Welcome Guest

Site / Construction >> Maintenance Technician 
Electrical Maintenance Manager Resume Sample, Experience : 15 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Electrical Maintenance Manager
Job related skills / software:Electrical Maintenance, Operating PCC,PMCC, MLDB,PDB,LDB,SLDB & APDB systems
Category:Site / Construction
Sub Category:Maintenance Technician
Years of Experience:15 years
State:Maharashtra
Gender:Male
Salary Expected per Month(Rs):more than 1 lakh
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electrical
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

GUNWANT D. BARDE
Email Id’s :sonudbarde AT gmail.com / gunwantbarde AT rediffmail.com

Electrical Engineer – 15 Years Exp. in Cement, Plaster, Gypsum Board, Gypsum Putty, False ceiling, Foundry & having Electrical Supervisory License.

CAREER OBJECTIVE :
Seeking assignments in Project & Maintenance Management with a high growth oriented organization. Having strong desire to work with an organization, where my capabilities and skills can suitably utilized and improved with the best result

ACADEMIC QUALIFICATION :
B.E. (Electrical Engg.) Nagpur university 2006, 66.67%
Diploma in Electrical Engineering. Mumbai Technical board 2003, 70.81 %
H.S.C Maharashtra State Board February 2000, 53.33%
S.S.C. Maharashtra State Board March 1998, 58.93%

CARRIER OVERVIEW :
A result oriented professional with over 15 years of experience in Electrical Maintenance, Industrial Automation, and Projects. Presently Working as Assistant Manager Electrical (Plant Maintenance) with M/S Saint-Gobain India ltd, previously associated with UltraTech Cement Solapur & M/s Indian Smelting & Refining Co. Ltd, located at Sanaswadi, Pune
Working as a Part of Middle Management & Responsible for Overall Maintenance of Plant & Leading a Maintenance Team. Possess excellent skills in Managing the spectrum of activities like Team Building & Resource Management, Maintenance & Projects System, Equipment modification, Installation & Commissioning.

EXPERIENCE :
1)Company Name : Saint-Gobain India ltd Wada, Mumbai, Maharashtra.
Designation : Assistant Manager Electrical & Instrumentation.
Experience : May 2011 to Till Date

RESPONSIBILITIES :
H.T. Section :
** Operating & Maintenance of 22KV/433V Substation
** Planning & Execution of maintenance of Transformers -2MVA, 22KV/433V,
** Maintenance of 22 KV ABB VD4 VCB’s , Transformers, VCB’s, HT Panels

L.T. Section :
** Operating PCC,PMCC, MLDB,PDB,LDB,SLDB & APDB systems
** Carrying out maintenance of all LT Switchgears, ACB (Siemens & ABB),UPS,APFC,
** PM Planning & Execution of all plant lighting, Street lighting, Motors, VFD’s, PCC,PMCC
** Planning & Execution of maintenance of all Plant motors up to 300KW.
** PM planning & Execution of DG’s -1010KVA.

Other :
** Vendor Negotiation for DG, UPS, Motors, FEL, Panels and execution of special work.
** Handling overall electrical Departmental Activities in the plant
** Spare management, Training to new technicians, engineer & People development.
** Energy saving projects, like lighting automation, EFF2/EFF3 motors, Modifications.
** LOTOTO Manager, Electrical Safety Manager, SAP PM
** Handling Siemens PLC, Drives like MM 440, Master drives, AB drives, Yaskawa Drives up to 150 KW
** Trouble Shooting & Modification work in PLC automation in the system.

Projects :
** Handling New Projects Planning and Execution, Steam burner, Steam dryer, Calciner, Water Recovery system, DC system
** Carrying out the energy conservation activities.

WCM :
** WCM team Mentor
** Handled 5S, FI and AM/PM projects
** Coordinating the maintenance activities through WCM

2) Company Name : UltraTech Cement, (Solapur / Pune)
Hotgi Cement works, Maharashtra.
Designation : Senior Electrical Engineer
Experience : From 23 May 2009 to 31 March 2011.

RESPONSIBILITIES :
H.T. Section :
** Operating & Maintenance of 220KV/22KV Switch yard,
** Planning & Execution of maintenance of Transformers -25MVA,220/22KV
** Planning & Execution of maintenance of Transformers of 2MVA 22KV/415V
** PM planning & Execution of maintenance of 6.6KV Jyoti Make VCB’s, HT VFD’s
** PM Planning & Execution of HT Motors up to 6.6KV, 2MW

L.T. Section :
** Operating PCC,PMCC, MLDB,PDB,LDB,SLDB & APDB systems
** Overall maintenance of all LT Switchgears, ACB, 110V Battery Banks,
** Overall maintenance Capacitor Banks of 1300 X 4 KVAR.
** PM Planning & Execution of all plant lighting, Street lighting & Machine lighting.
** Planning & Execution of maintenance of all Plant motors up to 500KW
** Handling Packing Plant with two packers of 12 Spouts. Handling and operating the maintenance of Wagon loader, Wagon tippler, Truck Tippler, truck loader and Lab equipments.

Other :
** Vendor Negotiation for HT VFD’s, UPS, Motors, Panels and execution of special work.
** Handling overall electrical Activities in the plant
** Spare management, engineer & People development.
** PM planning and execution of Pressurization system, AHU, HVAC equipments and AC’s.

