Welcome Guest

Design Engineering >> Structural Design Engineer /Tekla Steel Detailer 
Structural Engineer Resume Sample, Experience : 9 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Structural Engineer
Job related skills / software:Carried out Pushover analysis for critical platforms in Umm Shaif and Zakum Fields of ADNOC comprising WHTs, Complexes, Bridge Support Towers and Flare tower to establish robust structural integrity.
Category:Design Engineering
Sub Category:Structural Design Engineer /Tekla Steel Detailer
Years of Experience:9 years
State:Telangana
Gender:Female
Salary Expected per Month(Rs):70,000 to 80,000
Highest Qualification attained:M.E. / ME : Master of Engineering
Major / Specialization:Structural
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Sowmya Vemparala
Structural Engineer-I

Summary :
Six plus years of experience in structural engineering related to offshore and onshore oil and gas sector. My expertise includes analysis and design of fixed offshore structures, Equipment Skids and pipe supporting structures. Hands-on experience in different in-service and pre-service analyses and brown field modification jobs of fixed offshore structures using SACS and STAADPRO. Basic knowledge in foundation design using STAAD Foundation. Good Knowledge on various codes like API, AISC, Nobel Denton, ISO, DNV, NORSOK and Australian codes.,

Experience :
Project – Replacement of UZ Pipielines-ADNOC OFFSHORE
The intent of the project is to check the structural integrity of the existing platform for the new modifications in Zakum offshore fields.

Following activities are performed as part of the project  :
** Carried out global Inplace analysis for the new modification for Zakum (ZW-100ZD) platform.
** Performed pushover analysis using SACS latest version 11.1 and API RP 2A.
** Giving inputs and checking the new modification drawings.

Structural Engineer-I, WorleyParsons, Hyderabad, India :
Project – Pushover Analysis for 33 Nos Critical Platforms-ADNOC OFFSHORE
The intent of the project is to check technical integrity and reliability of existing platforms in Zakum and Umm Shaif fields.

Following activities are performed as part of the project  :
** Carried out Pushover analysis for critical platforms in Umm Shaif and Zakum Fields of ADNOC comprising WHTs, Complexes, Bridge Support Towers and Flare tower to establish robust structural integrity.
** Performed pushover analysis using SACS latest version 11.1 and API RP 2A.
** Pile load carrying capacity in extreme environment is reassessed.

Structural Engineer-I, WorleyParsons, Hyderabad, India :
Project– Minor Engineering Services – Pushover Analysis for 34 Nos. Critical Platforms in Umm Shaiff and Zakum fields, ADMA
The intent of the project is to check technical integrity and reliability of existing platforms in Zakum and Umm Shaif fields.

Following activities are performed as part of the project  :
** Carried out Pushover analysis for critical platforms in Umm Shaif and Zakum Fields of ADNOC comprising WHTs, Complexes, Bridge Support Towers and Flare tower to establish robust structural integrity.
** Performed pushover analysis using SACS latest version 11.1 and API RP 2A.
** Pile load carrying capacity in extreme environment is reassessed.

Structural Engineer-I, Woodside Energy Limited, Perth, Australia :
Project – External Corrosion & Structural refurbishments -Portfolio Projects (Detailed Engineering)
The intent of the KLE EC Projects is to sustain technical integrity and reliability of piping, vessels and support structures subject to external corrosion, ensuring safe and reliable operation of the KGP until it reaches its end of facility life.

Following activities are performed as part of the project  :
** Population of structural defect register (SDR)
** Technical assessment and selection of refurbishment details. (Each photograph from inspection report to be opened, reviewed and notes made to support assessment)
** Population of Refurbishment Scope Sheet (RSS) for defect areas where refurbishment is proposed in accordance with structural design brief
** Review of design drawings.

Structural Engineer-I, Unison Engineering and Construction Pvt. Ltd. India
Project – ONGC life Extension of Wellhead platforms phase-3, replacement of topside of 10 platforms with new deck structures (Pre-Bid)
The project was executed for define stage for ONGC 10 wellhead platforms.

Following activities are performed as part of the project  :
** Preparation of Weight Control report for Lift, Transportation and Inplace analysis
** Structural Engineer-I, British Petroleum Trinidad & Tobago LLC (BPTT)
** Project – Detail Engineering of Trinidad Region Onshore Compression (TROC)
** The project involves design of equipment skids, pipe supports, foundations, onshore lift of pipes at Beach field Facility.

Following activities are performed as part of the project  :
** Design of new pipe supporting structures with bolted/welded connections resting on concrete foundations
** Analysis and Design of Drain crossing skid, Coriolis Metering skid and Control Valve Skid using STAAD
** Analysis and Design of concrete mat foundation for equipment like Gas Generator, Condensate Pumps, Transformer, multiple skids and pipe supports using STAAD Foundation software

Structural Engineer-I, British Petroleum Trinidad & Tobago LLC (BPTT)
Project – Detail Engineering Of Mahogany Bravo Bypass Project
The intent of the Project is to maximize off-site fabrication of structural steel supports in order to eliminate field welding, and to minimize hot-work in hazardous area by using bolted connections.

