Name of the Candidate:Rupesh Kumar
Name of the Post Applied:Civil Surveyor
Job related skills / software:Caring out the survey for checking for installation of Machineries, before and after erection prior to giving clearance for base grouting, Liaising with Contractor and Consultant for Constant development of Techniques for construction and managing the construction of plant internal roads, drains and township area.
Category:Site / Construction
Sub Category:Construction / Civil Engineer
Years of Experience:19 years
State:Andhra Pradesh
Gender:Male
Salary Expected per Month(Rs):60,000 to 70,000
Highest Qualification attained:Diploma
Major / Specialization:Civil
Email Id:rupesh33in AT yahoo.co.in
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

RUPESH KUMAR.K
Mobile  :09178462802
E-Mail  : rupesh33in AT yahoo.co.in
CONSTRUCTION & SURVEY SPECIALIST

SNAPSHOT  :
Results-driven construction and Survey Manager with over 19 years of expertise in Quantity Surveying, and Team Management.
Presently associated with GMR as Assistant Manager.
History of concurrently directing multiple projects to successful completion through effective management and team collaboration.
Continually strives to produce high quality projects while adhering to a tight schedule and budget.
Managed and worked with complex, competitive and challenging projects and implemented them successfully with efficiency and quality.
A keen learner with ability to work under pressure and meet deadlines.
Core competencies include;
Quantity Surveying Team Management client Relations

EMPLOYMENT PROFILE  :
Since 2009 at GMR Projects as Assistant Manager
1995 to 2009at SECON Private Limited as Team Leader
1994 to 1995 at S.R.N.C (Road Construction) as Site Engineer

Key Deliverables  :
Assisting the top management for end-to-end execution all infrastructure developments for the project requirements including the residential colony of 4000 Employees with all ultra modern amenities.
Detailed project planning, to ensure execution of the projects within time and budgetary parameters.
Handling technical & commercial offers/ proposals along with handling tender/ contract/ billing related formalities & documentation in material procurement for client supply.
Monitoring the progress of work in terms of cost, resource deployment, and time over runs and quality compliance.
Anchoring and co-coordinating on-site construction activities to ensure smooth work progress.
Liaising with Government Departments and ensuring compliance with the applicable statutory requirements, clearances and licenses.
Co-ordinating with Architects, Engineers, Contractors, to ensure smooth execution of projects.

Instrument Handled  :
Theodalite  :The Theodalite wild instruments wild T2, T3, T16, and Topcon.
Total Station  :Leica- 703,406, Trimble3603, Trimble 5601,Topcon
Auto Levels  :Nak 0
Technical Qualification  :
Window & MS office Excel & Autoploter, AutoCAD (2013), tarramodel-10.5, auto lisp, Cad tools, Map source, Prolink, MS Project

PROJECTS HANDLED  :
Project Title  : Kamalanga Thermal Power Plant (4x350mw), Angul, Orissa
Duration  : Since Sep’09
Contractor  :SEPCO (Chaina)
Cost 6000 CR
Responsibilities  :
Taking care of all survey and setting out activities as a Survey Manager.
Recording the all OGL data, collecting relevant site data for design and site execution changes.
As per site data preparing the as built drawing and cross sections.fixing and checking the layout alignment of all the foundations both, building and equipment foundation to ensure the current location of anchor bolt, and embedded parts with reference to G.A/ Shuttering.
Fixing alignment of all structures (concrete/steel) including co-ordinates and levels with permanent bench mark Preparation of survey scheme for all the foundations after concreting so as to record the deviations with reference those in the drawing, prior to handing over the foundations for structural /equipment erection. Preparation of as built survey schemes for all structures both concrete and steel.
Caring out the survey for checking for installation of Machineries, before and after erection prior to giving clearance for base grouting.
Liaising with Contractor and Consultant for Constant development of Techniques for construction and managing the construction of plant internal roads, drains and township area.
Calculating the estimation and preparation of quintiles for supporting other departments through auto cad for accuracy.

Project Title  : KGGNL (Krishna-Godavari Gas Network Limited)
Duration  : Jun’06-Sep’09
Employer  : SECON Private Limited
Responsibilities  :
The features present in the database is captured using Satellite Image (IKONOS) which was taken about 2 to 3 years back, hence the data updated the land base survey. The changes in the Land base like construction of new buildings, new roads, split, combine, light poles, land mark, median, pedestrian crossing etc. Updated in Auto CAD drawings. It is in the process of detailed State – wide GIS infrastructure to support various City Gas pipeline projects.
Getting NOC from the various authorities for laying pipeline across statutory bodies.
A total of 2 years’ experience in survey and setting out works in2000 KM City Gas network pipeline route fixing on the Survey of Image (IKONOS) and same was transferred on to ground by Reconnaissance survey.

