Welcome Guest

Site / Construction >> Fabrication Engineer 
Fabrication & Erection Engineer Resume Sample, Experience : 11 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Fabrication & Erection Engineer
Job related skills / software:Manpower Planning and scheduling, Checking civil foundations elevation before steel, Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time
Category:Site / Construction
Sub Category:Fabrication Engineer
Years of Experience:11 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.Tech. : Bachelor of Technology
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

MOHD SHAHID RAHMAN
Mobile no :-9634517459/9973652064.
Email id : shahidproject84 AT gmail.com

Mechanical Engineer with 11+ years experience in fabrication & Erection of Steel Structure.

CAREER OBJECTIVE :
Managing day to day operational aspects of projects by effectively applying methodologies that enforce project standards and minimize exposure and risks on projects. Collaborative, team-oriented leader with ability to work in multicultural environments, meeting challenges and build relationships with all levels of people in industry.

WORK EXPERIENCE :-
11+years working experience in the field of fabrication, Erection and Commissioning of Steel Structures (Pre Engineered buildings ‘PEB’), Road bridge girders and Other infra structure, structural fabrication & Industrial plant setup, Peb supports member & Mezzanine structure, Tower supports structure, Power sub grid station, etc. I have also done work on Multi stories building, Railway station , Rail Car Shed, Carriage house & Washing yard,Metro rail sub-station, Indoor & Outdoor stadium, Ware house,

Air port, Hanger, Domical & Curve structure, Porta cabin, Walkways, Sheds, Platform, Substation & LV Room, Guard Rail, Hand Rail, Precision tubes, M.S tubes & pipe (1/2” to 108”). Deck sheet, Hi-Rib sheet, Standing & zip sheet, Fiber roof sheet, Louvers, Ridge ventilator, Turbo ventilator & Aluminum door & window frame works, Production & Erection with Assembly in engineering supports to R & D with excellence.

PROFESSIONAL EXPERIENCE :
1. Experienceand satisfactory success trackrecord in the Field of Metal Buildings Industry (Fabrication, erectionand installation of Roofing & cladding in steel structures and Equipment installations).

I have got opportunity to work with some prestigious clients like :Jindal Saw Ltd, BHEL, L&T Delhi-Metro Rail, Balco, Tata Motors, Johnson & Johnson, ACC Ltd, Arani Power, IMP Power, Telcon, Mumbai Railway, NRB Baring, Patna Railway, HAL, Samsung, Nectar life science, Bajaj Motors, Tata Telco, Thermax, Caparo Engg, Federal, Alps industries, Kalpatru powers, etc,and successfully completed following major PEB projects.

** Project of M/s WEG Ltd area 45000 SQM, Located at Tamil nadu.
** Project of M/s LG Ltd area 12453 SQM, Located at Pune.
** Project of M/s EBSL Ltd area 46200 SQM, Located at Nagpur.
** Project of M/s GPT infra Ltd area 31250 SQM, Located at Harnaut, Bihar.
** Project of M/s Common Wealth Game 2010 (Dr S.K. Stadium) area 123342 SQM, Located at Delhi.
** Project of M/s Common wealth Game 2010(Indra Gandhi Stadium) area 59876 SQM Located at Delhi.
** Project of M/s MRVC area 11000 SQM, Located at Mumbai.

2. Knowledge of Peb structural erection & detailing of general assembly (erection) drawings, shop drawings & bill of materials (BOM) for built-up or hot-rolled pre-engineered steel buildings & structural steel buildings like flat roof, Transition, High rise, Skewed, Multi-gable, Lean-to, valley, Curved, Aircraft hangers clear span, Multi gable span, Mono slope, Roof system, Truss, oval shape, Bridges, Car parks & Cut out buildings, etc.

3. Taking up assignments of Fabrication and Erection of steel buildings involving Columns, Beams, Trusses, Gable frames, Purlins, Runners, Crane girder, Bracings, Pipe Rack, Chequred plate forms, Cat walkways, Ladders, Staircases, Fascias, Partitions, Base plate, Shim Plate, Riser Grating, Ceilings, Doors, Windows, Personal doors, Roof monitors, Roof curbs, Ridge ventilators, Framed openings, Louvers, Liners expansion joint, Jack beams, Hand Rails, Pipe flashings, Cat ladders, Gutter, Haunch connections, Insulations, Roof Sheeting and all type of claddings etc.