Followingactivities are performed as part of the project  :
** Design of new pipe supporting structures with bolted/welded connections resting on different Deck levels of Mahogany Bravo platform
** Checked the adequacy of existing pipe supporting structures for loads from revised pipe stress analysis
** Performed strength checks and carried out local strengthening of Deck members, where required

Assistant Structural Engineer, ADMA-OPCO
Project – Quantitative Structural Assessment of Structures in Zakum and UmmShaif fields(package 4)(Brownfield Life Extension studies)
Abu Dhabi Marine Operating Company (ADMA-OPCO) aims to establish robust Structural Integrity Management System (SIMS) for ADMA OPCO fleet of structures in Zakum and Umm Shaif fields.

Following activities are performed as part of the project  :
** Jacket Pushover analysis for WHT’s US-143, US-117, US-180, US-217, USSC Flare 1, ZWSC Flare A3 and ZWSC Flare A4.
** Weight control report for Wellhead platforms and super complex bridges in US, ZK, USSC , ZCSC & ZWSC fields
** Jacket Cathodic protection report for WHT’s US-120, US-143 US-177, US-217, ZWSC Flare-1 and ZWSC Flare-2

Assistant Structural Engineer, SAUDI ARABIAN OIL COMPANY
** Project – Detail Engineering for PDHMS for Various Electrified and Non-Electrified offshore Producing Facilities.
** Saudi Aramco Oil Company plans to install permanent Down hole Monitoring Systems for 10 Wellhead platforms.

Following activities are performed as part of the project  :
** Preparation of SACS model for deck extension to accommodate solar panel and associated equipment’s for SFNY 184/189 and SFNY 194/199
** Reviewed penetrations and tray support detailing drawings

Assistant Structural Engineer, ADMA-OPCO
** Project – Quantitative Structural Assessment of Structures in Zakum and UmmShaif fields(package 1)(Brownfield Life Extension studies)
** Abu Dhabi Marine Operating Company (ADMA-OPCO) aims to establish robust Structural Integrity Management System (SIMS) for ADMA OPCO fleet of structures in Zakum and Umm Shaif fields.

Following activities are performed as part of the project  :
** Jacket Pushoveranalysis for WHT’s ZK-36, UK-36, ZK-44, ZK-168, ZK-17 using SACS
** Jacket Cathodic protection reportfor WHT’s ZK-17, ZK-126.5, ZK-168, ZK-276 and US-05

Assistant Structural Engineer, ADMA-OPCO,Abu Dhabi-UAE
** Project – Umm Shaif-OIL networking Expansion project(FEED)
** Abu Dhabi Marine Operating Company (ADMA-OPCO) aims to sustain Umm Shaif Field annual average production of 275 MBD.


To achieve this, new risers, piping and equipment needs replacement.

Following activities are performed as part of the project  :
** Jacket Pushover analysis for US-23, US-265, US11-11A, US-23A and US-35A using Collapse module of SACS.
** Lift analysis for US -153, US-169 using SACS

Assistant Structural Engineer, Oil and Natural Gas Corporation of India (ONGC)
** Project – Pre Bid Engineering - Bassein Development Project for Wellhead Platform, Living Quarter Platform and two interconnecting bridges
** The intent of the project is to assist for Pre Bid Engineering for the development of Wellhead platform, living quarters and two interconnecting bridges of Bassein field.

Following activities are performed as part of the project  :
** Inplace Analysis for proposed wellhead platform and Living Quarter Platform.
** Lift Analysis for proposed wellhead platform and Living Quarter Platform.
** Weight Control Report of wellhead platform and Living Quarter Platform

Graduate Engineer Trainee, British Gas (BG)
** Project – Operate Phase - BG STA Pushover
** Performed pushover analysis for BGSTA platform using collapse module of SACS.

Following activities are performed as part of the project  :
** Performed pushover analysis for BGSTA platform
** Interpretation of the results & Prepared Report

Graduate Engineer Trainee, Brunei Shell Petroleum
** Project – Operate Phase - West PRP2 Phase 2& 3 - Front End Support
** Brunei shell petroleum aim in restoring the integrity of pipeline and henceforth checking the structural integrity of the platforms connecting these pipelines.

Following activities are performed as part of the project  :
** Performed Inplace Analysis for Riser platform (FAPP01, AMRJ01).
** Report Preparation

Graduate Engineer Trainee, ADMA-OPCO-Abu Dhabi-UAE
** Project – Define phase - Structural Assessment of 28 WHT as part of Zakum Oil Pipelines Replacement Project, Phase-1
** The intent of the project is to check the structural integrity of 28 wellhead platform.as part of Zakum oil pipelines replacement.

Following activities are performed as part of the project  :
** Jacket and deck Inplace analyses
** Pushover/collapse analysis
** Weight Control Report
** Structural integrity of the platform is re-assessed
** Adequacy of the Piles are re-assessed

Graduate Engineer Trainee, BG India :
** Project – Define phase PANNA-Structural Assessment Study for Requalification and Life Extension
** The intent of the project is to check the structural integrity of panna platforms for requalification and Life extension.

Following activities are performed as part of the project  :
** Global Inplace Analysis of Flare Platform (PFP) after modelling from As-Built drawing
** Seismic Analysis of these platforms by Response Spectrum Method
** Weight Control Report
** Structural integrity of the platform is re-assessed

Education :
** 2010 - 2011 M.Tech Structures from BITS PILANI, Rajasthan, India, 2011
** 2005 - 2009 B. Tech in Civil Engineering from V N R Vignana Jyothi Institute of Engineering and technology, AP, India,
** 2009 Specific Technical Expertise/ Specialist Courses
** 2008 Participated in Quiz Conducted by Ultra Tech Cement .Stood 1st in regional round and 2nd in state level

Date  :
Place  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.