Welcome Guest

Site / Construction >> Planning Engineer / Manager 
Production Planning Control Resume Sample, Experience : 3 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Production Planning Control
Job related skills / software:Schedule to vendor as per MRP as well as BOM preparation and updation in system, Procurement of material as per requirement, Planning and controlling the material to achieve daily, weakly and monthly production target in co coordinating with vender’s QC, STORE, PPC department.
Category:Site / Construction
Sub Category:Planning Engineer / Manager
Years of Experience:3 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):30,000 to 40,000
Highest Qualification attained:Diploma
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

CAREER OBJECTIVE :
To become a major pillar in my interested field Procurement, Logistics& materials As well as Planning, Quality control, & Supply chain management so as to prepare for management responsibilities through self development, personal growth & enhancement of managerial abilities

EXPERIENCE :
Organization :
Department : Production Planning and Control
Designation : PPC Engineer
Duration : May-2010 to till date.

PROCUREMENT EXPERIENCE :
Schedule to vendor as per MRP as well as BOM preparation and updation in system.
Procurement of material as per requirement
Planning and controlling the material to achive daily, weakly and monthly production target in co coordinating with vender’s QC,STORE ,PPC department
Ensuring availability of material of material on multimodal assembly line in coordinating with vender logistic and store
Planning for long lead time and critical component to avoid shortage on assembly line
Coordinating in between vender and SPD to fulfill the spare market demand without affecting the daily line requirement
Planning the material flow and production at OLC vender
Preparation of report for material receipt against schedule to vender to take decision so as to avoid loss
Ensuring availability of material in Export Department so that veh will run out as per plan and country model requirement
Development of new component as per new drawing or modification with horizontal deployments of “Q” parameter to achive right at first time
New component trial planning and implementation with cutoff declaration of old model in Export and Domestic production

QUALITY CONTROL :
Coordinating in between QC Department of vender in case of Quality issue
Daily QSR monitoring to reduce reoccurrence of defect at final assly line with technical support vender
Sustain monitoring and horizontal deployment of action taken in another model so as to avoid the reputation of complaint
Carrying out root cause analysis at vender end and action on it
Monitoring corrective and preventive action taken for defect report in field and vehicle assly line
Implementation of KAIZEN at vender end and suggestion of QMS to achive company given ‘Q’ target
Preparation of SIR for new development component
To work closely with other functional requisition to resolve issue and recommend corrective action

LOGISTICS EXPERIENCE :
Monitoring a control on physical stock to avoid production loss


.
Monitoring physical stock of A, B & C class items with SAP system stock.
Follow up shipments with suppliers for parts delivery as per requirement
Establishment material handling system at vender end so as to avoid damage to component and easy flow at vehicle assembly line
Coordinating in between vender and their logistic provider to ensure timely supply of components at vehicle assembly line
Working as PIV co-ordinater, to achieve yearly targets of Perpetual Inventory Verification.

OTHER ACTIVITY :
To conduct product and process audit at vender end
To implement TPM methodology at vender end as per BAL-C requirement
To promote vender to participate in KAIZEN competition
To improve P, Q, C, D, M over the time period consistency at vender end
Responsibility of office TPM and 5S in elepro group
To reduce cost by KAIZEN implementations at vender and BAL-C
To sign Inspection and DR document with vender

MAJOR JOB ACHIEVEMENTS :
Implemented milk-route supplies for local suppliers to reduce transportation cost & to reduce WIP inventory
Heavy reduction in non moving components by finding alternate uses and avoiding.
Achievement of corporate objective of 0.25 days inventory target of A class items, 0.4 days for B class items & below one day for C class items.

KEY SKILLS :
Systematic working approach
Try to keep good co-ordination with vendors for uninterrupted flow of material to achieve Production target
Quick response to customer complaints
Works and priority management.

SOFTWARE PROFICIENCY : -
MS-Office (Windows)
ERP – SAP (MM/PP)

ACADEMIC QUALIFICATIONS :
Diploma in Mechanical Engineering fromM.S.B.T.E, Mumbai in 2010 with first class
HSC with second class from Pune Board 2007
SSC with first class from Pune Board 2005

ADDITIONAL TRAINING & SEMINARS ATTENDED :
Total productive maintenance (TPM)
Problem finding & solving technique.
5-S
Presentation & communication skill.

PERSONAL INFORMATION :
Marital Status  :Indian
Nationality  :Indian
Residence Address  :
Hobbies  :Listening Music, Playing Cricket, Reading News paper
Languages  :Marathi, Hindi, English
Current CTC  :3.6 Lac/Annum
Expected CTC  :Negotiable

I hereby declare that the information furnished above is true to the best of my knowledge belief

Date :
Place : Pune

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.