K.Gandhi
Current Location/Address. City or Town : Gujarat
Country :India
Permanent Location/Address. City or Town :Thiruvallur
Languages : English, Tamil, Hindi Read, write and speak
Nationality : Indian
Highest Qualifications :
** Bachelor degree in Mechanical Engineering Madras 1993
** M/Degree Master of Business Administration Chennai 2007
Other Qualifications :
Memberships, Certifications. ASNT level II
Computer Skills and Software Used :
** AutoCAD
** PDMS (for model review)
** Windows Microsoft Office
Area of Expertise :
Piping Skid & Packages Structure. Pipeline Vessels Hydro testing. Storage tanks Well pad construction Material inspection. Internal fixing Precomissoning Final handover
Additional Information :
Father name : P. Kanniyappan Marital status : Married
Date of Birth : 02/08/1969 Passport Detail : J6631031
Permanent address : New no 43/176 3rd street Valid up to : 05/07/2021
Devi meenashi nagar Total experience. : 20 Years
Thiruvallur Mob :+91 9965586111
Tamilnadu – India. +91 7043347957
Pin 602 001
Professional Experience :
** Reliance industries ltd. (Refinery oil and Gas) J3 project C2 complex
** General Manager-lead construction December 2014 to till date
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting weekly progress review
** Entire piping works scope 120000 IM for UG and 450000 IM for AG .Maximum pipe size 96 inch for cooling water line
Leighton India ltd. (EPC oil and Gas) :
Manager-piping September 2013 to November 2014.
Project :
Power distribution for expansion project. Cairn India ltd-Rajasthan
Responsibilities
** Looking after site contractor fabrication, construction, and hookup work activities.
** Provide the interface between the Project and operation team
** Ensuring good communications and relations with the sub- contractors
** Arranging on-site safety awareness, safety performance with contractor and Project Team.
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting with client for weekly progress review
** Entire piping works scope 65000 inch dia with 424 test loops. Maximum pipe size 24 inch dia for steam line
** Codes& Standards followed : ASME/AWS/API
Ramsis Engineering WLL Co., Kingdom of Bahrain.(EPC oil and Gas Company) :
Construction Superintendent February 2012 to May 2013
Project :Tatweer Petroleum & EWA Ministry Water storage tanks
Responsibilities :
** Looking after site contractor fabrication, construction, and hookup work activities during Execution Phase
** Provide the interface between the work face and the Construction Site Manager or Construction Site Lead
** Ensuring good communications and relations with the contractors
** Arranging Champion on-site safety awareness and safety performance with contractor and among Project Team members
** Assisting contractor in early site construction planning/construction planning prior to site mobilization
** To Serve as day-to-day interface with contractor and craft labour during the Construction Phase, providing a focus on safety, quality, cost, and schedule
** Interaction with QA/QC personnel to address quality issues/progress
** To Ensure compliance with specifications, procedures, and plans
** Monitoring workforce productivity and progress relative to schedule
** Attending meeting with client for weekly progress review
** Entire pipeline from Well manifold to BAPCO refinery
** Providing on-site support to the Construction Site Manager as required
** Codes& Standards followed : ASME/AWS/API 5L
Cairn Energy India Ltd, Rajasthan.(Onshore oil and Gas Company) :
Consultant-Sr Construction Engineer July2010 to January2012
Project : Rajasthan Northern Area Development Project
Mangala Processing Terminal for Oil
Raageshwari Gas Terminal for Gas Phase I and II
Responsibilities :
** Co-ordination with Design and Engineering departments to resolve the site issues and technical queries.
** Coordinating with the contractors for efficient Quality, Safety and Progress of job.
** Conducting meeting like planning and progress with sub-ordinates and contractors
** Looking after Fabrication and Erection of piping, pressure vessels, tanks, site activities & supervision, inspection, quality control and Pre- commissioning.
** Static equipment erection, hook up and piping up to box up stage.
** Internal fixing for vessels to increasing production.
** Exercise control over manpower and material resources to execute jobs within schedule and budget, meeting all HSE requirements
** Professional in GA Drawings, P&ID’s and Isometrics.
** Test package preparation, punch list preparation, pressure test inspection, re-instatement, preparation of final dossier
** Co-ordination with QA/QC for clearing entire Piping system including Mechanical Clearance, Hydro testing, Box-Up and Leak Testing of Piping System.
** Entire Piping works in Mangala Process Terminal in the areas like Oil Train area, Pig launcher and Receiver area, Settling Tank area.
** 8 oil Well pads in MPT and 4 Gas well pads in RGT for Phase I and II
Codes& Standards followed : ASME/AWS/API
Offshore Engineering Services (Deputed to Cairn Energy India Ltd) Onshore oil and Gas Company :
Sr Mechanical Engineer August 2007 to July 2010
Project : Rajasthan Northern Area Development Project
Responsibilities :
** Construction supervision & Monitoring
** Tank ages
** Structural’ s
** Process Piping
** Engineering packages –Static equipment
** Involving varies
** Construction meeting
** Technical review/construction review/status
** Co-ordination with QC& sub contracts
** Engg & Technical issues
** Co-ordination with NDT team & follow- up
** Reporting to construction manager
Codes& Standards followed : ASME/AWS/API
Catskill infra-structure pvt ltd, Mumbai.
(Oil and Gas EPC Company) :
Mechanical Engineer January 2002 to July 2007
Responsibilities :
** Fabrication and Erection of piping, Testing, Hook up, Punch list liquidation and commissioning.
** Exercise control over manpower and material resources to execute jobs within schedule and budget, meeting all HSE requirements and co-coordinating with other departments
CR Micro touch Engineers, Ranipet (ISO9001 – implemented) :
Sr. Engineer – Inspection Nov 1998 to Dec 2001
L&R Holding SDN BHD, Malaysia :
Fabrication Engineer August 1996 to Oct1998
D.V.M. Engineering Works BHEL, Ranipet :
Engineer May 1993 to July 1996
Responsibilities :
** Plan and Execut :e routine repairs and maintenance of the machines, Minimize downtime to control spares inventory levels.
** To administer Day to day operations of the workshop including people management
** Handling plant maintenance
** New plant expansion which includes Fabrication and Erection of structure columns, bracings and trusses
** Fabrication of Ducts Columns, Handrails, Platforms, ladders.
** Fabrication & Installation of Screw Conveyors, Industrials Fans, Chutes, Ventilators.
** Maintenance & Overhauling of strapping Machines, Welding Machines, Drilling Machines, Hand Trolleys , Forklifts.
** Welding and reconditioning of Heavy duty equipment
** Supervision of fabrication & job execution at site and Material Planning.
** Preparing BOM, Cutting plan, production planning and production re
** Preparing and maintenance of WPS / PQR
** Raw material/Bought out components inspection
** Production stage wise (in process) inspection of welding
** Cleaning & Painting inspection
** Maintaining all quality and inspection documents as per QAP / ISO procedures
Date :
Place :