Project Title  :G.S.P.C (Gujarat State Petroleum Corporation)
Duration  : May’05-Jun’06
Employer  : SECON Private Limited
Description  :A total of 1 year experience in survey and setting out works in1800 KM Cross country pipeline route fixing on the Survey of India maps and same was transferred on to ground by Reconnaissance survey for transportation of produced hydrocarbons from offshore to onshore Gas Processing Plant (GPP), Metering station located at Dariyalatippa, Yanam.


Construction of integrated Gas Processing Plant covering buildings, units like Slug catcher, H2S Removal plant, Hydrocarbon Dew pointing, Gas metering station, Elevated Flare Tower, Hot oil heter plant Admin building, Township
Responsibilities  :
Preparing cross country pipeline, root maps, cadastral maps, topo maps for laying of pipe line rooting, liaising with concerned government department, for obtaining crossing permissions. Along the pipeline specialization in the field of surveying, land acquisition and liaising with various authorities/departments for clearances.
Designing as built survey schemes for after lying of pipeline.
Preparing earthwork quantities along cross country pipeline.
Operating total station instrument for fixing the pipeline route on ground.
Finalizing land ownership details. Getting NOC from the various authorities for laying pipeline across statutory bodies. Coordinating with client and management.
Revalidating the surveyed pipeline route as per the client’s approval.

Client Indira Gandhi International Airport at Shamshabad  :
Duration  : Apr’04-May’05
Employer  : SECON Private Limited
Description  :A total of 1 years experience in survey and setting out works in civil construction of integrated International Airport covering buildings, units like Runways, taxiway, utility pipeline, Water storage tank, Water treatment plant, Township, Main receiving sub station apart from ancillary buildings pump house, Under ground sewerage system, High raised buildings like P.T .B Buildings ATC towers., etc.
Responsibilities  :
Associated with surveying setting out for infrastructures. The field activities include, surveying preparation of site layouts of. Runways, taxiway, utility pipeline, Water storage tank, Water treatment plant, Township, Main receiving sub station apart from ancillary buildings pump house
Marking as per drawing, fixing of co-ordinates & permanent bench and Setting out of High elevated buildings,
Drawings and preparation of Earth work Quantity calculation of site Grading, Road, Drains, Runway, Taxiway embankments, Execution of work maintaining the quality and managing work force effectively. Coordination with client and contractors
Marking as per drawing, fixing of co-ordinates & permanent bench and Setting out of buildings,
And constructing the Internal roads like earthwork, subgrade, gsb, wmm & bs, hume pipe culverts and utility pipes.

Client S.J.K Steel Plant, Tadipatri (A.P)  :
Duration  :Jul’95-Jan’04
Employer  : SECON Private Limited
Description  : A total of 9years experience in survey and setting out works in civil, Structural construction of integrated steel plant covering buildings, units like Raw Material Handing System, Wagon Tipple, Raw water Treatment plant , Reservoir, Flash Mixer, overhead Tanks, utility pipeline, Blast Furnace unit Basic Oxygen Furnace &C.C.P apart from ancillary buildings sub stations pump house, Gas Cleaning system, Boiler plant, Blower House, Cast House, Drains, roads, Railway line and construction of Residence Building
Responsibilities  :
Associated with surveying setting out for industrial works and infrastructures. The field activities include, surveying preparation of site layouts. Checking the lay out of concrete structures to ensure current line and levels prior to giving clearance for concreting.
Checking the layout alignment of all the foundations both, building and equipment foundation to ensure the current location of anchor bolt, and embedded parts with reference to G.A/Shuttering
Fixing alignment of all structures (concrete/steel) including co-ordinates and levels with permanent bench mark
Preparation of survey scheme for all the foundations after concreting so as to record the deviations with reference those in the drawing, prior to handing over the foundations for structural /equipment erection.
Preparation of as built survey schemes for all structures both concrete and steel.
Caring out the survey for checking for installation of Machineries, before and after erection prior to giving clearance for base grouting.
Drawings and preparation of Earth work Quantity calculation of Road, Drains, Railway embankments, site leveling, Execution of work maintaining the quality and managing work force effectively.

EDUCATION  :
Diploma in Civil Engineering in 1994.

TECHNICAL TRAININGS  :
Safety in Construction
Time Management
Improvement of Productivity
Self Development Programme
Stress and Strain Management
Behavioral Management

PERSONAL DETAILS  :
Date of Birth  : 21st March 1973
Language Known  : English, Hindi and Telugu
Address  :Pradhan Kuteer, NH42, Near Hotal Durga, Angul-759122, Orissa

REFERENCES  : Available on Request

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.