Mechanical Site Engineer Resume Sample, Experience : >20 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Mechanical Site Engineer
Job related skills / software:Fabrication, Erection, Testing, Pre-commissioning and Commissioning, Project Co-ordination, Planning, Billing schedule.
Category:Site / Construction
Sub Category:Site Engineer / Manager / Incharge / Supervisor
Years of Experience:>20 years
State:West Bengal
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:Diploma
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Resume  :
Kunal Kumar Putatunda

Communication Address  :
Raj Apartment, 2nd Floor/3A
E-89, Baghajatin Station Road
Behind Ramthakur Ashram
P.O. Baghajatin, P.S. Patuli
Kolkata-700086

Personal Details  :
Education Qualification  :
Diploma in Mechanical Engineering, West Bengal, India
Diploma in Industrial Safety, Chennai, India

Contact No  : +6051610034(Malaysia) 9051632773(India), 9051632967(India)
Email ID  : kunalburnpur AT gmail.com, kunal_p31 AT rediffmail.com
Passport No  : M9554591 Issuing: Dubai
Date of issue  : 13.07.2015 Validity: 13.07.2025
Nationality  : Indian Marital Status: Married DOB: 30.12.68

Professional Summary  :
Approximately 23 years experience (Fabrication to Commissioning) of Oil & Gas, LNG, Cryogenic, Crude oil tank, Steel Plant, Petrochemicals and Refinery, Transmission projects work with Multinational companies in India and United Arab Emirates.

Areas of Expertise  :
** Fabrication, Erection, Testing, Pre-commissioning and Commissioning.
** Project Co-ordination.
** Planning, Billing schedule.
** Attending Weekly and Daily project co-ordination and progress preview meeting as per planned vs. achieved with client.
** Daily progress meeting planned vs. achieved with Engineers and Supervisors.

Professional Experience  :
Project  : RAPID, PETRONAS
Company  : PUNJ LLOYD SDN BDH, MALAYSIA
Duration  : DEC 2016 toTILL DATE
Positions  : Senior Manager
Activity  : Project Co-coordination of 9 no’s tanks in different dia and different height Doom Roof tanks with Jacking method. Weekly progress meeting with client, Internal meeting and co-ordination meeting with our staff regarding the weekly plan and achieve. Construction In charge. Estimation the material requirement for the completion of project, preparing MTO, issuing indent for procurement. Co-ordination with Owner. Expedite the job as per project schedule.

Project  : VOPAK HORIZON (BLACK PEARL Project), FUJAIRAH, UAE
Consultant  : ENOC, UAE
Company  : AUDEX FUJAIRAH LL FZE, SINGAPUR
Duration  : March 2015 to April 2016
Positions  : Construction Superintendent
Activity  : Project Co-coordinator of five no’s 68mtr Dia and 28mtr height Single Deck (Pontoon Box) with Aluminum Doom Roof tank, Slope tank, Diesel tank, Foam tank, Fire Water, and Foam system. Appx. 15000MT Pipe rake Structure fabrication and erection, planning, Client dealing, daily monitoring Of the project as per the plan, weekly and daily co-ordination meeting with client and with Management, staffs and Sub-contractors.

Project  : SAIL (Steel Authority of India Ltd.) Modernization Plant, Burnpur, WB
Consultant  : MECON
Company  : U B Engineering Ltd. Pune, Maharashtra, India
Duration  : February 2009 to February 2015
Position  : Project Manager
Activity  : Site In charge of Blast Furnace(Capacity 8000MT per day), Hot Blast stove, SGP, Wet & Dry ESP, Basic Oxygen Furnace, SOS, Converter, Ducting, Ladle preparation, FACS, BMHS system, Structures project co-ordination, monitoring, client dealings, planning, weekly and daily progress preview meeting with client, company Management, Staffs and sub-contractors.
Company  : PUNJ LLOYD LTD since July 1999 to February 2009

Project  : Indian oil corporation Ltd. Naphtha Creeker Unit
Client  : Indian oil Tanking Ltd.
Position  : Dy. Manager
Duration  : Aug 2008 to Feb 2009
Activity  : Construction of 4 nos. Cryogenic tank 36meter dia. and 20 meter height (each tank) With 250 MT doom roof which was lifted by external air pressure. Fabrication, Erection of Roof Block assembly, Roof plate, Annular plate(CS)Bottom Vapor plate, Inner bottom, Secondary Bottom, NI wall liner, Shell plate(NI), Pump Column, pump column Structure, Bottom and top filling nozzles, Roof walkway, Roof nozzles, Pipe structure and Supports, Air lift temporary arrangement, Hydro-test of tank, partite filling Etc.

Project  : Petronet LNG, DAHEJ, GUJARAT
Client  : ISHIKAWAMAJIMA HARMA HEAVYINDUSTRIES LTD. JAPAN
Position  : Sr. Engineer
Duration  : Aug 2006 to July 2008
Activity  : Construction of 2 no’s LNG tank 80mtrs. Dia. And 42mtrs. Height (each tank). With 650MT floating Doom roof which was lifted by external air pressure 135 to 180 bar. Fabrication, Erection of Roof Block assembly, Roof plate, Annular plate(CS)Bottom Vapor plate, Inner bottom(CS), Secondary Bottom(N), NI wall liner, Shell plate(NI), Pump Column, pump column Structure, Bottom and top filling nozzles, Roof walkway, Roof nozzles, Pipe structure and Supports, Air lift temporary arrangement, Hydro-test of tank, partite filling Etc.

