Welcome Guest

Site / Construction >> Planning Engineer / Manager 
Planning and Erection Engineer Resume Sample, Experience : 8 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Planning and Erection Engineer
Job related skills / software:Execution of post tensioning, cable grouting activities, bearing fixing, span alignment, fixing of expansion joints, concreting and all finishing works.
Category:Site / Construction
Sub Category:Planning Engineer / Manager
Years of Experience:8 years
State:Andhra Pradesh
Gender:Male
Salary Expected per Month(Rs):30,000 to 40,000
Highest Qualification attained:M.C.A. / MCA : Master of Computer Application
Major / Specialization:Computer Science
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

CURRICULUM VITAE
DonkayyaChodimudi
Email ID  : donkayyachodimudi AT gmail.com/dcklnt AT gmail.com

PLANNING SCHEDULING,BILLING AND LG ERECION SITE EXECUTION OFFICEER, Sr. Document Controller.

Around 8 years of experience in the Construction industry in Execution in LG Erection Executive Engineer domain.

Career Objective  :
To utilize my Programming skills with a self-motivated and positive approach with an organization that will help to improve my professional and personal skills.

Educational Qualifications  :
** Master of Computer Application from BHASKARA INSTITUTE OF MCA, Komatipalli in 2011 with 76.01%.
** Degree B.Sc(MPC) from Govt. Degree College, Srikakulam in 2008 with 60.00%.
** Intermediate (M.P.C.) from Govt. Junior College, Srikakulam in 2005 with 66.66%.
** SSC from Govt .High School, Srikakulam in 2003 with 61.33%.
** SSC Vocational from Govt .High School, Srikakulam in 2003 with 57%.
** PG DIPLOMA IN APPLIED OPERATIONS RESEARCH Annamalai University 2018.

I. T. Skills  :
Operating Systems  : Windows- 98, Windows XP/7.
Technologies  : Dot Net/Diploma in foundation Certificate.
Web Technologies  : HTML.
Servers  : IIS-SERVER
Data bases  : SQL SERVER 2008
MS Project.  : Primavera P6 software. EDMS Uploading.

Work Experience Details  :
Work as a Planning Engineer Erection-LG & Site Executive in LARSEN & TOUBRO LIMITED for Metro Rail Project, Hyderabad(from Sep-2011 to Jan-2019).

1. K Eswar construction Work
2. Preetham Engineering and construction
3. Apex Logistics. CMRL Project
4.NCC Limited

Work as a Planning Schedule Erection-U&I-Girder Erection& Site Executive in Nagarjuna construction company for Metro Rail Project Chennai (from Jan-19 to July-19).

Total Work Experience 7.10 years.

Working as engineer in M/S L&T Construction Infrastructure IC for ‘LAUNCHING GIRDER Erection LG Planning Engineering & Site Executive Work’ for structural fabrication for long line segments and assembly of the same, and pier cap starter, foundation shutter, Pier-head segments, Re-bar, strong back and lifting tackles for segment, cross barrier shutters at L&T Construction Infrastructure –Hyderabad Metro rail Project,Uppal-Hyderabad(from Sep-2011to Jan-2019).

Client  :L&TMETRORAIL(HYDERABAD)LIMITED.Design: L&T CONSTRUCTION INFRASTRUCTURE, GOVERNMENT OFANDHRA PRADESH. Description of Project:

ROLES AND RESPONISBILITIES  :
Launching Girder ,U&I-Girder ERECTION Planning and Erection ENGINEERING Work  :
** Launching Girder Assembly Erection Work.
** Winch Load Test.
** Erection of ‘precast segments’ at site with overhead launching system, and segments are transported through trailers.
** Segment Erection & Gluing and Stressing Work.
** Execution of post tensioning, cable grouting activities, bearing fixing, span alignment, fixing of expansion joints, concreting and all finishing works.
** Planning of day to day activities including labor maintenance & machinery
** Prioritizing and distributing work to the subordinates and supervisors.
** Attending review meetings and interacting with clients.
** Creating weekly and daily plans and getting them approved from site-in-charge.
** Resource planning and allocation. Work allocation according to daily plan.
** Preparing work procedure stage wise and getting clearance from higher management.
** Work offering and getting clearance, documentation and handing over.
** Store follow-up for welding consumables & maintaining buffer stock.
** Co-ordination and supervision of rail laying and alignment for PC Yard Gantry track.
** Overall management of store activities
** Organize the day to day stores and purchase works of all materials incoming & outgoing
** All stores tenders updating manual / computerized and reconcile
** Daily stock checking far valuable item. Reinforcement, Strand, cement, 10mm, 20mm,crush /River sand Admixture, Diesel, water etc.
** Generating Various reports like daily consumption, Monthly receipt
** Study& Analysis of wastage and consumption pattern of the material and give .the feedback to the concerned HOD.
** Yearly work stock valuation, Inventory control, record keeping
** Monthly reconciliation of material with production department
** Checking All Material inward
** Update computerized store system Bill Checking of suppliers as per GRN
** Physical verification of stock.


