Curriculum-Vitae
Post Applied For : PDS PIPING DESIGNER
Technical Qualification : Successfully completed I.T.I.E Trade of Mechanical
Draughtsman
Computer Literacy : PDS (3D MODELING)
Autoplant (3D MODELING)
Microstation J,
AutoCAD 2000i- 2010, (2D Drafting)
MS Office-96/ 98/2007, MS Word, MS Excel,
PIPEWAYS
Isometric Extraction PDS
GAD Extraction PDS
NEVISWORK PDS REVIEW MODEL
SPR
Career Summary : Having 11 years of Experience in Onshore projects in the field of Oil and Gas, Petrochemicals and Refinery.
Responsibilities Include : Developing Plot Plan, Designing of Piping G.A.,
Isometrics from Plan, Equipment modeling, piping modeling,
Support modeling, Isometric Extraction.
Interconnecting.
Career Path.
Career Path.
Present Organization : Presently Working with TECHNIP DOHA QATAR
‘SR.DESIGNER PIPING’ On OFF shore PMP PROJECT on PDS package from 19 NOV 2011
Previous Organization : Worked with AARYA SYSTEMS FOR
AKER SOLUTATIONS MUMBAI
‘DESIGNER PDS’ On shore TURKMENGAS SOUTH
YOLOTEN GAS FIELD DEVELOPMENT PROJECT on
PDS package from 3rd JUNE 2011 To 31 SEP 2011
Previous Organization : Worked with HARSHAL ENG FOR AKER SOLUTATIONS PUNE MAHARASHTRA
‘DESIGNER PDS’ On shore IOCL PARADIP REFINERY PROJECT on
PDS package from 3rd JAN 2011 To 23rd MAY 2011
Department : Piping Design Dept.
Previous Organization : Worked with VUCADD DEPUTED FOR UDHE INDIA LTD PUNE MAHARASHTRA
‘DESIGNER PDS’ On shore GULF FARABI ALB SA project on
PDS package from 13th Oct, 2010. To 31ST DEC 2010
Department : Piping Design Dept.
Previous Organization : Worked with DATTA ENTERPRIES DEPUTED FOR CHEMTEX LTD Mumbai
‘DESIGNER PDS’ on
PNK ORLON on shore project on
PDS package from 17th Nov. 2008 TO 31ST July 2010 (20m)
Department : Piping Design Dept.
Previous Organization : Worked with SK E &C INDIA PVT. LTD. Gurgaon
‘DESIGNER PDS’ on
KOL on shore project on
PDS package from 15 MAY.2008. To 15th Nov 2008(6m)
Department : Piping Design Dept.
Previous Organization : Worked with CALIBRE DEPUTED FOR “RELIANCE ENGINEERING ASSOCIATES LTD.” Navi Mumbai, as a ‘PDS MODELER’ on JERP On shore project on PDS package from Feb 2007 to MAY 2008 (15 months)
As a Piping Draughtsman on NOCIL – Relocation project from Sept 2006.to Jan.2007.
(5 months)
Iso sketch as build plant
Department : Piping Design Dept.
Previous Organization : M/s Gabatia Engineers & Consultants- Belapur, Navi Mumbai
Duration : 10th Jan, 2006 to August 2006(8mts)
Designation : Piping draughtsman.
Department : Piping department.
Work For following Project : RELIANCE PETROLIUM LTD. JAMNAGAR
IOTL
HPCL
Previous Organization : M/s Manu Tech Associates – Thane.
Duration : 9th Oct, 2004 to 5th Jan, 2006. (14 months)
Designation : Piping Draughtsman.
Department : Piping Department.
Work For following Project : INDIAN OIL TANKING –MANGLORE AIRPORT.
HLL. (Gujarat) for Powder Plant.
Reliance India Ltd on PP Pilot Plant.
Gulf Ferrari on Petrochemical Project.
Previous Organization : M/s Chempro Expertise India Ltd. – Andheri, Mumbai
Duration : 2nd Feb, 2003 to 8th Oct, 2004. (21 months)
Designation : Piping Draughtsman.
Department : Piping Department.
Work For following Project : BASF –TURBHE.
Chemtreat Composite India Ltd.
Synergy Plastics
Previous Organization : M/s: - Maharashtra Elec. & Mech. Works.-Byculla, Mumbai
Duration : 1st Oct. 2001 to 28th Jan, 2003. (16 months)
Designation : Mechanical/Piping Draughtsman.
Department : Design Department.
Nature of work : 1. Ship Drawings details
2. Upper Deck & Lower Deck detail Drawings.
3. All Machine Drawing.
4. Preparing P & I Diagrams.
5. Preparing Equipment Layout.
6. Preparing P & I Diagrams.
7. Equipment Layout.
8. Foundation details G.A.’s.
9. Tank, vessel’s G.A.’s.
10. Pipe support details Drawings.
11. Structural Skid Drawing.
12. Isometric Drawings.
13. Preparing Pipe Layout.
14. Tank, Vessels, Platforms & Ladder Details Drawings.
15. Preparation of piping Modeling
16. Support Modeling
17. Isometric extraction
18. Preparation of Isometric, Checking Isometrics as
19. Per P& I diagram. Special Support marking, Preparation
20. of pipe rack plan, Sectional views, interconnecting.
21. Coordinating with Construction dept.