PLC :
** Handling Siemens PLC, AB drives, up to 450 KW
** Trouble Shooting & Modification work in PLC automation in the system.
** PM Planning & Execution of DC motors up to 200KW
** PM Planning & Execution of DC drives up to 200 KW

Projects :
** Handling New Projects Planning and Execution.
** Carrying out the energy conservation activities.
** Team leader for Electrical Projects.
** Team Member for RCA.
** Member of R & D for (Electrical & Mechanical)

WCM :
** WCM team Mentor
** Coordinating the maintenance activities through WCM
** Responsible for maintaining the 5s & EHS activity.

3) Company Name : Indian Smelting & Refining co. Pvt. Ltd (Birla group), Sanaswadi, Pune (MH).
Designation : Electrical Maintenance & Project Engineer
Experience : Sept 2006 to Apr 2009

RESPONSIBILITIES :
H.T.


Section 
:
** Operating & Maintenance of 132/22KV
** Planning & Execution of maintenance of Transformers -10MVA, 132 KV/ 22KV
** Planning & Execution of maintenance of Transformers -3250KVA, 22 KV/ 415V
** Planning & Execution of maintenance of Furnace Transformers -2012 KVA, 22KV/575V
** Overall maintenance of 22 KV ABB Make Breakers,
** PM Planning & Execution of Transformers, VCB’s, HT Panels. Harmonic Filter bank of 2MVAR capacity

L.T. Section :
** Operating PCC,PMCC, MLDB,PDB,LDB,SLDB & APDB systems
** Overall maintenance of all LT Switchgears ABB, Siemens make, ACB, 110V ,48V, 24V Battery Banks,
** Overall maintenance of UPS systems
** Overall maintenance Capacitor Banks of 1300 X 3 KVAR.
** Pm Planning & Execution of all plant lighting, Street lighting & Machine lighting.
** Planning & Execution of maintenance of all Plant motors up to 300KW.

DG Section :
** Handling & Maintaining the DG’s of 350 KVA of KOEL
** PM planning & Execution of DG’s.
** PM Planning & Handling ATS System for 350KVA DG.

Other :
** Vendor Negotiation for DG, UPS, Motors, Panels and execution of special work.
** Handling overall electrical Activities in the plant
** Spare management, Training to new technicians, engineer & People development.

PLC :
** Handling Siemens PLC, Drives like MM 440, Master drives, AB drives, Messung & Mitsubishi
** Trouble Shooting & Modification work in PLC automation in the system.

Projects :
** Handling New Projects Planning and Execution.
** Carrying out the energy conservation activities.

PROJECT WORK RESPOSIBILITIES :
** Material, machines & manpower planning.
** Material Indenting & negotiation with parties.
** Outsourcing & vendor selection.
** Estimation & costing of project work.
** Co-ordination with corresponding parties for execution of project work.
** Installation & maintenance of machines.
** Training to shift engineer & technicians
** PM scheduling & execution of PM.
** Panel inspection & selection.

PROJECT DONE :
1. Machine shop
1. Installation & commissioning of HMC, VMC, CMM, lathes, CNC, Drilling machines.
2. Installation of PDB, LDB, APDB, EPBAX DB.
3. Installation of Earth pits & Stabilizer.
4. Erection & commissioning of HPMV lamps.
5. Cable lying & termination.
6. Installation of Inverters for CMM machines.

2. Installation of 4MVAR capacity 22 KV Harmonic Filter bank
1. Installation of 5 Th & 7 Th harmonic filter bank bank.
2. Installation & commissioning of 22 KV Capacitor panel

3. Shot blasting Shop
1. Installation & commissioning of Disa shot blasting machines.
2. Installation of OHT cranes & Hoist cranes.
3. Installation of Grinders, cutters.
4. Instalation & commissioning of TAL cooling conveyer
5. Modification of TAL shot blasting machines
6. Installation of Dust collectors.

4. 2012 KVA, 1500KVA, 22KV/575V Furnace transformer
1. Installation & commissioning of Transformer
2.Installation of Earth pits
3. Installation of Annunciator panel.

5. Administrative office :
1. Installation & commissioning of Lighting.
2. Installation of PDB, LDB, ELDB, APDB, UPSDB & ACDB.
3. Installationg & commissioning of 20 KVA UPS.
4. Instalation & commissioning of 30 No. of BLUESTAR AC
5. Installation & commissioning of SERVER racks & EPBAX.
6. Installation & commissioning of Fire alarm system.
7. Installation of DG backup system.
8. Installation & commissioning of Earth pits.

Current CTC : 13, 00,000/-
Expected CTC : As per my experienced & education.
Notice period : 2-3 Months

PERSONAL DETAILS :
Name : Gunwant D. Barde
Father’s Name : Dnyaneshwar K. Barde
Date of Birth : 02/ 06 /1983
Marital status : Married
Nationality : Indian
Height : 175cm.
Weight : 75Kg
Mother Tongue : Marathi

DECLARATION :
I hereby declare that all the information furnished in this application is completed and correct to the best of my knowledge and belief.

PLACE:
DATE:

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.