Welcome Guest

Piping / PDS / PDMS >> Piping Fabrication/Construction/ Foreman 
Piping Supervisor/Foreman Resume Sample, Experience : 7 years

Sponsored Links:
    

Biodata

Name of the Candidate:Mohammad Shameer Mallick
Name of the Post Applied:Piping Supervisor/Foreman
Job related skills / software:Review of GAD’S with P& ID, Isometric Drawing and Piping support drawing, Scheduling men power resource as per requirements.
Category:Piping / PDS / PDMS
Sub Category:Piping Fabrication/Construction/ Foreman
Years of Experience:7 years
State:Bihar
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:Diploma
Major / Specialization:Mechanical
Email Id:maliksamir421 AT gmail.com
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

MOHAMMAD SHAMEER MALLICK
Contact No : +919525977814

Contact Address :
VILL+POST-ADSAR
DIST-JAMUI
STATE-BIHAR
PIN CODE--811307

Personal Data:
Date of Birth:15/02/1991
Sex : Male
Nationality :Indian
Marital Status :Single

Passport No : - Z 2638407(ECNR)
Place of Issue :- PATN
Date of Issue :- 29/08/2014
Expiry Date :- 28/08/2024
Languages Known : English, urdu, Hindi, & Arabic.
Email id :malliksamir421 AT gmail.com

PIPING FOREMAN:
Having more than 7+ years of relevant experience in India and abroad in petrochemical plant, Refinery, Gas Plant, construction work as a PIPING SUPERVISOR/FOREMAN.. Holding several of responsibilities, workforce for various type of piping jobs. I am fully conversant with Piping Fabrication, Erection, Pre-Commissioning and Hydro testing activities compiling for client approval.

Education :
Karmavir Dadasaheb Kannamwar College of Engineering,(MSBTE)
COMPLETING DIPLOMA IN MECHNICAL ENGINEERING,(2006-2009)
JANTA HIGH SCHOOL, ADSAR(JAMUI) MATRICULATION(2006)

Skills & Computer Knowledge :
** Operating System - Windows 98, 2K / XP / 2K3 /Vista/7 , Application - MS - Office, Words 16, BMS, FORTRAN Language, Web Technology Internet (Email, Attachment, F.T.P etc).
** Fabrication, Eructation, Installation, Under Ground/Above ground drainage system Pipe laying Isometric, designing, piping system, process, Valves, ASTM, ASME, API, etc.
** Ability to think out of the box, to lead a team under pressure, to adjust to different kind of people & environment, to give best output in challenging & motivating work condition..

SUMMARYOF EXPERTISE :
COMPANY NAME  : DODSAL ENGINEERING & CONSTRUCTION PVT LTD
SITE  : SHAH GAS DEVELOPMENT(PACKAGE 2&3)PROJECT(Abu Dhabi)
DESIGNATION  : Piping Foreman
PERIOD  : 04.11.2015 TO 24.06.2016

COMPANY NAME  : AL HASSAN ENGINEERING & CONSTRUCTION
SITE  : LNG SUR, OMAN
DESIGNATION  : Piping Foreman
PERIOD  : 11.09.2014 TO 10.09.2015

COMPANY NAME  : ALFA-BETA CONSTRUCTION CO.PVT.LTD.
SITE  : DURGAPUR POWER PLANT
DESIGNATION  : Piping Foreman
PERIOD  : 11.05.2012 TO 10.06.2014

COMPANY NAME  : VISHAL ENGINEERING & CONSTRUCTION COMPANY LTD.
SITE  : HALDIYA REFINERY PROJECT
DESIGNATION  : Piping Foreman
PERIOD  : 09.03.2010 To 30.03.2012

TOTAL EXPERIENCE- 7 YEARS
ABROAD - 2 YEARS
INDIA - 5 YEARS

WORKS CARRIED OUT :
COMPANY NAME  : DODSAL ENGINEERING & CONSTRUCTION PVT LTD
SITE  : SHAH GAS DEVELOPMENT(PACKAGE 2&3)PROJECT(Abu Dhabi)
DESIGNATION  : Piping Foreman
PERIOD  : 04.11.2015 TO 24.06.2016

COMPANY NAME  : AL HASSAN ENGINEERING & CONSTRUCTION
SITE  : LNG SUR, OMAN
DESIGNATION  : Piping Foreman
PERIOD  : 11.09.2014 TO 10.09.2015

COMPANY NAME  : ALFA-BETA ENGINEERING & CONSTRUCTION PVT LTD
SITE  : NTPC DADRI,NEW DELHI
DESIGNATION  : Piping Foreman
PERIOD  : 11.05.2012 TO 10.06.2014.

