Welcome Guest

Site / Construction >> Manufacturing/ Production Engineer 
Industrial Engineer/ Production Manager Resume Sample, Experience : 8 years

Sponsored Links:
    

Biodata

Name of the Candidate:[Private]
Name of the Post Applied:Industrial Engineer/ Production Manager
Job related skills / software:Optimum Utiliztion of machines & man power, Making garment production feasible through R & D, Allocating proper man power per style with MMR(Man Machine Ratio).
Category:Site / Construction
Sub Category:Manufacturing/ Production Engineer
Years of Experience:8 years
State:Uttar Pradesh
Gender:Male
Salary Expected per Month(Rs):Negotiable
Highest Qualification attained:Diploma
Major / Specialization:Apparel Manufacturing Technology
Email Id:[Private]
 
Are you looking for job now?:Yes
Can the recruiter contact you?:Yes
Sponsored Links:

Resume Format / CV Sample Template / Example / Model :

    

Curriculum Vitae:
Dhruv Kumar Singh :
Present Address :
Flat No-SF-1
Plot No-206
Niti Khand-1
Indirapuram Ghaziabad UP

Contact :+919999326964 | +917838545495
Email : kunwar.dhruv.singh AT gmail.com

Career Objective :
To build my career by working for an organization which can offer me challenging Opportunities so as to develop my skill and serve my qualification and creativity in the Optimum way to grow with the organization.

Area of Interest :
** Production & Planning.
** Industrial Engineering.

Total work Experience- 08 Years & 06 Month:
Presently associated with Meenu Creation P.Ltd. as a Manager Industrial Engineer.

Duration : From 02nd January 2015 To till date.

Present Company profile :
It’s a “Division of Meenu Creation”. It’s an ISO : 9001-2000 certified company, Manufacturing woven & knits Garments. The company deals with Buyer like STR,NEXT,Pimky,KIABI,SAFERA,CAMAEU,. Etc.

** Handling a machine capacity of 1600machines (UNIT- A-33, A-47, A-113, B-29, C-67 & D-60).
** Improving productivity & Efficiency.
** Optimum Utiliztion of machines & man power.
** Managing Unit cost.
** Allocating proper man power per style with MMR(Man Machine Ratio)
** Generating daily production report, costing report and daily efficiency report

Work Experience :
Duration :From 01 September 2014 To 25 December 2014.
Designation :Sr.Industrial Engineer cum Production Manager.
Organization : Harry Fashion Ltd. Bangladesh.(Experience Group).

** Handling a machine capacity of 600machines.
** Improving productivity & Efficiency
** Optimum Utiliztion of machines & man power.
** Managing Unit cost.
** Allocating proper man power per style with MMR(Man Machine Ratio).
** Generating daily production report, costing report and daily efficiency report

Work Experience :
Duration :From 26 December 2012 To 25 August 2014.
Designation :Sr.Industrial Engineer.
Organization : Shahi Exports P Ltd.

** Handling a machine capacity of 450machines.
** Improving productivity & Efficiency
** Developping sewing and handling methods and training to workers.
** Optimum Utiliztion of machines & man power.
** Making garment production feasible through R & D
** Managing Unit cost.
** Allocating proper man power per style with MMR(Man Machine Ratio).
** Following up the target and effective way to rectify.
** Generating daily production report, costing report and daily efficiency report.

Work Experience :
Duration :From 05 January 2010 – 25 December 2012
Designation :Sr.Industrial Engineer.
Organization : Orient Craft. Ltd.

** Handling a machine capacity of 400 machines.
** Improving productivity & Efficiency
** Developping sewing and handling methods and training to workers.
** Optimum Utiliztion of machines & man power.
** Making garment production feasible through R & D
** Managing Unit cost.
** Allocating proper man power per style with MMR(Man Machine Ratio).
** Following up the target and effective way to rectify.
** Generating daily production report, costing report and daily efficiency report.
** Generating upcoming style's OB,NSR,Layout, & Process Flow,

Work Experience :
Duration :From 12 September 2007 – 30 December 2009
Designation :Industrial Engineer.
Organization : Instyle Exports P.Ltd.

** Handling a machine capacity of 200 machines.
** Improving productivity & Efficiency
** Optimum Utiliztion of machines & man power.
** Allocating proper man power per style with MMR(Man Machine Ratio).
** Following up the target and effective way to rectify.
** Generating daily production report, costing report and daily efficiency report.
** Generating upcoming style's OB,NSR,Layout, & Process Flow,

Job Profile :
Planning :
** Generate theweekly performance report against the planning.
** Identify types of machine required for each style & NSR Sheet For Every Style
** To prepare the operation bulletin and machine layout for style & quality requirements before feeding the bulk.
** To co-ordinate with sampling at the Pilot(Sampling) stage of garment (R &D) so as to get the best possible.
** Decision on attachments and folders, & make sure availability of m/c & attachment to be used prior to production & prepare line layout according to correct method sequence.
** Thread consumption report.

Production Floor :
** Line setting, line balancing and Identify bottleneck operations to achieve desired target output.
** Reduced throughput time for new style Loading in line.
** Identify and eliminate the unnecessary manual operation in the sewing floor and allocate ideal manpower.
** Method study(time and motion study) use of modern equipment’s and work place engineering to improve productivity.
** Recording lost time, Cost of lost time and to follow every thing to reduce the lost time.
** Find out the reason for lost time and inform factory management to take firm action.
** Monitor Input & output plan to achieve the daily targets.
** Use maximum attachments & specialized machines for increase the productivity..

Achievement :
** Improve Efficiency Productivity upto 8-9% by Proper R&D(Before Line Setting) and Introducing hourly production reports.
** Improve SOP of the Production Floor.

·Control MMR upto 1 :1.65.
** Design and develop formates and system for capturing productivity.
** SAM Standardized with actual process.

Professional Qualification :
** One Year Diploma in AMT From ATDC (Apparel training & Designing Cent Approved By Govt.


India Ministry Of Textile, AEPC)
** Done Four Months Training in Pro-SMV from Method Group(Mr.Rodger Thomas) Apparel House Sector-44 Gurgaon Haryana.
** Done 6 Months Training in LEAN Manufacturing System(Mr.Charles Daugher) from Orient Craft Ltd. 7D Gurgaon Haryana,

Academic Qualification :
** Graduation from V.B.S.Purvanchal University Jaunpur (50%)
** Intermediate from U.P.Board. (61%)
** High School Fron U.P.Board. (64%)

Computer Proficiency :
** MS Office (Word, Power Point, Excel.)

Permanent Address :
VILL+POST-  : DUDHAILLA
DISTT.-  : BALLIA, UTTAR PRADESH

Personal Profile :
Father’s Name  : Shri Madan Kunwar
Date of Birth  : August 15th 1984
Sex  : Male
Marital Status  : Married
Languages Known  : English, Hindi
Present Salary  : INR 80K
Expected Salary  : Negotiable.
Passport Number  : M1379977
Skype ID  : dhruvkumarsingh19841

I undertake that above mentioned Information is true to the best of my knowledge and belief.

Date :
Place :

(Dhruv Kumar Singh)

Notes

1. This is an online resume, managed by the candidate.
2. Create your online resume here.
3. If candidate allows, recruiters can contact the candidate directly.
4. Personal and contact details can be kept private optionally by the candidate.
5. Create a link to this online resume where ever you want in the web.