with material department to arrange the required material as per drawings,
** Co-ordination with sub-contractors, QC, QMD department & end of dispatch with co-ordination of erection engineers.
** Planning and day to day execution of structure fabrication.
** Drawing review, preparing mobilization plan and other related jobs.
** Interpretation of drawings, checking of fabricated materials, solving site related technical issues.
** Check and verify RA bills of contractors.
** Participate in audits of quality and safety and attend points/observations related to same.
** Maintain communication from all departments like DCC, P&M, QC, and Material.
2. Worked in Barh SuperThermal Power Plant (NTPC) 3X660 MW, STAGE II(Russia Make). M/s.IOT ENGINEERING PROJECT LIMITED, as a EXECUTIVE in Erection of Structure and Pressure Parts (Boiler). From Sep. 2011 to Aug 2013.
** Boiler pressure parts and structure erection as per sequence and preassembly
** Primarily responsible for Site execution and planning of boiler structure, pressure parts.
** Documentation of pressure parts erection, alignment, fit-up and other related documents.
** Ensuring to follow guide lines during welding and erection as per FQP, WPS & detailed engg.
drawings.
** Respond and close NCR and other client complaints.
** Solving technical problems of engineering, execution related works and drawing related.
** Get extra claims/extension/ concessions negotiated wherever opportunity available.
3. Worked in ELECTROSTEEL STEELS LTD SIYALJORY,BOKARO(JHARKHAND) 2x60MW(CHINA MAKE). M/s.UB ENGINEERING LTD, as an ENGINEER in pre assembly of pressure parts and erection. From Sep.2010 to Aug. 2011.
** Project Execution on day-to-day basis for activities including erection, planning, organizing, tracking and reporting of daily status of boiler structure.
** Conducting Daily, Weekly & Monthly Meeting with Contractors and concern Dept. for Site Co-ordination & Progress review.
** Organize, monitor and review the progress regularly of project against the baseline plan to ensure TOA.
** Alerting project manager and other functional heads about deviation from plan and commitment made to client and get corrective actions done.
** Material inspection and proper loading of materials imported from yard.
4. Worked in Korba Super Tharmal Power Plant(NTPC) 1X500MW,STAGEIII. M/s.SPML INFRA LIMITED as an ASSISTANT ENGINEER in TG Structure fabrication and erection.From July 2008 to Aug.2010.
** TG structure fabrication & erection.
** Execute the Project within the time.
** Planning for daily erection works.
** Fit-up reports & documents preparation.
** Meeting with staff & solving problems of site.
** Drawing records & data.
** Inspecting daily production.
** Looking after the site related activities as per proper safety norms (18001 :2007)
EXECUTION AND FIELD CONTROL :
** Interaction with Client and coordination of activities according to client requirement.
** Control and Coordination of Subcontractor and Supplier activities.
** Preparation of Erection Schemes for Equipments and Heavy Structures.
STRENGTHS :
** Willing to do hard work till the target is achieved.
PERSONAL PROFILE :
Name : LOVE KUMAR SONI
Father’s Name : SHRI MITTHU LAL SONI
Date of Birth : 03.12.1987
Sex : Male
Marital Status : Unmarried.
Languages Known : Hindi and English
Permanent / Present Address : LOVE KUMAR SONI
Villa.- Kendaikhar(NTPC plant road) P.O.-Jamnipali
Dist.-Korba , Chhattisgarh- 495450
Present Position : MANAGER
Present CTC : 6.75 lacs
DECLARATION :
I consider myself familiar with the better part of the Mechanical Industry and I am also confident of my ability to work in the team.
Date :
Place : KORBA(C.G.)
LOVE KUMAR SONI