Welcome Guest

Site / Construction >> Site Engineer / Manager / Incharge / Supervisor 
MEP Manager Resume Sample, Experience : 7 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:MEP Manager
Job related skills / software:Responsible to ensure that the site is supplied with all documentation, methods and materials needed to carry out the works, Prepare the construction method statements and risk assessments, and develop work methods and temporary works necessary for the site.
Category:Site / Construction
Sub Category:Site Engineer / Manager / Incharge / Supervisor
Years of Experience:7 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Sushant Eknath Morey
Address :-Suryakiran CHS, Plot No.1, D/10, Veer Sawarkar Nagar, Thane-(w),400606,Maharshtra, India.
Email : sushant_morey AT yahoo.co.in; sushanteknath.morey AT fcc.es
Phone : +966-549197842
Skype ID : sushant.morey

Career Objectives :
Securing a promising position in industry and contribute efficiently towards the goals of organization. Experience : - TOTAL EXPERIENCE:- 7 YEARS +

Current Company  :FCC, Spain (Fast Riyadh metro alliance)
Designation  : MEP-Technical Office Engineer.
Career Graph : July’2016 MEP Engineer in FCC industrial, Riyadh, SA. (Under Ground and Elevated)

Job Profile :
1. Responsible to ensure that the site is supplied with all documentation, methods and materials needed to carry out the works.
2. Prepare the construction method statements and risk assessments, and develop work methods and temporary works necessary for the site.
3. Prepare temporary works drawings and site related design drawings.
4. Design, review & finalization MEP drawings, GFC/Shop drawings and other project related drawings.
5. Develop the job safety analysis.
6. Construction coordination meetings with consultant and resolving field conflicts and problems for MEP, reviewing progress against programmers, reviewing drawings & materials against specification. Anchoring and planning installation & commissioning activities of various equipment’s conducting tests & inspections to ensure operational effectiveness of utilities.
7. Follow up on the permanent work design and coordinate this with the site.
8. Coordinate on a daily basis with the subcontractors, and assist in the preparation of the work requisition for the subcontracted works.
9. Prepare technical and commercial comparison sheets of offers received from the subcontractors, and follow up of the subcontracted works, including the payment applications.
10. Prepare work requisition for all required permanent materials, and prepare material submittals and follow-up of the approval process.
11. Follow-up on the deliveries and invoicing of these permanent materials.
12. Anticipate standard solutions and take initiative and make suggestions, challenge prevailing assumptions.
13. Plan, organize and prioritize own work; seek confirmation of priorities when confronted with unusual situations.
14. Carry out site inspection on completed works with Electrical, HVAC, firefighting, Coordinator & Consultant in accordance with the approved shop drawings.
15. Understand role in the team and in the broader departmental organization, document best practices and coach one or more specialists.
16. Demonstrate responsibility and ownership and report spontaneously to my manager. Summarize data in a logical way and check whether my own observations or interpretations are correct.
17. Dealing with similar or regularly reoccurring situations, and start to apply risk management analysis.
18. Preparation of detailed Site quantities requirement based on the consultants approved drawings.

April ’2015,Fomento De Construcciones Y Contratas (FCC Spain), as TBM External Facilities Engineer for the Prestigious Riyadh Metro Project.(Under Ground)

Job Profile :
1. Planning for running spares required for smooth TBM operation and construction equipment.
2. Planning and scheduling of installation and commissioning of various TBM facilities like Cooling Tower, Gantry Crane, Bio-component Plant, Diesel Generation Plant, Decantation tank , before commissioning of TBM.
3. Preparation of drawings for installation of temporary piping system in tunnel.
4. Keep track of quality, quantity, stock levels, delivery times, transport costs and efficiency
5. Organizing shipments, coordinating drivers, vehicles, loads and journeys.
6. Monitoring various operations taking place inside TBM.Mechanical and Oil Hydraulic Knowledge for understanding the drawings and diagrams.
7. Taking care of the Cutter Head welding, Maintenance Man power management, Experience with trouble-shooting of TBM on-site.
8. Installation and commissioning of ventilation system in tunnel.
9. Planning of backup system arrangement for tunnel boring activity and direct involvement with stores towards procurement of spares as and when needed.
10. Material Management for TBM & Mechanical plants, Monthly Planning of spare parts to be used and inventory control, Accomplished Planning of monthly work to be done.
11. Designing various TBM utilities and executing the fabrication of the same.
12. Assembly of gantry crane and all the conveyor systems.
13.


