Welcome Guest

Site / Construction >> Project Engineer / Manager 
Project Engineer Resume Sample, Experience : 4 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied: Project Engineer
Job related skills / software:AUTOCAD, Mat Lab, Trouble shooting electrical systems.
Category:Site / Construction
Sub Category:Project Engineer / Manager
Years of Experience:4 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electronics and Communications
Email Id:[Private]
 
Are you looking for job now?:No
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

CAREER OBJECTIVE:
Seeking a challenging environment where I can gain and apply my skills for the benefit of the organization.
SUMMARY:
Holding years of experience in Electrical engineering and site management for various clients with requirements ranging from installation of simple power systems to fully fledged substations.
AREAS OF INTEREST:
Electrical machines
EDUCATIONAL QUALIFICATION :    
Course    Institution    Examining  Authority    Year    Percentage
MBA (PGDM)    Periyar university salem    periyar    2011      Pursuing in distance education    -
B.E.,   (E.E.E)    Karunya University Coimbatore.    Karunya University    2005-08      First class
DIPLOMA (E.E.E)    Ramu Seetha Polytechnic College Virudhunagar.    J-Scheme    2002-05      First class
S.S.L.C    S.D.A Matric School, Kochadai,Madurai.    Matriculation    2001-02 First class
Job descriptions:
Company: Sterling and Wilson ltd
                    (Associates of shapoorji pallonji, TATA group) (BANGALORE)
Designation: PROJECT ENGINEER,
Duration:  2011 Jun – Till date
Project handling :
        ASTRA ZENECA PHARMA LTD    BANGALORE (2011 June to till date)
All pharmacy equipments powering up and commissioning of panels.
For AHU’S VFD installations, DOL and STAR-DELTA motor errections.
VFD programming and interfacing with BMS
Preventive devices wiring for AHU’s door limit switch.
Installation of RPM meters for AHU’s.
Installations of clean room light fixtures and occupancy sensors.
Installation of 2no’s of 500KVA DG sets with all respective aspects.
Installation of DG of capacity 1250KVA.
2MVA sub-station errection (joined at the stage of commissioning)
Commercial parts of supply and installations.
Company:    Crown Electricals, Chennai                                                                                                             
Designation: Project Engineer
                                                                                                                                                                                                                                                   
Duration:  2008 Nov - 2011 June
Project handled
1.


APOLLO hospital, Madurai – 9 months (2008 Nov-2009 Aug)
Erected 11 KV substations for load demand of the newly built hospital extension with modern equipments.
Performed synchronization of two various KVA DG's with advanced PLC system.
Completed all the assigned tasks on time successfully.
2.  ACS, Chennai - 1 month (target job) (2009 Aug-2009 Sep)
Installed power systems for all pc's and other software equipments like server racks.
Installed raw power and UPS sockets for an area of 1,32,000 sq.ft.
Appreciated by client for completing the work successfully in a very short span.
3.  SHELL India private ltd, Chennai - 3 months (2009 Oct-2009 Dec)
Installed power systems for all pc's, server racks etc.,
Installed raw power and UPS sockets, erected rising mains
Installed occulex (daylight sensor) & occupancy sensor
4.  Lister technologies, Chennai - 3 months (2010 Jan-2010 Mar)
Installed power systems for all pc's, server racks etc.,
Installed raw power and UPS sockets.
Got appreciations from client for completing the work without any snags.
5.  Super Religare laboratory, Bangalore - 6 months (2010 Mar-2010 Sep)
Installed 630KVA compact substation, servo stabilizer.
Designed earth pit layouts.
In charge of material procurement,
Headed the team for client approvals & negotiations.
Installed raw power, UPS and various industrial sockets.
6. Sivasakthi hotel, Salem (2010 sep-2011 Feb.)
Installation of 1250KVA transformers & internal hotel requirements.
7. BOSCH, Coimbatore (From2011 Feb. to 2011 June)
Installed power systems for all pc's and other software equipments like server racks.
Installed raw power and UPS sockets for an area of 55,000 sq.ft.
Designed lab requirements
Responsibilities handled:
Monitoring projects and ensures its proper execution.
Preparations of the submittals required for the materials and ensure that they were in compliance with the specifications.
Organizing the working of the project, procuring the major items such as light fixtures, control panels etc.
Evaluation of the job performed and providing the necessary follow up for payments.
Scheduling the project and arranging monthly meetings and ensure that the project timeline was maintained.
Following consultant snags
Evaluating the engineering drawings and coordinating to install the required equipments.
Assisting the customer and reviewed the work, gathering the customer’s requirement and obtain a deadline for the project.
Technical Knowledge:
Understanding drawing.
Executing as per design.
Selecting preventive devices depends on their load.
Analyzing cable sizes for various loads.
Load calculation.
Load scheduling.
Programming VFD’s.
Circuit designing for preventive devices such as limit switch.
Testing’s for cable and earth.
Megger test and load test.
Functional test for panels.
CT and PT test.
Cable terminations and dressing.
Trouble shooting electrical systems.
PACKAGES KNOWN:
AUTOCAD 2007
Basics of C++
Mat Lab
MS office
MS Excel
INPLANT TRAINING:
Understanding of the electrical operations and revenue systems at SOUTHERN RAILWAYS, MADURAI.
Understanding of the importance of renewable energy sources at RS WIND MILL, NAGERCOIL.
ACHIEVEMENTS:
Excellent leadership and team building qualities.
Got appreciation from clients many times for good and punctual work
Ability to handle extreme deadlines and limited resources.
LANGUAGES KNOWN:
Fluency:    English, Tamil.
To speak:  Hindi, Kannada and Malayalam.
Declaration
I hereby declare that all information stated above is true to the best of my knowledge and belief.
Date:           
Place:  Bangalore                                                                            (King Carlson Jim. G)

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.