Career Objective: -
Intend to build a career with leading corporate of hi-Tec environment with committed & dedicated
People which will hold we to explore myself fully and realize my potential willing to work as
a key player in challenging creative environment.
Education Profile:-
Course Institute / University Year ofPassing % of
10th G.J.H.S. Narsingarh Damoh / M.P.B.S.E Bhopal 2003 59.20%
Diploma in Elect Engg. Govt. Poly. Damoh / RGPV Bhopal (M.P.) 2008 61.73%
B-Tech in Elect. Engg. C.T.V.P. Raipur (C.G.) / RVD Rajasthan Persuing
Project: -
Category Details
Major Automatic voltage stabilizer
Work Profile: -
Organization Description Period Department Designation
GODAWARI POWER AND ISPAT LTD. RAIPUR. (C.G) One of the Major Power & Steel producer in C.G. 16-06-2008 To Till Date Electrical
(Power Plant)
Jr. Engineer
Company profile:-
Organization
Godawari Power & Ispat Ltd Description.
An one of the leading steel & power manufacturing company having 1x70 TPH AFBC, 1x56 TPH WHRB, 2x51 TPH WHRB, 1x30 TPH WHRB and 1x 30MW, 1x25MW, 3x10MW Generators in running condition & 100 TPH BFBC & second bay of 132/11KV substation in project stage.
TRAINING:-
** A College Training Damoh Power Grid Substation.
** 15 days vocational training in diamond cement Birlapur Narsingarh,Damoh (M.P.)
Responsibilities: -
** presently working as a shift In charge In 132/11 KV Sub Station
** Create power report & sort out coming problem.
** Preparing the Daily Generation Report, Aux.
consumption report
JOB PROFILE:-
** Involved in 100 TPH BFBC Boiler Project Erection & Commissioning at (GPIL)
** Involved in the Erection & Commissioning of second bay of 132 /11 KV Substation Installation Project in Raipur (G.P.I.L.) including:-
A) Transmission line work
B) Switchyard system (Installation of 45 MVA T/F, L.A, SF6 C.B, C.T, P.T, Post Isolators, Knowledge about Earthing Layout)
** Knowledge about power distribution& power system studies
** Knowledge about protection & relay configuration(Setting)
** Knowledge about control scheme & logic ckt. & illumination scheme..
** Sound knowledge of Synchronization
** Knowledge about Handling ESP transformer of HIRECT make
** Handling breakdown and general maintenance during shift
** Knowledge of electrical operation & safety system in CPP
** Maintenance of (CWP,CEP,ID-FAN,FD-FAN,BFP,ACWP,PA FAN)Motor
** Work in control room and handling TG operation 3X10MW&1X30MW
** Knowledge about HT < breaker maintenance & testing
** Knowledge about transformer maintenance & testing
** 2100 kVA DG Operation & Maintenance
** Knowledge about AC Drive & Starters
Software Exposure:-
** Operating System :- Ms-Dos window 98/2k/XP
** Languages :- Ms Office
** SAP System in Power Plant Maintenance
Hobbies:-
** Listening to music & Playing Cricket