OBJECTIVE :
Looking forward to working in a professional organization, where all my capabilities are utilized and that offers professional growth while being resourceful, innovative and explore myself fully and realize my potential.
EDUCATION :
SSC Passed in 1985.
ITI discontinued in 1986.(After 1year)
EXPERIENCE :
Worked as a Fitter, pipe line work, cable line work, on Fabrication & on Erection.
Worked as a Fabrication & Erection Supervisor.
And also some own works as a Contractor.
Overall 29 years of experience in the relevant field (Cement Plants ,Power Plants, Sugar Plants, ONGC )
Work Responsibilities :
Erection of TG Buildings, Bunker,storage shed etc,..
Preparation of fabrication, erection schedule to meet the target within the planned time frame.
Co-ordination with client & consultant, preparing DPR, and protocols for fabriction erection & commissioning.
Preparing material requirements as per fabrication plan.
Preparation of crane schedule for proper utilization of equipments.
Manpower handling and stage inspection of structures at site.
Certifying the sub-contractors bills and coordinating for preparing the client bills.
Responsible for the implementation of safety standards at the project site by ensuring that all relevant norms are employed effectively.
*Erection & commissioning of Coal Handling Plant & equipments.
Preparation of fabrication, erection & commissioning schedule to meet the target within the planned time frame.
Co-ordination with client & consultant, preparing DPR, and protocols for fabiction erection & commissioning.
Preparation of monthly erection plan.
Preparation of crane schedule for proper utilization of equipments.
Manpower handling and stage inspection of structures at site.
Co-ordination with contractors & clients during executing the job as per Drawing.
Preparations of schedule for achi
eving targets on time.
Maintain Safety activities at site.
A team player, good problem solver, and always ready to take chalanges.
Welder qualification and record.
Working Experience :
Carrier stared at Raasi Cements(HAPB & Co) In second plant work, Roop way, Tower Fabrication & Conveyors Erection work, goods shed work.
Worked in Vishnu Cement packing plant in shed work, packers, Conveyors,Fitter(HAPB & Co)
Worked in Riwa Cements,Coal Mill , ducting work, structural work, erection and fitter(HAPB & Co).
Worked in Banjara Cements at Tadipathri on Fabrication of total plant.
Worked in Sri Vani sugar plant at punganuru in krin Garage, Mill house work(Sub Contract work(HAPB & Co)).
Own contract 100% X-ray work power plants.
RVK Power Plant work(Avasaral Power Project Ltd.Konkepudi)-Sub Contract ONGC Natural gas pipe line work.
SIBA Power Plant(Group of penna cement)ONGC natural gas pipe line work and Engine side AC & DC water limits.
Worked as a Site Incharge in KCP Sugar Plant(Total work Completed with commission of Sri Venkateswara Engineering works).
Worked as a Contractor(For complete project) in Sri Rama Ceramics Plant on ONGC pipe line(My own Contract).
Worked as supervisor(HAPB & Co) in Parashakti Cement on Preheater erection work.
Worked as supervisor(HAPB & Co) in Suwarna Cement on Preheater erection work.
Worked as supervisor(HAPB & Co) in Wadi ACC Cement on Preheater erection work.
Worked as a Senior supervisor for total plant work (MBBAVA)in MVEC Engineering Works in Nagarajuna Cements at Matampalli .
Worked as supervisor(HAPB & Co) in Nagarjuna Cement on Ball Mill erection work.
Worked on total conveyor power plant work in Madhucon Power Plant(Nellore) as a Tefro (Supervisor)contractor.
Sugar Plant work in Asshaca Sugar Plant in Orissa and Supervising of Gas plant Erection work .
Declaration :
I hereby confirm that the information furnished above is correct to the best of my knowledge.
Date : ___________
Place : ___________