Welcome Guest

Site / Construction >> Project Engineer / Manager 
Project Electrical Engineer Resume Sample, Experience : 2 years

Sponsored Links:
    

Biodata

Name of the Candidate:Anilkumar Jagadi
Name of the Post Applied:Project Electrical Engineer
Job related skills / software:Prepare and update project schedule based on the contract, Set work program and target milestones for each phase based on the project plan, Monitor critical activities based on the project schedule and advise project management.
Category:Site / Construction
Sub Category:Project Engineer / Manager
Years of Experience:2 years
State:Karnataka
Gender:Male
Salary Expected per Month(Rs):20,000 to 25,000
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electrical
Email Id:jagadianu AT gmail.com
 
Are you looking for job now?:Yes
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

ANILKUMAR SJ
Email  : jagadianu AT gmail.com
PROJECT Engineer

SUMMARY  :
** Total 2 years’ experience in (Distribution Automation System (DAS) Master Stations, Communication System and Control Centre of experience EFACEC RTU testing, Firmware upload, configuration check, conversant with EFACEC Automation studio.
** Testing of CT and PT, testing of transformer, HVCT, LVCT, Resin ring type CT, Split core CT, Summation CT, Tape insulated CT, Rectangular CT.
** Application for approval of drawings in respect of newly established Master Unit sub-stations, switching stations, Master Receiving stations, Transmission Lines, Inter linking lines and UG cable lying of supplier installation.

EDUCATION & CERTIFICATION  :
** Graduated in Electrical and Electronics Engineering at Tontadarya College of Engineering, Gadag/VTU Belgaum, in 2015 with aggregate 61%
** 12th Std at Nisarga College, Kalaburagi, Pre University Board in 2011 with 65%
** SSLC at Govt. High School, Kalaburagi, Karnataka State Secondary Education Board in 2009 with 74%

EXPERIENCE  :
Company  : BELLFAST MANAGEMENT PRIVATE LIMITED
Client  : STERLING AND WILSON PVT LTD
Designation  : PLANNING ENGINEER – PROJECTS (LIASONING)
Duration  : February 2018 to Till Date

Roles and Responsibility  :
** Prepare and update project schedule based on the contract.
** Set work program and target milestones for each phase based on the project plan.
** Monitor critical activities based on the project schedule and advise project management.
** Prepares and submit updated work program and cash flow curve showing actual progress and identify areas of weakness and establishes means and methods for recovery, if any, as well as new critical activities.
** Monitor day to day work progress and prepare the weekly and monthly program and report.
** Maintain and record update of site work progress obtained from Project Manager.
** Prepares monthly report reflecting work progress summary.
** Report to the Project Manager about the current work progress and make comparison between plan and actual progress and study impact of alternative approaches to work.
** Participate in project meetings and discussions with the Client as required.
** Assists in preparing work program, cash flow and manpower histogram for tenders.
** Performs other duties and responsibilities as may be assigned from time to time.

PROJECTS (LIASONING)  :
** Requisition Letter to be updated as per the format provided
** Copy of Challan for having paid the prescribed drawing scrutiny fees online
** Copy of Work award if any
** Drawings incorporating items listed (to be uploaded along with other documents)
** All the drawings submitted shall be signed ones by
** The concerned officer not below the rank of Executive Engineer in case of supplier installations or
** The consumer/owner or authorized signatory in respect of the consumer installation as well as the Licensed Electrical contractor who is executing the works.
** Copy of License of the Electrical Contractor and permit of the supervisor.

Company  : Kalpa Electrical pvt ltd.
Designation  : Testing Engineer
Duration  : August 2017 to December 2018

Roles and Responsibility  :
** Testing of power transformer, reactor, CT, PT, HVCT, LVCT.
** Special Tests of transformer(CT and PT Accuracy test, HV test, induced over voltage test, magnetic reluctance test, load test, no load test, dvdf test, voltage test, resistance test
** Condition monitoring of transformer, partial discharge, vibration and noise.
** Power transformer residual life analysis.
** Power transformer maintenance.
** Major clients we work for are as mentioned below,
** ABB, SEIMENS, TATA POWER, LOAD CONTROLS PVT LTD, KPTCL, BESCOM, L&T, SCHNIDER ELECTRIC, JSW STEELS

Company  : ENVISION NETWORK TECHNOLOGIES PVT.LTD.
Client  : EFACEC INDIA PVT.


LTD,-BESCOM-DAS PROJECT, Bangalore
Designation  : Engineer
Duration  : July 2016 to June 2017

Roles and Responsibility  :
** Feeder Remote Terminal Unit (FRTU) Installation & Commissioning.
** Coordination with the BESCOM and EFACEC for carrying out Installation and Commissioning.
** Testing communication of Intelligent Electronic Devices (IEDs) like meters and relays through Modbus.
** Interfacing the FRTU with the Ring main Unit (RMU), configuring, interfacing and establishing communication with IEDs with RTU.
** Complete local testing of the input and output points (DI, DO, AI) and performing Site Acceptance Test of FRTUs.
** Project documentation and reporting.
** EFACEC RTU testing, Firmware upload, configuration check, conversant with EFACEC Automation studio, understanding the 3 way and 5 way RMU MFM & Relays information as part of DAS project, Trouble shooting skills of RTU, communicate well with local and abroad EFACEC Engineer, Able to handle the RTU tests independently and conduct the point to point testing at remote EFACEC RTU sites

PROJECTS DETAILS  :
Project 1  :Efacec Feeder Remote Terminal Unit (FRTU) I&C
Client  : Efacec - Bescom Project, Bangalore Karnataka

** Project manpower calculation and effective use of manpower to reduce cost. Coordination with the utilities for
** Carrying out Installation and Commissioning. Interfacing the FRTU with the Ring Main Unit (RMU). Configuring and interfacing relays and energy meters. Complete local testing of the input and output points (around 100 parameters). Site acceptance test and project documentation.
** Analyzing the system elements one by one in order to find out where the problem is.

** Micro URR hardware/Software
** Operation
** Power source
** Digital Input, Digital Output
** Micro URR communication
** DAS, MFM, RELAYS
** Distribution Automation System(DAS) Master Stations, Communication System and Control Centre Facilities
** Distribution Automation System (DAS) Project is an integrated remote monitoring & automated control system for 11 KV distribution network in Bengaluru Metropolitan area.

TOOLS  :
BASIC - MS WORD, EXCEL & POWER POINT.

TECHNICAL SKILLS  :
** Basic Knowledge of AutoCAD.
** Basic Knowledge on Electrical components
** Knowledge of RTU trouble shooting.

PERSONAL  :
Date of birth  : 30 JULY 1993
Marital Status  : Single
Languages Known  : Kannada, Hindi, and English.

DECLARATION  :
I hereby solemnly assure that all the statements made above are true and correct to the best of my knowledge and belief.

DATE  :
PLACE  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.