4. Skilled in handling multifaceted projects involving planning, budgeting, monitoring progress and executing & controlling keeping compliance to preset timelines & cost parameters.
5. Preparing of General Assembly drawings, and Detail drawing for the projects, and Project Planning and Discussion.

6. Planning, monitoring the project, dealing with client for specifications, drawings etc, understand the contract, scope, billing.
7. Preparation of Fabrication, Erection schedule to meet the target with in planned time frame, Manpower handling and stage inspection of structures at site, certifying the sub-contractors bills and coordinating for preparing the client bill.
8. Coordinate the site activities and communicate with sub-contractors, project management, procurement and purchasing.

ADDITIONAL QUALIFICATIONS :
WELDING TESTING :-NDT Level II-Ultrasonic Test, Radiographic Test, Penetrate Test, Visual Test.
MATERIAL TESTING :-Magnetic Particle Test, Tensile Strength, Hardness.

COMPUTER /SOFTWARE SKILLS :
OPERATING SYSTEMS :  Windows XP, Vista, Word, Excel, Power point.
PACKAGES :M.S Office, PRIMAVEERA (V3&V6), M.S Project, Auto-Cad,Testing Tools, ERP, Nesting, CAD & CAM.

 WORK RESPONSIBILITIES & ROLE :-
1. Job Scope Preparation for Site Work. Erection and Evaluation of Bids. Quotations and Enquiry. Finalized the Contractor Quotations and Issuing the Work Orders.
2. Manpower Planning and scheduling.
3. Checking civil foundations elevation before steel (columns/frames Erection).
4. Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time.
5. Supervising erection of main steel girders and bracing between frames (with consideration of erection sequence).
6. Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection.
7. Daily achieved the Erection target of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
8. Resolving any unexpected technical difficulties, and other problems that may arise.
9. Inspection & Quality Control. Coordination with Inspection Agencies.
10. Conducting Weekly Progress Review Meetings and Issuing Progress Reports.
11. Final Inspection Including Painting and Job would be Handover to the Maintenance People.
12.


Checking the Final Bills & Submitting to the Head Office.(MIS)
13. Enforcing of the Safety Rules and Maintaining ISO Standards.
14. After a schedule has been updated, then a review of the future resource requirement, project end date and cash flows may be made.
15. Segregating and planning the entire PEB (Pre Engineered Steel Building) project into phase wise according to the material availability in shop and erection sequence at site.
16. Control the site activities with minimum tolerance by proper decision making and leading power also maintained the work with quality and safety according to the company policies.
17. I have judiciously used erection testing tools such as Laser light, Thoro light, Torque wrench, Weight gauge, DFT, etc for erection purposes with excellence.
18. Collect the job Completion Certificate from the Client.

PREVIOUS ORGANIZATION DETAILS :
Previous Company : Everest Steel Building Solution Ltd,
Designation : Sr. Engineer (Project & Erection).
Duration : 10 Sep 2012 to 05 0ct 2013.

PREVIOUS WORK RESPONSIBILITIES & ROLE :-
1. Development and verifying the Structural layouts for Grid & Bay.
2. Acting as the main technical adviser on a construction site for subcontractors.
3. Coordination for Engineering Drawings and Documents with Contractors for Fabrication & Erection of Steel Structures &Equipments.
4. Capable of solving complex problems and work in high pressure situations.
5. Effectively contribute to the overall team / company targets.
6. Co-ordinates with project people, production foreman, purchase and stores team and arrange the materials in time.
7. Effective utilization of men, materials and machine.
8. Attending the site review meetings with customer & with my superiors.
9. Coordinate with Purchase, Sub Contractors, operation and other interface teams for resolving all site related issues on regular basis.
10. Planning and scheduling of Anchor bolt casting, Painting, erection sheeting and Alignment of Structure as per drawing.