Receipt and issue of materials
** Prepare GRN (goods receipt note) Against Purchase orders.
** Proper storage and codification of materials to ensure good housekeeping
** Physical verification of stock
** Indent follow up with purchase department.
** Submit monthly reports i.e. monthly stock statement
** Submit monthly reports to Store In charge i.e. monthly stock statement, material received Computer Skills The candidate should be well versed/ informed in Excel, email& knowledge of SAP will be an advantage.
** To do follow up with suppliers in order to ensure timely deliveries.
** To source new vendor as and when required
** Responsible for the onsite planning and execution of civil, structural, architectural, MEP, Infrastructural & landscape works of the assigned project.
** Material purchasing MR Raising.
** Coordinate with Project Head/Engineer in-charge, Architects/Consultants Receive, Study of drawings, provide inputs to contractor’s/ labor teams, generate / review BBS.
** Thoroughly study the technical specifications and implement it in the construction process calculating the quantities of constituent works/materials from drawings and estimating costs Responsible for Material procurement follow-ups, site stock control, and Labor control and billing Interaction with vendors, contractors, to ensure the project objectives are met with.
** Construction supervision of all works at site, including safety, quality and time schedule.
** Follow Quality Assurance check lists and procedures Issue NCRs for all non-confirming processes and products follow up with NCR for its corrective action and preventive action
** Closing NCRs after through verification Conduct Quality control tests/measures on day to day basis. Contractor/Vendor Bill verification & recording Joint measurements
** Raising Material intends, receipt & issues Reconciliation of client supplied materials Progress reviews, Time & Cost Follow up Handle all site related activities
** Taking practical data from site on day to day basis and arrive at a data bank for the works involved on the completion of the project.Generating/Creating weekly plan & daily plan, daily DPR and RFI plan.
** Provide inputs on workmen productivity, gang composition to Planning department.
** Resource planning and allocation, work allocation with respect to daily plan.
** Manpower planning based on work front and requirement based on every month look ahead.
** Master production schedule Daily reports.
** Re work manufactured parts.
** Plain cement concrete following.
** Glue Consumption Quantity & LRPC, Cement Consumption Re reconciliation.
** Preparing work procedure stage wise and getting site Engineers information.
** Drawings uses span wise list out and submitted site Engineers information.
** Drawing Study, Work Allocation, Manpower planning, Measurement, Bill preparation, Work Study & Plan.
** Work offering and getting clearance & Apportionment of Gang composition based on work requirements.
** Allocation of workmen based on client commitments & constructability plan. Documentation and handing over.
** Safety Related Documentation and Third party certificates following.
** Daily plan Stressing, Tendon Grouting & Bearing Grouting Works.
** Store follow-up for welding consumables & maintaining buffer stock
** Raising material Following (MR).
** SIKADUR 31SBA & LRPC Consumption Reconciliation final Report submission.
** Co-ordination and supervision of rail laying and alignment for PC Yard Gantry track.
** Segment Dispatch following daily.
** Measurement preparation for Client billing and bill preparation for Sub-Contractors..
** Logistics vehicle following and billing.
** Erection Related Trailers, DCM,TMC, Unique crane,250T&80T etc. heavy cranes, Trailers & Hydra Following and bills preparation
** Material request based on daily, weekly and monthly plans to formwork, rebar & stores department. Reconciliation Cement and HT Strand coils.
** Daily Use for Microsoft Outlook & EDMS Documents unloading purpose using.

Personal Details  :
Father’s Name  : VerrayyaChodimudi.
Date of Birth  : 10th April 1988.
Languages Known  : Telugu, English,Hindi.
Marital Status  : Single.

Place  :
Date  :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.