Welcome Guest

IT / Computer2 >> Telecom/ RF/ BMS/ BTS/ BSS Engineer 
RF Manager Resume Sample, Experience : 17 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:RF Manager
Job related skills / software:Ensure the team has done proper RFEI survey for right site. And coordination with SCM team for material movement to the site, 2G &3G roll out responsibility
Category:IT / Computer2
Sub Category:Telecom/ RF/ BMS/ BTS/ BSS Engineer
Years of Experience:17 years
State:Tamil Nadu
Gender:Male
Salary Expected per Month(Rs):50,000 to 60,000
Highest Qualification attained:B.E. / BE : Bachelor of Engineering
Major / Specialization:Electrical and Electronics
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Curriculum Vitae:
V.Rajesh
E-mail - rajesh.amve AT gmail.com

Summary :
Seeking a challenging position in Telecommunication field, where I can apply the knowledge that I have learned and to grow in my career with continuous improvement and innovative attitude by acquiring new skills in the field related to my subject of study. Currently working NSN as a AT coordinator –Chennai with over 15years of professional experience in 2G & 3G&4G Telecom field.

Work Experience :
Current Designation  :AT Co ordinator (Nov17 to Till date)
1.Nokia 2G/3G/4G Intergartion and AT with BSNL Team and Hand over to BSS Team at chennai BSNL Phase VIII.4 Project.
2. Worked Senior Engineer as a Project Manager At Indonesia Axis Amber project in Iub/Abis Expansion work in Huawei Technologies Pvt limited From Nov 2011 to April 2012.
3. Worked as a Senior Engineer as a Implementation Manager at Chennai Huawei telecommunication Pvt Ltd from Jan 2009 to Nov 2011.
4 Worked as a BSS Engineer (O&M) in Aster Tele services Pvt Ld From Aug 2007 – January 2009.
5. Worked as a Project Engineer in GTL LTD Chennai, From April-2005-Aug 2007.
6. Worked as a Graduate Apprentice Trainee in GSM Planning & Development BSNL at Chennai from March 2004 to April 05.
7. Worked team member Nutech Pvt Ltd from July 2003 to feb04

Education :
** Bachelor of Engineering (EEE) Sri Ram Engineering College at Perumalpattu-602024. (Apr 2002).
** MBA (System) in Madras University at Chennai. (2006-2008)

Responsibilities :
** Installation & commissioning the 2G Huawei BTS (3012, 3012AE, DBS 3900) equipment.
** Give proper training to subcontractor for installation 3G Huawei BTS, and make BTS power ON.
** Ensure the team has done proper RFEI survey for right site. And coordination with SCM team for material movement to the site.
** 2G &3G roll out responsibility. .
** Ensure the team with working proper tools to handle the BTS installation and integrate the site.
** Coordinate with Site Engineer for Installation and commissioning.
** Huawei 3G Node B (BTS), 2G BTS indoor and outdoor Commissioning.
** E1-Rooting and Trouble Shooting.
** Trouble shooting the BTS equipment & Cell Site faults
** Replacing faulty modules/boards for BTS&BSC
** Nortel BSC(Optical, Electrical) O&M Activities
** Checking Alarms (Indoor, Outdoor) BTS
** Monitoring and escalating Network alarms from OMCR
** Identification of alarms and troubleshooting the faults
** Analyzing Fault, Configuration & Performance Management
** Coordination with Field Engineers.

Software Skills :
Language  : Basic C
Operating system : Windows.

Projects :
Project#6:
Pro


ject title 
: Axis- Amber
Organization  : Huawei India Pvt Ltd
Client  : Axis Amber
Duration  : Nov-2011 to April 2012
Role played  : Manager for O&M
Description  : Abis and IUB expansion of four region.

Project#5:
Project title  : Huawei –BSNL Phase V.1
Organization  : Huawei India Pvt Ltd
Client  : BSNL
Duration  : Jan-2009 to Nov 2011
Role played  : Senior Engineer as a Implementation Manager
Description  : 2G &3G roll out responsibility.

Project #4:
Project title  : Nortel –BSNL Phase 4
Organization  : Aster Tele services Pvt Ltd
Client  : BSNL
Duration  : Aug-2007 to Jan 2009
Role played  : As a BSS Engineer
Description  : Maintaining Motorola (H1, H2) BTS and Nortel (8k, 12k, 18k) BTS, BSC &OMCR activities.

Project#3:
Project title  : Nortel –BSNL Phase 4
Organization  : GTL Limited
Client  : BSNL
Duration  : 2 years and five month (Apr 2005 to August2007)
Role played  : As a team member in project development
Description  : BTS installation & commissioning, integration, call  checking, VSWR Checking, Power calibrations.

Project#2:
Project title  : GSM Planning &Development BSNL at Chennai.
Organization  : Graduate Apprenticeship trainee
Client  : BSNL
Duration  : 1 Year (March 2004 to April 2005)
Role played  : Graduate Apprentice Trainee Engineer
Description  : (H1, H2) BTS Installation & commissioning .

Project#1 :
Project title  : Motorola.
Organization  : Nutech
Client  : BSNL
Duration  : 8 Month (July 2003 to Feb 2004)
Role played  : Team Member
Description  : (H1, H2) BTS, BSC, XDCR, PCU Installation

Personal Profile :
Father Name  : Mr.M.Vedachalam
Marital Status  : Married
D.O.B  : 18 May 1979
Nationality  : Indian
Languages Known : Tamil & English

Declaration:
I hereby declare that the information given above is true to the best of my Knowledge.

Place : Chennai
Date :

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.