Project  : Panipat Refinery (IOCL), Para Xylene plant, India
Client  : IOCL (Indian oil corporation ltd.)
Consultant  : MECON, India
Position  : Sr.


Engineer
Duration  : July 2004 to July 2006
Activity  : Fabrication and erection of unit pipe, pipe support, Technological structure, Spring Support, vessel platform, ladder, stair, hydro test of the piping, pre commissioning, Commissioning, Final box up, as built.

Project  : Hazira port and receiving terminals, Surat, Gujarat, India
Client  : Hazira Cryogenic Engineering & Construction Management pvt. Ltd.
Position  : Sr. Engineer
Duration  : January 2003 to June 2004
Activity  : Construction of 2 no’s LNG tank 80mtrs. Dia. And 42mtrs. Height (each tank). With 650MT floating Doom roof which was lifted by external air pressure 140 to 180 bar. Fabrication, Erection of Roof Block assembly, Roof plate, Annular plate(CS)Bottom Vapor plate, Inner bottom(CS), Secondary Bottom(N), NI wall liner, Shell plate(NI), Pump Column, pump column Structure, Bottom and top filling nozzles, Roof walkway, Roof nozzles, Pipe structure and Supports, Air lift temporary arrangement, Hydro-test of tank, partite filling Etc.

Project  : Fujairah Water tank, Al Dahid, UAE
Client  : Al Jaber, Fujairah, UAE
Position  : Mechanical Engineer
Duration  : September 2002 to January 2003
Activity  : Construction of two water tank 45meter dia and 20meter height. Fabrication and erection of Bottom plate, shell plate, Roof structure, roof plate, Internal and external Piping, Pipe structure, supports, hydro-test, sand blasting, painting, pre-commissioning, commissioning, As built.

Project : Belgaum and Maharashtra Road project
Client : National Highway
Position : Safety Engineer
Duration : June 2002 to Aug 2002
Activity : Construction of 98km. four way lane. Follow the as per safety rules of Bridges, road, Crasher unit, Beaching plant. Rock blasting, transportations of material during construction.

Project : Dabhol LNG Storage & Re-gasification Project (ENRON), Maharashtra, India
Client : Skanska Cementation International Ltd. (UK.)
Consultant : WLGA Whessoe – UK
Position : Mechanical Engineer
Duration : July 1999 to January 2002
Activity : Construction of 3 no’s LNG tank 80mtrs. Dia. And 42mtrs. Height (each tank). With 700MT floating Doom roof which was lifted by external air pressure 135 to 180 bar. Fabrication, Erection of Roof Block assembly, Roof plate, Annular plate(CS)Bottom Vapor plate, Inner bottom(CS), Secondary Bottom(N), NI wall liner, Shell plate(NI), Pump Column, pump column Structure, Bottom and top filling nozzles, Roof walkway, Roof nozzles, Pipe structure and Supports, Air lift temporary arrangement, Hydro-test of tank, partite filling, water reservoir tank Etc.
Company : DODSAL LTD

Project : Jamnagar Refinery, Gujarat, India
Client : Reliance Industries ltd.
Position : Mechanical Engineer
Duration : November 1998 to June 1999
Activity : 3 no’s Sulpher Recovery unit and 2 no’s Aromatics unit. Fabrication and erection of processes piping, supports, Technological structure, Vessel erection, related piping, hydro test, pre-commissioning, commissioning, as built, final box up.
Company : Punj Lloyd ltd.

Project : Jamnagar Refinery, Gujarat, India
Client : Reliance Industries Ltd.
Position : Mechanical Engineer
Duration : October 1997 to October 1998
Activity : Fabrication & erection of 17 no’s Crude oil tank’s bottom plate, shell plate, annular plate, sump, shell nozzles, roof plate, roof structures, internal & external piping, supports, technological structures, hydro test, commissioning, final box up. Fabrication and erection of One no. Cryogenic tank’s with double wall bottom plate, annular plates, shell plates, roof plates, roof structure, roof nozzles, perlite nozzles, perlite filling, pump column, top and bottom filling nozzles, internal and external stair, hydro test.
Company : M/S RPG Transmission ltd, Rajmundry, Andhra Pradesh

Client : Indian Railway
Position : Mechanical Engineer
Duration : December 1995 to April 1997
Activity : Foundation of Mast, Mast erection, Bracket fixing, OHE cable erection, alignment, Substation installations, OHE line charging.

Attended Training programs  :
** One week safety training program organized by British Safety Council at Dabhol, ENRON Project.
** Firefighting fire prevention training organized by National SafetyCouncilat Dhabol, ENRON Project.
** Two week scaffolding training program organized by Skanska Cementation International at Dhabol, ENRON Project.

Date  :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.