Planning and executing booster assembly for the conveyor belt inside the tunnel.
14. Designing and executing all necessary utility support equipment for the TBM pass-through in open stations.

August 2011- March’2015 Unity Infrastructure Ltd, as Mechanical Engineer (TBM).
Job Profile :
1. TBM Maintenance planning, assembly and commissioning (Robbins Gripper TBM), Interpretation, orientation and supplements of TBM Drawings, document and instructions.
2. TBM Operating and Assisting TBM Operator of Robbins TBM of 6.25 diameter.
3. The responsibilities of managing the material and the Machinery well in time for the execution of various activities at the site and Planning for preventive maintenance of equipment.
4. Accomplished Lowering, assembly and commissioning of ROBBINS TBM successfully
5. Controlling work performance & monitoring work quality and taking corrective action to solve any problem rapidly.
6. Maintenance and repairing of hydraulic hose of TBM and all kind of heavy equipment.
7. Give day to day TBM technical support for breakdown diagnostics & repair, including risk and failure Analysis.
8. . Accomplished commissioning of Sub-station, Grout plant, Locomotive (Schoma and Atlas Copco) done. Fit to work HYPERBARIC atmosphere

Projects Done / Current Projects :
Title : Construction of Tunnel for Riyadh Metro. The Riyadh Metro is a rapid transit system. Client: Riyadh Metro (RMTS) Project Value: $ 8.5 Billion Nature of Work: 12 under Ground Stations and 13 km of Tunnel with TBM (Dia 9.56 M)
Designation : TBM External Facilities Engineer (HERRENKNECHT Diameter 9.56 meter) .

Title  :-Design and Construction of Water Tunnels, Client: Bombay Municipal Corporation,(MCGM) Project Value: Rs. 1145.88 Crore Nature of Work: Water Tunnels (Thane to Bhandup)
Industrial Trainings :- CASPRO METALLIC LTD
Duration : 30 days
An organization providing automobile casting components to automobile industry.

Major Training :
Godrej & Boyce  :
** Material Handling Equipment’s.
** Manufacturing processes using lean strategy.
** Statistical Quality control, & kaizen.

Educational Credentials :-
** Bachelor of Engineering in “MECHANICAL ENGINEERING “from “TKIET College of Engineering” Shivaji University, Kolhapur, Maharashtra.
** B.E(Mechanical Engineering) Shivaji University 2011 67.38%
** Diploma(Mechanical Engineering) Govt.Polytechnic Mumbai 2008 76.78 %
** High School(SSC) Mumbai university 2004 69.60%

Skills :
** Highly motivated & enthusiastic to work in a team.
** Presentation and leadership skill.
** Adjustable to any environment.
** Effective Communication skill and leadership qualities.

Academic Projects Undertaken :
Major Project : Water Powered Car
** Project description : It is an experimental model of an engine working with water as fuel.
** Water can be broken into two elements by electrolysis.
** The resultant can be used as a fuel.
** The smoke that comes out after combustion is water vapour, hence environment friendly.
** Role in project : Detailed study of previous available similar type of device, (its limitation), designing Layout, building a electrolysis cell, demonstration of the concept.
** Client of project : Government polytechnic,Mumbai.

Major Project II :
Special Purpose Machine
** Designing and building the machine.
** Reducing the manufacturing time by 300%.
** Client : Caspro metallic,Kolhapur.

Strenths & Ethics  :
** Can work under pressure and stress, believe in team work, always willing to learn, Self motivator.
** Do smart work rather than hard work, punctual and polite in nature.
** Excellent make communication and relationship with others.
** Good problem solving skills.

Computer Skills :
Languages  : Auto Cad, CNC machine, Excel(advanced), MS Office Power Point.
Operating Systems  : Windows 2000/XP, Windows 7, Windows 8.

Personal Vitae  :
Name  : Sushant Eknath Morey.
Father’s Name  : Eknath Morey.
Mother’s Name  : Rekha Morey.
Date of Birth  : 28 April 1988

I hereby declare that above particulars are best of my knowledge and belief.

Date :
Place : Riyadh

(Sushant Eknaths Morey)

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.