Welcome Guest

Site / Construction >> Maintenance Engineer / Manager 
Power Plant Electrical Operation / Maintenance Manager Resume Sample, Experience : >20 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Power Plant Electrical Operation / Maintenance Manager
Job related skills / software:Preventive Maintenance / Plant Operations / Project Management
Category:Site / Construction
Sub Category:Maintenance Engineer / Manager
Years of Experience:>20 years
State:Madhya Pradesh
Gender:Male
Salary Expected per Month(Rs):80,000 to 90,000
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electrical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

MADAN LAL GUPTA
Contact : +91-9425951547 / 9754368162
E-Mail : mglgupta AT gmail.com

JOB OBJECTIVE :
Seeking senior level managerial assignments in Preventive Maintenance / Plant Operations / Project Management with an organisation of repute

PROFILE SUMMARY  :
A highly competent professional with over 28 years of experience in Shift Management, Preventive Maintenance, Plant Operations and Project Management
** Previously associated with 29.27 MW Coal Based Thermal Power Plant of M/s Nepa Ltd. (A Govt. of India Undertaking), Nepanagar (MP), Dist. Burhanpur as Senior Manager (Power House)
** Proficient in handling the detailed engineering & maintenance of machinery, implementing process enhancement and quality control techniques
** Expertise in implementing plans & annual turnaround with focus on optimum utilization of manpower and materials
** Adept in handling process improvements and quality related activities involving resource planning, in-process inspection and co-ordination with internal departments
** Gained significant exposure in effectuating preventive based maintenance schedules to increase machine uptime and equipment reliability
** An effective problem solver with excellent interpersonal skills

CORE COMPETENCIES  :
** Coordinating with all related departments for timely actions like scheduled maintenance to ensure the reliability of the equipment
** Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget
** Devising cost saving measures & modifications to achieve substantial reduction in terms of man days, production cost, raw material & energy consumption
** Monitoring implementation & documentation of quality systems ** Identifying assignable and chronic causes by the use of latest analysis techniques
** Managing the safety in the plant and minimizing accidents/ losses ** Maintaining a high level of quality & discipline amongst the workforce across the department
** Liaising with external depts., ensuring compliance to rules & regulations and obtaining clearances & approvals

ORGANISATIONAL EXPERIENCE  :
Since Nov 84 M/s Nepa Ltd. (A Govt. of India Undertaking), Nepanagar (MP), Dist. Burhanpur Growth Path Apprentice Ship
November 1984 – November 1985 Management training
February 1986 – December 1987 Shift Incharge December
1987 – February 1992 Plant superintendent
February 1992 – November 1997 Sr Plant Superintendent
December 1997 – December 2002 Deputy Manager
December 2002 - December 2006 Manager
January 2007 – January 2012 Sr Manager Since January 2012

Key Result Areas as Senior Manager (Power House) :
** Worked as overall incharge of Captive Thermal Power Plant for last more than 6 years
** Carried out the general and preventive maintenance of Transformers, Motors, Switch Gears, VFD and Cables
** Handled the works related to static excitation equipments for Generator
** Served as In-charge of Captive Thermal Power Plant (29.29 MW)
** Authorised for supply uninterrupted power & processes steam to production plants
** Accountable for handling overall administration for operation, maintenance, planning & material management

Key Result Area as Deputy Manager  :
** Single-handedly managed the complete electrical maintenance of Power Plant

Key Result Area as Plant Superintendent  :
** Involved in the maintenance of 2 X 31.5 MVA , 132 KV Substation and Power Plant Key Result Area as Shift In-charge
** Handled the operations of Thermal Power Plant in shift duty Highlights
** Successfully undertaken coal consumption saving initiative by recommending a DG set installation & Turbine overhauling
** Energy saved after installation VFD in FD & OFA fan
** Appreciation by CMD for attending fault of Automatic Voltage Regulator of Static Excitation of Generator in yr 2010
** Paper machines & associated plants being run only with Captive Power Plant disconnection of MPEB grid supply in Aug 96
** Essayed a stellar role in maintaining Plant Power factor as up to 0.90 as a whole.
** Orchestrated reduction of Power Consumption by providing : o VFD’s in ID, FD & SA Fans.


o Lower Capacity Feed Pump. (160 KW to 90 KW) o Power saver lighting fixtures and by providing timer for auto on/off.

Equipment / Plant Handled  :
** HT Panels/Transformers/Generator’s/Series Reactors/
** Air Circuit breakers/ Vacuum Circuit Breakers/Oil circuit breakers
** PCC’s, MCC’s
** Motors & its auxiliaries
** VFD’s/Capacitors
** Lighting
** 132 KV Sub Station Other Activities
** Accountable for synchronizing of TG with other TG & Preventive, Schedule

Breakdown maintenance of  :
** 12.27 MW TG (Make-BHEL), 3x5 MW +2 MW TG (Make-Westinghouse)
** All Auxiliaries of Stoker fired Boiler (75 Ton/Hr & 3x36 Ton/Hr) & its MCC’s like PCC, MCC, TG MCC, DM plant MCC etc.
** HT panel, VCB’s, Transformer, ACB’s, VFD’s & Motors upto 350 KW (6900 Volt, 3 phase)
** Electro Static Precipitator (ESP)
** Generator Protection Relay Panel,

Generator Automatic Voltage Relay Panel  :
** Handled Preventive, Scheduled, Breakdown maintenance of Electrical equipment installed in Captive Power Plant.
** Identifying the defects in the equipment in terms of heat, noise, vibration and carrying out the adequate repairs.
** Regular analysis of power consumption data of plant and action for deviation in data.
** Regular efforts to reduce Energy Consumption in terms of Power, Water, Air etc

TRAININGS  :
One Year Training Course from Nepa Ltd., Nepanagar (M.P.) under Govt. of India’s Training Program
** Two Years Training Course as Management Trainee in Nepa Ltd., Nepanagar (M.P.)
10 Days Training on Static Excitation Equipment at BHEL, Bangalore
** Swift India Pulse 2000 by NIIT  : 54 hrs
** Re-orienting work place for competitive edge : 3days
** Managerial excellence for 2 days
** Quality of life Training programme : 2days
** Maintenance management : 3 days
** Boiler condition monitoring efficient & maintenance : 3days

EDUCATION :
1978 11th from Nepanagar higher secondary school, Nepanagar (MP) with 71.75% M.P 1983
B.E. (Electrical Engineering) from Govt. College of Engineering & Technology, Raipur (Chhattisgarh),
Ravishankar University with 69.65% (First Class)

OTHER  :
1996 B.O.E. Exam from M.P. (Under Boiler Operations Engineering Rule 1968)

PERSONAL DETAILS :
Date of Birth : 29th September, 1960
Address : C-14, Station Road, Nepanagar , District Burhanpur ( M P), Pin 450221

Languages Known : English and Hindi

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.