COMPANY NAME  : VISHAL ENGINEERING & CONSTRUCTION
SITE  : HALDIYA REFINERY PROJECT
DESIGNATION  : Piping Foreman
PERIOD  : 09.03.2010 To 30.03.2012.

Professional experience:
** Review of GAD’S with P& ID, Isometric Drawing and Piping support drawing.
** Scheduling men power resource as per requirements.
** Knowledge of drafting procedures and practices.
** Awareness of standards , codes and practices.
** Having good knowledge of plant safety rules & regulations.
** Good knowledge about Permit to work systems (PTW) and several kinds of permits like Cold work permit, Hot work permit, Limited Space Entry permits.
** Highlighting and solving of any technical or organizational problems at the team level in terms of location and setting priorities in the works execution under direct supervision of the site manager.
** Capacity to do job alone by following Safety rules & regulations.
** Checking the piping field installation to ensure that quality of materials used and workmanship are according to drawing specification.
** Coordinate work teams directly in order to maintain high standards of performance, quality and safety
** Good Experience in the Plant Maintenance.
** Ensure work permits (confined space welding, grinding, erection, work for high level, etc
** To maintain documentation for record.
** To execute the job as per requirement.
** To identify the job location with ship staff and surveyor on board.
** To coordinate with other sections to carry out in way jobs.
** Planning, scheduling and providing work direction to piping crews to achieved the target goal
** Review piping isomeric drawing, pipe support drawing as shown on piping G.A & p & ID.
** Pipe Spool and pipe support fabrication & erection monitoring including availability of material
** Piping erection ,fit up, welding ,test pack activity supervising
** Preparing as built Isometric as per site condition.
** Preparing Isometric by referring General Arrangement drawing.
** Piping fabrication of various sizes of pipes and material class.
** Routine inspection of progress of work.
** Fabrication and installation of A/G and U/G piping works at different areas.
** Coordinating work assignments with subordinates and superiors.
** Attending construction coordination meetings.
** Other job related responsibilities by implementing safety regulations and procedures in order to protect life and property.
** Material traceability, Mill test certificate verification for client approval.
** Heat No control as per MTC and NACE satisfaction as per Mill test certificate.
** Verification of material satisfaction / identification and properly punch marked or not in all fittings and pipes.
** Verification of wall thickness / schedule of pipe and color coding as specified in MTC by physical inspection.
** Controlling traceability number during fabrication & erection.
** Monitoring air blowing, water flushing, tightness test, inerting, in hence cleaning, degreasing, and chemical cleaning activities.
** Lining and warming up of LP & MP steam system for steam blowing and acceptance.
** Reinstatement activities and making punch list as per P&ID of those system accepted by the owner.
** Daily coordination with the QA/QC for continuos standardization of the specified works
** Supervision for fabrication of all kind of fittings, installation of various flanges, welded, treaded and screwed valves
** Time to time checking the dimensional accuracy in compliance with the drawing
** Daily coordination with the clients QA/QC for continuous standardizations of the specified works
** Documentation of fabricated items for client daily accomplishment
** Coordination with Safety Engineer, Inspector for safety equipment layout and work permit
** Responsible for daily tracking and monitoring of daily accomplishments and initiate work sequence of activites to emphasis proper method and technique
** Pipe fabrication of various sizes of pipes and material class.
** Erection of piping with support
** checkup all fitting and valves before fit up Fabrication of support as per drawing
** Reading and comparing isometric with G.A.D & P&ID.


Preparation of isometric for small bore. Marking of joint number and field jointed. Planning for fabrication, erection depends upon the manpower, materials, work front and machinery available as per client requirements.
** Arranging manpower, tools and tackles, consumables for making fit up. Checking fit up as per standards and codes. Coordination with the client for fit up inspection and clearance.
** Arranging manpower for fabricating special samples coolers, long radius bends from pipes if required. Stacking of fabricated spools with identification marks.
** Review and report of departmental head the day to day progress. Coordination with vendors. Day to day micro planning and mobilization of site teams & follow up the work progress
** Supervised the test package and punching. Supervised the erection, assembles, alignment and welding the spools as per GAD and isometric drawing.
** Supervised the erection, assembles, alignment and welding of different types of support as per GAD and Isometric drawing
** Supervised the erection, assembles of alignment of valves (Gate Valves, Globe Valves, Relief Valves, angle valves, check valves etc.) as per GAD and Isometric drawing

Declaration :
I here by declare that all the information mentioned above is true to the best of my knowledge.

Mohammad Shameer Mallick

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.