SUCCESSFULLY MANAGED AND COMPLETED FOLLOWING PROJECTS :
** Erection of PEB for M/s Indic on enterprises Ltd at Ranchi.
** Erection of PEB for M/s Haldiram & Snacks Pvt Ltd, at Noida.
** Erection of PEB for M/s New Holland Ltd, at Noida.
** Erection of PEB for M/s Ranbaxy Ltd at Indore.
** Erection of PEB for M/s Everest Steel Building Solution Ltd at Ranchi.

PREVIOUSWORK RESPONSIBILITIES & ROLE IN PERIOD OF PROJECT & ERECTION :
1. Finalizing the contractor.
2. Preparation of schedules for site activities.
3. Dimensional Inspection of Various Structural Components as per the given drawing and IS Standards.
4. Monitoring on inspection reports on stage wise.
5. Preparation of fabrication, erection & commissioning schedule to meet the target within the planned time frame.
6. Checking plans, drawings and quantities for accuracy of calculations.
7. Ensuring all materials used and work performed are as per specifications.
8. Overseeing the selection and requisition of materials and site.
9. Agreeing a price for materials, and making cost-effective solutions and proposals for the intended project.
10. Managing, monitoring and interpreting the contract design documents supplied by the client/architect.
11. Liaising with any consultants, sub-contractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
12. Daily achieved the Production & Erection target of the site, including supervising and monitoring the site lab our force and the work of any subcontractors.
13. Raising Checking and forwarding of Bills of client Erector.

PREVIOUS WORK RESPONSIBILITIES & ROLE IN PERIOD OF PRODUCTION :
1. Responsible for process improvements.
2. Preparation of daily production plans.
3. Planning of the materials and tools for the required job.
4. Executing the jobs according to the sequence, priority and targets.
5. Maintaining the job sequence in such a way that no idle hours are counted.
6. Reducing cycle times of production.

PREVIOUSWORK RESPONSIBILITIES & ROLE IN PERIOD OF MACHINE COMMISSIONING :
1. Erected crane beams of 5 to 20 MT capacities.
2. Responsible for setup of Malty - Torch C.N.C. Cutting Machine (Essab) Line.
3. Resp for setup of Steel Invest SCI 1500/E and Zigong H-Beam Welding m/c Line.
4. Elkland C & Z Roll Forming Machine Line.
5. Responsibility for setup of 13, 20 mm Shearing Machine supplied by Derma& L.V.D.
6. Responsibility for Hydraulics power press Machine 10 tones and 20 tones.
7. Responsibility for Sand and Iron blasting machine made by South Korea.
8. Responsibility for Deck sheet profiling machine made by China.
9. Responsibility for standing sheet profiling machine made by China.
10. Responsibility for FICEP and Punching machine made by Italy.

SUCCESSFULLY MANAGED AND COMPLETED FOLLOWING PROJECTS :
** Erection of PEB for M/s South Asia Breweries Ltd at Aurangabad.
** Erection of PEB for M/s L&T MHI Boilers Ltd at Hazira.
** Erection of PEB for M/s Brahma Kumar Pvt Ltd at Madh Pradesh.
** Erection of PEB for M/s Sona axial Pvt Ltd at Rudrapur.
** Erection of PEB for M/s K.S Oil Pvt Ltd at Kota.
** Erection of PEB for M/s SSLL Pvt Ltd at Unjha, Gujarat, etc.

TRAININGS ATTENDED :
COMPANY : M/s Indian Oil Corporation Ltd. (Barauni).
Duration : Six Weeks
Brief description :Thermal Power Station, Mechanical Planning, Mechanical work shop, BXP, AVU.

ACHIEVEMENTS :-
1. Highest Production in a day’s & month.
2. Best employer of the month (2010) by Era building system.
3. Minimized the off cut generation with Utilized.
4. Timely completion and hand over the Common wealth game 2010 ( Dr KARNI SINGH STADIUM) 50 meters shooting range, 25 meters shooting range, 10 meters shooting range, and 3 no’s shooter stand, 3 no’s Trapeze stand.
5. Certified internal Auditor for ISO 9001 :2000. Hands on experience in the implementation of ISO Processes and concept for achieving process quality.
 

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.