Welcome Guest

Design Engineering >> Automation/ Mechatronic Engineer 
Automation Engineer Resume Sample, Experience : 11 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Automation Engineer
Job related skills / software:Maintenance of Transformers & ESP & Dust handling system, Maintenance and Trouble shooting of PLC Siemens,Shutdown / Breakdown/ Preventive maintenance of AC drives.
Category:Design Engineering
Sub Category:Automation/ Mechatronic Engineer
Years of Experience:11 years
State:Jharkhand
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:Diploma
Major / Specialization:Electrical
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

AIM :
Intended to build a carrier with leading corporate of hi tech environment with committed and dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a player in challenging and creative environment

QUALIFICATIONS :
Diploma in Electrical Engineering from Govt. Polytechnic Dhanbad, (Jharkhand) in Sep 2000

PRESENT OCCUPATION :
Working as an Asst. Manager (E&Automation) in GERDAU STEEL INDIA LIMITED an Integrated steel plant operates through, BF, Sinter plant, Rolling mill, steel meltingshop, & power plant.

EXPERIENCE  :
TOTAL EXPERIENCE - 11, YEARS
21 Nov 2012 to till date :
Position : Asst.Manager (E& Automation)
Department : Sinter Plant.
Company : GERDAU STEEL INDIA LIMITED
Location : ANANTAPUR (Andhra Pradesh)
Responsibility : Presently heading the Sinter Plant (E&A) as an Asst.Manager.

Key duties :
1. Involve in Sinter plant as a member of maintenance team, Maintenance of weigh feeder, belt weigher, field instruments, MCC panel, PCC panel, vvvf drives, soft starter, HT panel, Motor (HT & LT), ESP, dedusting system, etc & down time by continuous implementation & modification.
2. Trouble shooting of PLC Siemens S7 (300-200). & Micro PLC of GE Fanuc-versa max.
3. Maintenance, Calibration & troubleshooting of Weigh feeder (transweigh) & Belt weigher (transweigh & Indus).
4. Shutdown / Breakdown/ Preventive maintenance of 1400kw HT motor with LRS start system & LT motors up to 200kw.
5. Shutdown / Breakdown/ Preventive maintenance of LT motors ( slip ring & squirrel cage)Up to 200kw, AC motors, starters (DOL, RDOL, and STAR/DELTA), hydraulic power pack MCC panel, PCC panel, heavy EOT Cranes, Air Compressor
6. Maintenance , Calibration & troubleshooting of instrumentation system like Pressure, temperature, flow , level transmitter’s, control valves , solenoid valves, Thermocouples, RTD , etc.
7. Maintenance & troubleshooting of vvvf drives (Allen Bradley power flex 4/40/70/1336) & soft starter (ABB). & Micromaster440 (Siemens).
8. Maintenance & trouble shooting of electrical system like PCC, MCC, HT & LT switch gear, HT motor with soft starter (FCMA), LT motors, monorail cranes, etc.
9. Maintenance of Transformers & ESP (electro static precipitator) & Dust handling system.
10. Implementation of TPM & 5S system in our working area. Also maintain documentation.

02 JANUARY 2008 to NOV 2012 :
Position : Sr.ENGINEER (E& A)
Department : Sinter Plant & Ore Washery
Company : ADHUNIK METALIKS LIMITED
Location : ROURKELA (ORISSA)
Responsibility : Presently heading the Sinter Plant & Ore washery Plant (E&A) Dep’t as a Sr. ENGINEER.

Key duties :
1. Involve in project of Sinter plant & ore washery plant as a member of project execution team, erection & commissioning of PLC panel, weigh feeder, belt weigher, field instruments, MCC panel, PCC panel, vvvf drives, soft starter, HT panel, motor (HT & LT), ESP, dedusting system, etc.


after complete the project stabilized the plant & working in maintenance of sinter plant & ore washrey plant & down time by continuous implementation & modification.
2. Trouble shooting of PLC (Allen Bradley- logix 5563 processor) & Micro PLC of GE Fanuc-versa max & Siemens S7-300-200.
3. Maintenance, Calibration & troubleshooting of Weigh feeder (transweigh) & Belt weigher (transweigh & Indus).
4. Shutdown / Breakdown/ Preventive maintenance of 1000kw HT motor with Soft Stator start & LT motors up to 200kw.
5. Shutdown / Breakdown/ Preventive maintenance of LT motors (slip ring & squirrel cage) Up to 200kw, AC motors, starters (DOL, RDOL, and STAR/DELTA), hydraulic power pack, MCC panel, PCC panel, heavy EOT Cranes, Air Compressor.
6. Maintenance , Calibration & troubleshooting of instrumentation system like Pressure, temperature, flow , level transmitter’s, control valves , solenoid valves, Thermocouples, RTD , etc.
7. Maintenance & troubleshooting of vvvf drives (Allen Bradley power flex 4/40/70/1336) & soft starter (ABB)
8. Maintenance & trouble shooting of electrical system like PCC, MCC, HT & LT switch gear, ABB- spam 150c , HT motor with soft starter (FCMA), LT motors, monorail cranes, etc
9. Maintenance of Transformers & ESP (electro static precipitator) & Dust handling system.
10. Implementation of TPM & 5S system in our working area. Also maintain documentation.

10 Jan 2002 to December 2007 :
Position : Engineer (E& I)
Department : MINI BLAST FURNACE (MBF)
Company : SCAN STEEL LIMITED
Location : Rourkela (Orissa)

Key duties and Responsibilities :
1. Involve in project of Mini Blast Furnace & Sinter plant & as a member of project execution team, erection & commissioning of PLC panel, field instruments, MCC panel, PCC panel, vvvf drives, soft starter, LT motor, etc. after complete the project stabilized the plant & working in maintenance of Mini Blast Furnace & sinter plant .
2. Maintenance and Trouble shooting of PLC Siemens S7-300 .
3.Maintenance & troubleshooting of PCC Panel, MCC Panel, starters, LT switchgear, Relay, Air compressor & EOT crane,
4. Maintenance & troubleshooting of vvvf drives & soft starter (ABB).
5. Calibration, maintenance & troubleshooting of weigh feeder, & weighing machine.
6.Maintenance , Calibration & troubleshooting of various type instrumentation system like Pressure, temperature, flow , level transmitter’s, control valves , solenoid valves, Thermocouples, etc.
7. Maintenance & troubleshooting of 150kw LT motor with Soft Stator start.
8 .Maintenance and Troubleshooting of LT Motors, LT switchgear, LT Breakers (ACB, L&T) Power pack, air compressor, damper, etc.
9. Shutdown / Breakdown/ Preventive maintenance of LT motors (slip ring & squirrel cage)Up to 200kw, AC motors, starters (DOL, RDOL, STAR/DELTA), hydraulic power pack,Liftin electro magnet, MCC panel, PCC panel, heavy EOT Cranes,
10. Shutdown / Breakdown/ Preventive maintenance of AC drives (ABB),

Personal Data :
Marital Status : Married
Languages Known : Hindi, Urdu & English

Date  :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.