Name of the Candidate:[Private]
Name of the Post Applied:MEP Manager
Job related skills / software:Installation and commissioning of all MEP related works, making the construction schedule,Material management,co-ordination with client and sub contractors,implement the modern technology in construction,Develop the sub-ordinates and ensuring the safety and quality Standards.
Category:Site / Construction
Sub Category:Project Engineer / Manager
Years of Experience:13 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electrical and Electronics
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:No
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

M.SUTHANTHIRA MOORTHY
Email : sevalmsh AT gmail.com
Mob :+91-9843870108

OBJECTIVE :
Obtaining a challenging position on the cutting-edge of technology where experience, education, training and strong professional growth can be fully and productively utilized.

EDUCATIONAL QUALIFICATION :
BE  : Electrical and Electronics Engineering (Nov 2005).
University  : Mohamed Sathak Engg College, Anna University, TamilNadu.
Division obtained  : First Class
Total Experience  : 12 Years.

EMPLOYMENT HISTORY :
Present Employer :December 2007 to till date
Present employer  : L&T Construction.
Designation  : Construction Manager (Electrical)

RESPONSIBILITY  :
Installation, testing and commissioning of all MEP Works, prepare the construction schedule, invoice,  Material management, coordination with client and  Sub-contractors.

JOB PROFILE :
** Installation and Commissioning of Electrical equipment’s in Factories projects, Defense buildings, residential buildings and IT buildings.
** Handled power transformers up to 20MVA,HT/LT panels, interior wirings
** Individually erection and commissioning of 33kV substation,
** Cable laying, terminations and other related works
** Building Management System, fire alarm system, firefighting/protection system

CCTV, PTZ cameras for security systems :
** Installation and commissioning
** Fire protection systems erection and commissioning
** Installation and commissioning of Fire hydrant systems, sprinkler systems and fire alarm systems
** Pump ,motors ,panels and limit switches installation and commissioning
** HVAC systems ducting, Chiller (up to 300TR ,chill water pipe line erection and commissioning)
** CSU,FCU and Split AC erection and commissioning.

PROJECTS EXECUTED :
December 2007 to April 2008 (UBS building –Hyderabad):
** 15 floors IT building Electrical installations, building management systems testing and commissioning.
** HT/LT Panels, cables and internal electrifications installed and commissioned.
** Installed and commissioned of distribution transformers.
** Building security systems installed and commissioned.

May 2008 to December 2009 (Reliance Closed workshops – Kakinada):
** HT/LT Panels, switch gears, cables and internal electrifications installed and commissioned
** Installed and commissioned of Distribution transformers.

Jan 2010 to June 2012(Lafarge Cement Plant – Jamshedpur):
** Cable Trays, LT/HT Cables installations and commissioning
** HT/LT Panels, switch gears, cables and internal electrifications installed and commissioned
** Conveyors Motors, belts way switch, pull cord switch installation, testing and commissioning.
** PLC Panels, VCS and monitoring systems installation, testing and commissioning.

July 2012 to Nov 2012 (Renault Nissan Car Factory-Chennai) :
** Cable Trays, LT/HT Cables installations and commissioning
** HT/LT Panels, switch gears, cables and internal electrifications installed and commissioned
** Installed and commissioned of Distribution transformers.

Dec 2012 to Dec 2013 ( Indian Navy Service VLF Transmitter Building-Tirunelveli):
** HT/LT Panels, switch gears, cables and internal electrifications installed and commissioned
** Power Filters and building security systems installation, testing and commissioning.
** Jan 2014 to May2015 (Indian Air force MICA Missile & Explosive storage buildings – Gwalior)
** HT/LT Panels, switch gears, cables and internal electrifications.
** Building security systems installation under progress.

June 2015 to till date (Provident sunworth residential building- Bangalore):
** Multi stored building internal concealed slab conduiting and wiring
** Building security systems and FAS installation and commissioning

PREVIOUS EMPLOYER-1 :
April 2006 to Nov.


2007
Employer  : M/s Suzlon Energy Ltd
Designation  : Operation Engineer (Electrical)
Responsibility  : Erection, testing, commissioning and Operation of wind turbine generators
(Cap : 0.6 MW to 1.5 MW) and 11 KV/33 KV SS.

JOB PROFILE :
** Working in Centralized Monitoring System and controlling the turbines through PLC with DCS using Fiber Optic Communication System.
** Maintenance of Induction Generator – 0.6 MW, 1.25 MW and 1.5 MW.
** Operation with star delta connected 3- phase motors.
** Operation and maintenance with power panel, Capacitor panel, Slip ring, Power Contactor.
** Instruments & Sensors- Vibration sensor, Proximity sensors, Infrared, Pressure transmitter, RTD, Anemometer, wind vane, vibration sensor, position encoder and resolver.
** AC Drive Control System (Variable Frequency drive),
** VCB, ACB, HT/LT Transformers, CTs and PTs.

PREVIOUS EMPLOYER-2  :
May 2005 to March 2006:
Employer  : DKD Engineers and Agencies, Coimbatore, Tamilnadu.
Designation  : Site Engineer-Erection and Commissioning.

JOB PROFILE :
** Installation, Maintenance and Commission of windmill project and transformer erection up to 950 KVA.
** Installation, Maintenance of HT Structure Yards, Overhead HT transmission lines and under ground cables.
** Handling current transformer, Potential transformer testing
** Worked with Up to 33KV HT Lines, Disk insulator, Pin insulator, Post Top insulator,
** AB Switch and Various type of ACSR Conductor.

WORK PROFILE :
** Complete Execution of Project
** Co-Ordination with Clients, Sub contractors and Manpower.

WORK PROFILE :
** Execution and commissioning of Electrical activities in Project site.
** Co-Ordination with Clients and Sub contractors.
** Prepare the construction schedule, contractors billing and client billing.

COMPUTER EXPOSURE:
** Microsoft Office
** Internet Explorer
** Basics of Auto CAD

PERSONAL :
Father’s name  : Mr. M. Marimuthu,
Age  : 35 years,
Marital status  : Married,
Languages known  : Read, write & speak: English, Tamil
Speak : Hindi, Bangla and Telugu.
Hobbies  : Surfing internet, Interested in inventions, listening  Melody music’s.
Address for  Correspondence  : 16, North Street, Sevalpatti – Post, Kadaladi – Taluk, Ramanathapuram – 623135, Tamilnadu (INDIA).

DATE :
PLACE :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.