Job related skills / software:Co-ordination with client & consultant, preparing DPR, and protocols for fabriction erection & commissioning, Preparing material requirements as per fabrication plan, Preparation of crane schedule for proper utilization of equipments.
Category:Site / Construction
Sub Category:Fabrication Engineer
Years of Experience:>20 years
State:Andhra Pradesh
Gender:Male
Salary Expected per Month(Rs):70,000 to 80,000
Highest Qualification attained:I.T.I. / ITI : Industrial training institute
Major / Specialization:Mechanical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

OBJECTIVE  :
Looking forward to working in a professional organization, where all my capabilities are utilized and that offers professional growth while being resourceful, innovative and explore myself fully and realize my potential.

EDUCATION  :
SSC Passed in 1985.
ITI discontinued in 1986.(After 1year)

EXPERIENCE  :
Worked as a Fitter, pipe line work, cable line work, on Fabrication & on Erection.
Worked as a Fabrication & Erection Supervisor.
And also some own works as a Contractor.
Overall 29 years of experience in the relevant field (Cement Plants ,Power Plants, Sugar Plants, ONGC )

Work Responsibilities  :
Erection of TG Buildings, Bunker,storage shed etc,..
Preparation of fabrication, erection schedule to meet the target within the planned time frame.
Co-ordination with client & consultant, preparing DPR, and protocols for fabriction erection & commissioning.
Preparing material requirements as per fabrication plan.
Preparation of crane schedule for proper utilization of equipments.
Manpower handling and stage inspection of structures at site.
Certifying the sub-contractors bills and coordinating for preparing the client bills.
Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively.
*Erection & commissioning of Coal Handling Plant & equipments.
Preparation of fabrication, erection & commissioning schedule to meet the target within the planned time frame.
Co-ordination with client & consultant, preparing DPR, and protocols for fabiction erection & commissioning.
Preparation of monthly erection plan.
Preparation of crane schedule for proper utilization of equipments.
Manpower handling and stage inspection of structures at site.
Co-ordination with contractors & clients during executing the job as per Drawing.
Preparations of schedule for achi


eving targets on time.
Maintain Safety activities at site.
A team player, good problem solver, and always ready to take chalanges.
Welder qualification and record.

Working Experience  :
Carrier stared at Raasi Cements(HAPB & Co) In second plant work, Roop way, Tower Fabrication & Conveyors Erection work, goods shed work.
Worked in Vishnu Cement packing plant in shed work, packers, Conveyors,Fitter(HAPB & Co)
Worked in Riwa Cements,Coal Mill , ducting work, structural work, erection and fitter(HAPB & Co).
Worked in Banjara Cements at Tadipathri on Fabrication of total plant.
Worked in Sri Vani sugar plant at punganuru in krin Garage, Mill house work(Sub Contract work(HAPB & Co)).
Own contract 100% X-ray work power plants.
RVK Power Plant work(Avasaral Power Project Ltd.Konkepudi)-Sub Contract ONGC Natural gas pipe line work.
SIBA Power Plant(Group of penna cement)ONGC natural gas pipe line work and Engine side AC & DC water limits.
Worked as a Site Incharge in KCP Sugar Plant(Total work Completed with commission of Sri Venkateswara Engineering works).
Worked as a Contractor(For complete project) in Sri Rama Ceramics Plant on ONGC pipe line(My own Contract).
Worked as supervisor(HAPB & Co) in Parashakti Cement on Preheater erection work.
Worked as supervisor(HAPB & Co) in Suwarna Cement on Preheater erection work.
Worked as supervisor(HAPB & Co) in Wadi ACC Cement on Preheater erection work.
Worked as a Senior supervisor for total plant work (MBBAVA)in MVEC Engineering Works in Nagarajuna Cements at Matampalli .
Worked as supervisor(HAPB & Co) in Nagarjuna Cement on Ball Mill erection work.
Worked on total conveyor power plant work in Madhucon Power Plant(Nellore) as a Tefro (Supervisor)contractor.
Sugar Plant work in Asshaca Sugar Plant in Orissa and Supervising of Gas plant Erection work .

Declaration :
I hereby confirm that the information furnished above is correct to the best of my knowledge.

Date  : ___________
Place  : ___________

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.