Welcome Guest

Site / Construction >> Maintenance Engineer / Manager 
Operation Maintenance Engineer Resume Sample, Experience : 5 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Operation Maintenance Engineer
Job related skills / software:Gas Turbine, Power Plant Operation Maintenance
Category:Site / Construction
Sub Category:Maintenance Engineer / Manager
Years of Experience:5 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electronics and Communication
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

OBJECTIVE :
To be associated with a progressive organization that provides an opportunity to apply knowledge and skills in order to abreast with latest trends and to be part to the team that works towards the growth of the organization and thereby gain satisfaction in all aspects in process.
TECHNICAL QUALIFICATION :
1.Qualification :BE(ECE)
(Electronics and Communication Engineering)
Institution:Anna University
2.Qualification:diploma(Electronics and Communication Engineering)
Institution:DOTE (Directorate of Technical Educations)
3.Qualification:HSC (Mathematical groups)
Institution:Syed Ammal Higher Secondary School
COMPUTER SKILLS
Operating systems :windows XP, Windows NT, Windows 2000
Software applications:Microsoft office XP, Microsoft office 2000, Microsoftoffice 1997, MS Word, MS Excel, Outlook Express, Powerpoint.
Languages and scripts:C, C++, HTML, TCP/IP
Hardware:Intel, Dell Servers Intel Network Adapters, HP Printers
TRAINING PROGRAMME ATTENDED :
DISTRIBUTED CONTROL SYSTEM:
1.Five days in Pune HONEYWELL C200 Controllers DCS Engineering training.
SAFETY TRAINING PROGRAMME:
2.Basic life support & life saver program conducted by M/S. USHA FIRE SAFETY EQUIPMENT’S (P) LTD., Chennai.
3.Fire safety equipments and power plant safety training in United Arab Emirates of Civil Defence, Ras Al Khaimah, UAE
PRESENT EXPERIENCE :
COMPANY NAME :GAS TURBO POWER STATION,(APGPCL)
ANDHRA PRADESH. INDIA.
CONCERN :OPERATION & MAINTENANCE SOLUTIONS
COMPANY MAKE :BHEL GAS TURBINE & GE FRAME 9171E
CAPACITY :272 MW (COMBINED CYCLE)
STAGE1 :33X2(GTG) + 34X1(STG)
STAGE2 :112MW (GTG) +60MW (STG)
PERIOD : March 2011 to till date.
DESIGNATION :C & I MAINTENANCE ENGINEER
JOBS DONE DURING O & M :
COMISSIONING OF (GAS TURBINE MS6001 B) SPEEDTRONIC MA


RK IV, V, VI CONTROL SYSTEM
:
**Servo valve (SRV, GCV, IGV) calibration & servicing
**Logic forcing
**EEPROM upload & download
**GT start-up & shutdown activities
**Pre-commissioning  & commissioning checks of mark 5 and mark 6
**Commissioning of mark 5 and mark 6 on gas turbine
**Installation, troubleshooting & replacement of system card in mark IV, V,VI
**Installation, checking & commissioning of all field devices on a GE gas turbine
**On base wiring of turbine
**Cables & cable trays laying
**Field instruments calibration, installation & loops testing
**Fire & gas system: gas detectors(combustible gas), flame detectors(ultra violet), fire fighting system (CO2)
**Control constants changing
HONEYWELL EXPERION PKS DCS SYSTEM:
**Pre-commissioning & commissioning checks of PKS system
**Installation of server, stations, Honeywell application software
**Making changes in configuration logic
**Programs, utility programs & system administration menus
**Installation, checking & commissioning of all field devices
**Field instruments calibration, installation & loops testing
**Installation of cabinets & consoles in control room
**Terminations field, junction box & cabinet side
**Loop connection and cold loop testing
**On base wiring of plant
JOBS DONE DURING ERRECTION & COMMISSIONING
FOLLOW UP & WORK EXECUTION:
**P & I Drawings, panel internal wiring drawings (turbine control panel & boiler MCC), hook up drawings, junction box details, cable termination details, cable tray root drawings.
TESTING & COMMISSIONING OF PROCESS INSTRUMENTS:
**Transmitters, switches, gauges, temperature elements, motor operated valves, Pneumatic control valves, hydraulic control valves, guillotine dampers, diverting dampers, on-off valves, servo valves.
CALIBRATION EQUIPMENT HANDLED:
**HART communicator (MAKE- YOKOGOWA)
**Dead weight tester MAKE- RAVIKA & NAGMEN (high pressure calibration)
**High pressure calibrator MAKE- NAGMEN & DRUCK
**Low pressure calibrating pump MAKE- NAGMEN & DRUCK
**Micro processor based temperature calibrator NAGMEN & DRUCK
**Multimeter
MAJOR COMMISSIONING ACTIVITIES PARTICIPATED:
**Turbine commissioning activities.

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.