Welcome Guest

Site / Construction >> Maintenance Engineer / Manager 
Mechanical Maintenance Engineer Resume Sample, Experience : 7 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Mechanical Maintenance Engineer
Job related skills / software:To monitor preventive maintenance work of above lines, Maintaining and monitoring of AirOil System for W/R and BUR Bearings of United Make mill, Working with hydraulic systems , servo systems, piston pumps, vane, gear pumps, Pneumatic systems, Different types of hydraulic & pneumatic. Valves
Category:Site / Construction
Sub Category:Maintenance Engineer / Manager
Years of Experience:7 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

OBJECTIVE  :
Seeking a quality of environment where any knowledge and experience can be shared and enriched. Looking for the opportunity where I can apply my excellent technical knowledge of maintenance engineering and computer thereby help to improve business of the company.

EXPERIENCE  :
TOTAL EXPERIENCE – 7 YEARS
1) FOUR YEARS EXPERIENCE OF YEARS IN COLD ROLLING MILL.
2) THREE YEARS EXPERIENCE IN FABRICATION & ERECTION

COMPANY DETAILS  :
Lloyds steel industries has a plant in Wardha for flat products .It has H.R.M. PLANT with a capacity of 0.70 million tones and a CRM PLANT along with Galvanizing unit of the capacity of 0.25 m. t. per annum. In .We have ONE SMS + Two Slab Casters + Rolling mill. In SMS we have TWO EAF of 60 tons each +TWO LRF and two Slab Casters equipped with AMLC. 160 MW coal based power plant for power needs.
SAP’s modules such as MM, PP, SD and FI have already been implemented in the year of 2000. With the success of SAP, they stepped into implementation of HR & PM Modules, and the upgradation of previously Implemented modules to cope up with the new facilities. The project work started with blue print preparation in the year of 2007 and is going to be ‘Go Live’ in the month of Feb, 2008.

FIELD DETAILS  : COLD ROLLING MILLMECHANICAL MAINTENANCE
1) From May2006 to till date
Working with Lloyds Steel Industries Ltd. Wardha, as SR.ENGINEER (Mech. Maintenance).
4 HI COLD ROLLING MILL(HITACHI & UNITED MAKE),CR SLITTER

Job Responsibility :
To monitor preventive maintenance work of above lines.
Maintaining and monitoring of AirOil System for W/R and BUR Bearings of United Make mill.
Working with hydraulic systems , servo systems, piston pumps, vane, gear pumps
Pneumatic systems, Different types of hydraulic & pneumatic. Valves

Achievement  :
Controlled consumption of hydraulic oil in bending system, from approx. 10 barrel – approx. to 1 ½ barrel for a month by modifying bending cylinder
Overhauling O/S top AGC Cylinder in 16 hrs with four technicians
Mill delay below 2 % from last 4 months with teammates.
Improved C.R. Slitter efficiency by modifying Trimmer head width setting arrangement and modifying scrap winder drive arrangement by 40 min per shift

B) Also worked in :
HRCTL(flee rizzato,Itely),
hrctl ( WuxibonoChina)
Pickling (Multiform)

Achievement  :
Improved pickling quality by changing pump size, modifying water header size Providing heat Exchanger in line to make water hot in Rinse section.
Provided a extra capacity blower in air drier.
Bring down the delay below 2% of Pickling line.
Various Modifications done at HRCTL (Wuxi bono,china)

Job Responsibility :
Preparing Preventive Maintenance Plan.
Preparing Shut Down Maintenance Plan
Spare management and to control within budget
Monitoring and maintaining inhouse spare.
Analysis of repeated breakdown & preparing Root cause analysis report.
Preparing ISO Documents.
Working with hydraulic systems , servo systems, piston pumps, vane, gear pumps
Pneumatic systems, Different types of hydraulic & pneumatic.


Valves.
Working with water and acid pumps.
Working with Aquatherm ,model Ath20 ,make – Thermax.
Handelled project independently
Handled project of Erection and commissioning of Hot rolled cut to length line
Make  : Wuxi – Bono china ,
Capacity  : 25 mm thick , 42 kgf/cm2 , 20 mtr length

FIELD DETAILS  :
SAP R/3 PM MODULE IMPLEMENTATION
Job Description  : Structuring of Technical Objects: Functional Location, Equipment, Equipment BOM, Material, Material BOM, Main Work Center, Performing Work Center, Class & Characteristics, Measuring Point & Counter and Reporting
Maintenance Processing  : Notification Types – Maintenance Request, Malfunction Report, Activity Report, Shut Down Report and Check List Entry, Order Types – Internal Processing, External Processing, Preventive Maintenance, SubContracting Order, Confirmation, Measuring Document and Reporting.
Preventive Maintenance  : Task Lists, Single Cycle Plan based on Time, Single Cycle Plan based on Counter, Strategy Plan, MultiCounter Plan, Scheduling Processing & Monitoring and Reporting.
Noticeable Configuration  : User Statuses for Equipment & Special Notification Type, DMSDocument Type to insert all drawings into SAP, Notification Type to maintain daily inspection check lists (Relating class & characteristics with notification), Made facility to maintain shift in notification.

2) July 2003 to may 2006 :
Worked with Awachat industries ltd.(vendor for TATA Motors , Manhindra & Mahindra ) Engaged in production of hydraulic trailers, industrial pickups,
Job Responsibility  :
I was looking after the following areas  :
In charge of fabrication and assembly yard.
EOT Cranes.
Manpower handling; spare management

QALIFICATION  :
Degree College/Institution Percentage Year
M.B.A.(final semester) I.G.N.O.U. DELHI
PGDIM I.G.N.O.U. DELHI 70 2009
B.E.(Mech.) NAGPUR UNIVERSITY 71 2003
D.M.E.(Mech.) GOVT.POLY.ARVI,B.T.E.BOMBAY 74.86 2000
S.S.C. N.E.H.S. WARDHA 70 1997

PERSONAL INFORMATION  :
Marital Status : Unmarried
Languages : Known English, Hindi, Marathi
Current Location  :Wardha, Maharashtra
Nationality Indian

DATE  :
PLACE  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.